Loading...
Permit CITY OF TIGARD BUILDING PERMIT PERMIT #: BUP2000 -00186 s l �"��y J DEVELOPMENT SERVICES D ATE ISSUED: 05/23/2000 13125 SW Hall Blvd., Tigard, OR 97223 (503) 639 -4171 PARCEL: 2S1156A -90102 SITE ADDRESS: 11992 SW ROYALTY CT 2 SUBDIVISION: ZONING: BLOCK: LOT: JURISDICTION: KIN REISSUE: FLOOR AREAS EXTERIOR WALL CONSTRUCTION CLASS OF WORK: OTR FIRST: , sf N: S: E: W: TYPE OF USE: MF SECOND: sf PROJECT OPENINGS? TYPE OF CONST: UNK sf N: S: E: W: OCCUPANCY GRP: R3 TOTAL AREA: 0.00 sf ROOF CONST: FIRE RET? OCCUPANCY LOAD: BASEMENT: sf AREA SEP. RATED: STOR: HT: ft GARAGE: sf OCCU SEP. RATED: BSMT ?: MEZZ ?: REQD SETBACKS REQUIRED FLOOR LOAD: psf LEFT: ft RGHT: ft FIR SPKL: SMOK DET: DWELLING UNITS: FRNT: ft REAR: ft FIR ALRM : HNDICP ACC: BEDRMS: BATHS: IMP SURFACE: PRO CORR: PARKING: VALUE: $ 8,160.00 Remarks: Reroof existing condimium. Work completed without permit - Double fees applied. Any questions see Bob Poskins. Owner: Contractor: LAMBETH, ARLINE F INTERSTATE ROOFING 11992 SW ROYALTY CT 15065 SW 74TH AVE 0 I N /� j KING CITY, OR 97224 TIGARD, OR 97223 Phone: Phone: 684 -5611 'v /� L Reg #: SIC 00055485 FEES REQUIRED INSPECTIONS Type By Date Amount Receipt Misc. Inspection PRMT KJP 05/23/200C $114.75 0002394 Final Inspection PRMT KJP 05/23/200C $114.75 0002394 5PCT KJP 05/23/200C $9.18 0002394 Total $238.68 • This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more than 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952 - 001 -0010 through OAR 952 - 001 -1987. You may obtain a copy of these rules or direct questions to OUNC by calling (503) 246 -1987. Permitee / / Signature: ` AS _ o li r 0 Issued By: • Call 639 -4175 by 7 p.m. for an inspection the next business day m, i.) /&414 per , f"`b `" CITY OF TIGARD 2( _ • -1'4 e " /Mf'ii 4-1"4144"< N 0 Plan Check #: 13125 SW HALL BLVD. Buz_ .s. '`' A..- AA.4444-' Rec'd By: :TIGARD OR 97223 RE- ROOFING PERMIT APPLICATION Date Recd: V- 503 - 639 -4171 X304 Date to PE: F- 503 - 598 -1960 Date to D T: Permit #:. - Dwa % ' Incomplete or illegible applications will not be accepted Called: I t Name of Development/Business STEP 2. NEW ROOFING ASSEMBLY • ROYAL GARDENS CONDO -Material Documentation (UBC Appendix 15) - Street Address Ste # Please fill out applicable section and attach copy of roofing Job Site 11992 SW ROYALTY CT specifications. Bldg # City/State Zip Listed Assembly ( Circle & Complete A, B or C) 2 KING CITY, OR 97224 A. Name 1. Specification #: INTERSTATE ROOFING, INC. Applicant Mailing Address 2. Manufacturer: 15065 W 74TH AVE City/State Zip Phone *3a UL Classification: TIGARD, OR 97224 684 -5611 Roofing Name Listed UL Building Materials Directory Page #: Contractor INTERSTATE ROOFING. INC. (OR) (Prior to issuance Mailing Address *3b Warnock Hersey : applicant must 15064 SW 74TH AVE. provide a copy of City /State Zip Listed Warnock Hersey Directory Page #: all contractor TIGARD, OR 97224 *COPY OF ASSEMBLY REQUIRED licenses if Phone # Fax # expired in COT 684 -5611 503 - 639 -3056 61>B0 Research #: ICBO ES ER 5443 . database) State Con tr.Contr. Board # 3/9/02 p. Date 55485 L-' DATED: BUILDING INFORMATION C. SPECIAL PURPOSE ROOFING: WOOD SHAKES Building SF e Oise: ('rbeAne) C 2 G (review required by plans examiner) Building - ype of (. f V Constructio ( n: �/ VALUATION OF PROJECT $ sq. ft. 8900 of roof area 8160.00 Existing Deck Type: Permit fee based on valuation* Combustible (x) Non - Combustible ( ) . * see chart on back $ 114.75 RESIDENTIAL ONL Class of Work: Alteration City use only: WACO: ❑ REPAIR (MAJOR) (review required by plans examiner) . (BUILD) (UBUILD) Permit required ONLY when spaced sheathing is covered by solid sheathing. Changes to roof line require Building Permit 8% State Surcharge $ 9.18 Application. City use only: WACO: SUBMIT TWO (2) SETS OF PLANS SPECIFYING. (TAX) (UTAX) A. Roof area & nearest street. *Required for major repairs of Residential B. Attic vents - Provide 1 sq. ft. for each 150 sq. ft. of attic or "C" above * 65% Plan Review $ 74.59 space. Vents shall be located in the upper 1/3 of the roof. City use only: WACO: Provide 1 sq. ft. for each 300 sq. ft. when eave & attic (BUPPLN) (UBUPLN) venting is provided. TOTAL $ 198.52 STEP 1. COMMERCIAL ONLY i I acknowledge that I have read this application and that the Class of Work: Repair . . information given is correct; that I am the owner or authorized D scribe work to be done: (check appropriate box) agent of the owner, and that the plans (if applicable) are in RE - ROOF (circle A ,B or C) • mpliance with regon State law. • A. Existing built -up