Loading...
Report 11/14/00 TUE 09:33 FAX U1001 G EO DESIGN? Gcorechnical • Environmental Geological Fax Transmittal To David Lintz From James Stone Company: Meadowlark Partners, [IC Date: November 14, 2000 Fax: 503-297-6184 Phone: 503.297 -6080 cc: Perlo McCormack Pacific, Dean Hickok 503 - 639.4134 City of Tigard, Building Department 503 - 624 -3681 _ GDI Project: Meadowlark -1 RE: TOC Office Building Addition, Gresham w _ 0 Urgent ❑ For Review ❑ Please Comment ❑ Please Reply No. Pages Description: 1 Fax Transmittal 2 Field Report for 10/24/00 3 Total Pages Comments: jl)itilo g� - 7 .. g l s 4 t) 3 w.�cuo (�i ¢,ceL ri-d < 0(411_. L 4-2.447l.lf/rn.4t144„ FII.E COPN • CONFIDENTIAL NOTICE The Information contained hi this faerimile Is confidential and may also be tubJea to rise anarney diem privilege. The Infarmadon is Intended only for die use tithe individual or entity to whom It Is addressed. if the reader of this mmasge Is not the Intended recipient, this services as notification that any reading, disclosure, copying, distribution, or the taking of any action in reliance on the contents of this oemmunieadon Is strictly pmhd+letd. If thls transmission was received in ernx, okay!' Immediately ratify us at (509) 968$787 and rearm the anginal message to meat the address abuts via the U.S. Postal Service 14945 SW Sequoia Parkway • Suite 170 • Portland, Oregon 97224 • Phone (503) 968-8787 • Fax (503) 968 -3068 11/14/00 TUE 09:33 FAX 14002 s r T 0E r Ct)V gk.. ...^ Cili* .141'1Ftiraroninenyr j .^:,..... Field Report Page 1 oft GDI Project: Meadowlark -I Prepared By: James E. Stone, E.I.T. Project Name: TOC Office Building Addition Date: October 24, 2000 Location: �.. SE 1st Street, Gresham OR Report*. Arrival: 0845 Departure: 1700 Weather Sunny, 50's — Permit P. City of Tic and #2000 -00046 Purpose: Building slab subgrade preparation I arrived onsite at the request of Perlo McCormack Pacific to observe subgrade preparation in the building pad. I met with Mr. Dean Hickok, the project superintendent, during my visit. I also met with representatives of Wilbur West during my visit. I departed the site at approximately 0930 and returned at approximately 1600. The following is a summary of my observations. At the time of my arrival, I observed the existing concrete pond had been removed, along with much of the associated utility piping on the north end of the pond. I observed subgrade conditions to be variable, with stiff to very stiff native silt exposed in some in some areas, while I observed soft to medium stiff silt and gravelly silt fill in others. I observed several trenches exposed during the excavation process. I also observed several gravel wells at the terminus of the building downspouts. The downspouts have been directing water into the area, resulting in wet subgrade conditions throughout the area. Much of the areas where soft silt and gravelly silt fill was observed, particularly where the soil is wet, will likely not support construction equipment during grading. For • constructibility purposes, we recommend these areas be over -excavated and backfilied with compacted crushed rock. The recycled aggregate used for an access road to the building pad would be acceptable for use as well. We recommend soft subgrade areas be over - excavated no more than 18 inches below bottom of slab, at which time we may reevaluate the exposed subgrade and provide further recommendations as necessary. I also recommended the project owner be involved in the decision as to what depth we may over - excavate. Upon my return in the afternoon, I observed excavations in the northern half of the new addition extending at least 3 feet below subgrade elevation. According to the contractor, soft, saturated fill and some existing utilities were removed from these areas. The exposed subgrade in this area consists of stiff native silt and stiff silt and gravelly silt fill. I spoke with Dean and with Mr. Wilbur West about soil conditions in this area. Over - excavation to this depth may not be necessary, and we were not allowed to reevaluate subgrade conditions at 18 inches below bottom of slab, as we had requested. However, based on observation, in our opinion, the subgrade observed has been prepared in general accordance with our recommendations and project specifications. I observed Wilbur West excavating near existing spread footings_ These footings are supporting the second story overhangs of the existing building, which are planned for demolition sometime in the 14945 SW 5equata Parkway • Suite 170 • Portland, Oregon 97224 • Phone (503) 968 -8787 Fax (503) 968 -3068 • 11/14/00 TUE 09:34 FAX al 003 ;CC'iJ:i•j 'C F7 gip. pc J � EI tii Field Report Page 2 of 2 next few weeks. However, these sections are still occupied at this time. I observed Wilbur West excavating up to two of the four sides of these footings while over-excavating soft spots in the slab area. We recommend the excavations do not expose the soil column directly beneath the footings. Excavating the surrounding soil adjacent to the footings in this manner is unsafe, and may result in catastrophic foundation failure. These areas should not be left open without temporary shoring, underpinning, or other methods to assure the foundations are stable. I recommended to Wilbur West and Dean Hickok the soil around the footings already exposed be immediately backfiiied and compacted with gravel a distance of at least 4 feet out from the edge of the footing. • • Signature: This rejoin preterits op+rmna funned as a result of our ohxrvaevn of weeeee mating to geotechnicel engitserbg ar ciweeig rental seMas We the connector to comply with the plans and spsddeatbns throughout the duration ofsha project Irrespective of the presence of our representative. Owasirk does not Irdude supeMsion or direedon of the contractor, the contractor' s empbyees or agents. our firm is not responsible for die =reg. 14945 SW Sequoia Parkway • Suite 170 • Portland, Oregon 97224 • Phone (503) 968.8787 • Fax (503) 968 -3068 11/09/00 THU 13:29 FAX 002 S ITRoco - zt-5 i r : , �. 1 . .. i 1: Field Report Page 1 of 1 ..... _. ..— ...._ —..._ _....._ _...._.__...__ -_...- - - i James E. I.T. Stone, E GDI Project: Meadowlark -1 Prepared By: _ . _...-- - - - - -- Project Name. a TOC Office Buildin ' Addition Date: i October 5, 2000 i Location: 6825 SW Sandberg Street, Report #: Tigard, OR _.._.. ^_........ __ ..._..... _ — ......... ....__�.._ - ..:. - — ....__...._ Arrival: ..._..._ 1430 - - —_R .._ Departure: , 1530 ...- Z _... Weather: Sunny, 70's Permit*: 1 2000 -00046 Purpose: Keystone Wall Construction _....___� ...._............_ -- - I arrived onsite at the request of Perlo McCormack Pacific to observe paving operations. I met with Dean Hickok, the project superintendent, during my visit. I also met with Jerry Mortenson of Mort's Construction during my visit. The following is a summary of my observations. At the time of my arrival, I observed the planter had been removed from the northwest corner of the existing parking lot, and a Keystone wall was being constructed in this area. I observed 4 rows of blocks already in place on the eastern half of the walk No blocks had been placed for the western half of the wall. Vertical cuts up to approximately 4 feet have been excavated as part of the wall construction. I observed very stiff, damp native silt in the excavation walls. The excavation appears stable. I observed a gravel pad approximately 6 inches thick being placed below the first level of with a Keystone blocks for the western half �of observed a stockpile of clean, being gular drain rock Wacker hand - operated vibratory p k whi h will be used for wall backfill. Based on observation, In our opinion, the retaining wall Is being constructed in general accordance with our recommenda$1lons and project specifications. Several additional parking spaces are being created around the wall noted above, and throughout the existing parking lot. I observed the subgrades for most of the spaces had been prepared arfd covered with gravel prior to my visit. Where subgrades where exposed, I observed very stiff, damp native silt. I probed the subgrade with a »Inch steel foundation probe, and was unable to penetrate more than »inch with difficulty. Based on observation and probing, In our opinion, the subgrades are being prepared in general conformance with our recommendations and project specifications. i ' 1p Signature: • IroeM9 or wrikonmardai . ow We rah on the contractor to The report s s end sp fomwd n t tam d our r ailed tgn r¢ a AtMz ,uMth m . . • .• - - - of our Zresenof r . den not d+d th evpervblon or oomph wish the t ad tamed d+rou9 the dilution d die prVJet w�dire of the direction d the fir, the oaneMOri mph oraom our firm IN not ,05pensIbia for site safety, 14945 SW Sequoia Parkway • suite 170 • Portland, Oregon 97224 • Phone (503) 968 -8787 • Fax (503) 968 -3068 1 11/09/00 THU 13:30 FAX VI 009 pr Field Report Page 1 of .. __, .....__...- - -_... �_..._ By: lames E Stone E.1 Prepared By. , T. Meadowlark -1 _._.. COI Project: '- .•......_-' J - ....---....._--- ....._.___...----- • .__.. -- = Project Name TOC Office Building Addition Date: October 6, 2000 Location: 6825 SW Sandberg Street, Report #: Tigard, OR .. - ._... - -- Arrival: 1500 _... ...._ .� ... _r Departure: •• 1545 .......__....... -_._._ ....._.. -. . ____.�..�._ ._- • - - - -- �• - Permit #: } 2000-00046 Weather. Sunny, 70's Purpose: Keystone Wall Construction __•••• -- - - ° ~ I arrived onsite at the request of Perlo McCormack Pacific to observe paving operations. l met with Dean Hickok, the project superintendent, during my visit. I also met with Jerry Mortenson of Mort's Construction during my visit. The following is a summary of my observations. At the time of my arrival, i observed the Keystone wall has been constructed. I observed clean, angular drain rock has been placed as wall backfill. Based on observation, In our opinion, the retaining wall is being constructed in general accordance with our recommendations and project specifications. The additional parking spaces around the wall noted above and throughout the existing parking lot have been rocked and the base rock compacted. The gravel consists of 1 -inch minus gravel supplied by Tigard Sand and Gravel. I performed density tests In several of the parking stalls with a Troxler 3430 nuclear density gauge, comparing the test results to a modified proctor value of 135 pcf. The test results indicate dry densities of approximately 129.2 to 131.3 pounds per cubic foot, which translates to approximately 96% to 97% of the maximum dry density. Based on observation and compaction test results, in our opinion, the subgrades are being prepared in general conformance with our recommendations and project specifications. 1 observed the planter area on the eastern property margin has been stripped in anticipation of grading operations. I observed native silt soil exposed throughout the area. I observed scattered thin roots less than Winch in diameter In the subgrade. However, the vast majority of vegetation has been removed in accordance with our recommendations and project specifications. Signature: AP-AA " • WW Na report presents eprdam , ..,, m a a does rely the convenor w firmed a result d our observation t a Pr =WW2 meters to • - . - . nalmoring or wa + the plant and spew n eracto rhra the &rad WV. Ow firm Is net for 5 ' . dheettandtl , eeonp�r+. the w�'na�9eMplWea� �� 14945 SW Sequoia Parkway • Suite 170 • Portland, Oregon 97224 • Phone (503) 968-8787 • Fax (503) 968.3068 11/09/00 THU 13:30 FAX Rioo4 J WH ' Field Report Page 1 of 1 CD1 Project: Meadowlark -1 Pre ared By: lames E. Stone, E.I.T. Project Name: TOC Office Building Addition Date: October 13, 2000 Location: 6825 SW Sandberg Street, Report #: Tigard OR Arrival: 1445 Departure: 1530 Weather: Sunny, 70's Permit #: 2000 -00046 Purpose K Wall Construction I arrived onsite at the request of Perlo McCormack Pacific to observe paving operations. with Dean Hickok, the project superintendent, during my visit. I also met with Jerry of Mort's Construction during my visit. The following is a summary of my observations. At the time of my arrival, I observed the Keystone wall along the eastern property boundary being constructed. I observed clean, angular drain rock has been placed as wall backfill within an approximate 1.5 -foot drainage zone along the back of the wall. I observed silty sand fill being placed behind the wall beyond the drainage zone. The silty sand is being Imported from another construction site. I had obtained a sample during my previous visit for laboratory testing. Approximately 2 feet of fill has been placed. I performed density tests in the fill with a Troxler 3430 nuclear density gauge, comparing the test results to a modified proctor value of 126 pcf. The test results Indicate dry densities of approximately 122.2 to 125.3 pounds per cubic foot, hi ch on translates to approximately 97% to 99% of the maximum dry density (ASTM observation and compaction test results, in our opinion, the fill is being placed in general conformance with our recommendations and project specifications. • Signature: . � . , _ ,- . , .: • e rely on she tornados � This report Forma ooirdoee formed as a remit °routahse7b sn of activities rearm co " . of wr ►e . °- Uuraak does not include supervision or tompty maim f e oporhms ends the eo >�ns than �OM °� ern poled iriesnourtent si not,esponstbtee far see see safer• d rr�en Mtcontractor, or, the mMracror'° employees agents, 1 4945 SW Sequoia Parkway - Suite 170 - Portland. Oregon 97224 • Phone (503) 968-6787 • Fax (503) 968-3068 k r 11/09/00 THU 13:29 FAX Ii 001 t .f G EODESIGNa Geotedtrdcal Environmental • Geological Fax Transmittal To: David Lintz From: James Stone Company: Meadowlark Partners, LLC Date: November 9, 2000 Fax: 503- 297 -6184 , Phone: 503- 297 -6080 �_- cc: Perlo McCormack Pacific, Dean Hickok 503 - 639.4134 _�• City of Tigard, Building Department 503.624 -3681 GIN Project: Meadowlark-1 RE: TOC Office Building Addition, Gresham 0 Urgent 0 For Review 0 Please Comment 0 Please Reply No. Pages Description: 1 Fax Transmittal 1 Field Report for 10/5/00 1 Field Report for 10/6/00 _ _ 1 Field Report for 10/13/00 4 Total Pa es Comments: • • GONRO IT AL NOTICE The btformadon mntalned in this facsimile is emdlifentlal and may also he stilted to one rtmorneycilanptMhept The infotmatlon Ia Wended only for the use of the i dIAdual or entity to whom it is addressed. II the reader of this merge Is not Um Inrerded recipient, this salon of netglWhn that any reading. please immediately no (503) 9668 8787 a d maim dre original menage of this de mess above r m d ie prohibited Rand V)a. 4 won was received in Dior. 1 494 5 SW Sequoia Parkway • Suite 170 • Portland, Oregon 97224 • Phone (503) 968 -8787 • Fax (503) 968 -3068 •