roof covering to be REMOVED and deck repaired - . • n.l ure ner /Ageint Date B. Existing built -up roof covering to REMAIN: note applicant must submit an engineer's review of the roof structural , 431 elements. Review shall bear the seal (or stamp) of the rchitect or engineer licensed in Oregon. a -ct Person Name Telephone Asphalt or wood shingle /shake ''1" JE t'SS E (01 (PROCEED TO STEP 2) _ I : dsts \forms \roof. res. doc 8/26/99 -- 6 ^lc efe7ei ta0ge ei7 P-u-x;L ayptudi b„, Igr k APPENDIX CHAPTER 15 1997 UNIFORM BUILDING CODE • the listing or manufacturer's installation requirements when licensed by the state to practice as such, indicating that the existing approved by the building official. or modified framing system is adequate to support the additional When the application of new roofing over existing wood tile roof covering. shingle or wood shake roofs creates a combustible concealed Tile shall be applied in accordance with the original manufac- space, the entire existing surface shall be covered with gypsum turer's specifications or when the original manufacturer's specifi- board, mineral fiber, glass fiber or other approved materials cations are no longer available, in accordance with Section securely fastened in place. • 1507.7. Hip and ridge cover on existing shake or shingle roofing shall be Tile may be repaired to match the prior installation except that i removed prior to reroofing application. Roofing overlays may be clay and terra-cotta hips and ridge tile shall be reinstalled with —� installed in accordance with the following: portland cement mortar. Ofi 1. Asphalt shingles. Not more than two overlays of asphalt ... shingles shall be applied over an existing asphalt or wood shingle SECTION 1518 — METAL ROOF COVERING roof. Asphalt shingles applied over wood shingles shall not have less than'Type 30 nonperforated felt underlayment installed prior; Metal roof covering may be applied over existing roofing in to reroofing. • accordance with Table A -15 -A. Reroofing with metal roof cover- ing shall be in accordance with the original manufacturer's speci- 2. Wood shakes. Not more than one overlay of wood shakes fications or when the original manufacturer's specifications are no shall be applied over an existing asphalt shingle or wood shingle longer available as required by Section 1507.8. roofing on structures with a slope of 4 units vertical in 12 units hor- izontal (33% slope) or greater. One layer of 18 -inch (457 mm), Type 30 nonperforated felt shall be shingled between each course SECTION 1519 — OTHER ROOFING in such a manner that no felt is exposed to the weather below the Reroofing with systems not covered elsewhere in Chapter 15 or shake butts. this appendix, such as, but not limited to, those that are fluid 3. Wood shingles. Not more than one overlay of wood shingles applied or applied as nonasphaltic sheets, shall be done with mate - shall be applied over existing wood or asphalt shingles. Wood rials and procedures approved by the building official. shingles applied over asphalt shingles shall not have less than Type 30 nonperforated felt underlayment installed prior to reroof- SECTION 1520 — FLASHING AND EDGING ing. Missing, rusted or damaged flashing and counterflashing, vent SECTION 1517 — TILE caps, and metal edging shall be installed or replaced with new materials. When existing built -up roofs remain, vent flashing, Tile may be applied to roofs with a slope of 4 units vertical in metal edging, drain outlets, metal counterflashing and collars 12 units horizontal (33% slope) or greater over existing roof coy- shall be removed and cleaned. All metal allowed to be reinstalled erings in accordance with Table A -15 -A. Such installations shall shall be primed prior to reroofing installation. Collars and flanges be substantiated by a report prepared by an engineer or architect shall be flashed per the roofing manufacturer's instructions. . 11 4 . 1 q 7/ 0 • TABLE A- 15- A— ALLOWABLE REROOFS OVER EXISTING ROOFING (Inspection and Written Approval Required Prior to Application) NEW OVERLAY ROOFING Asphalt Modified Spray Polyurethane EXISTING ROOFING Built Up Wood Shake Wood Shingle Shingle Tile Roof Metal Roof Bitumen Foam Built Up Yes NP Yes Yes Yes Yes Yes Yes (3:12) (2:12) (2.5:12) • Wood Shake' NP NP NP NP Yes Yes NP NP Wood Shingle' NP Yes Yes Yes Yes Yes NP NP (4:12) Asphalt Shingle' NP Yes Yes Yes Yes Yes Yes NP (4:12) (3:12) (2.5:12) Asphalt over Wood NP NP NP Yes Yes Yes Yes NP Asphalt over Asphalt NP NP NP Yes Yes Yes Yes NP Tile Roof NP NP NP NP NP NP NP NP Metal Roof NP NP NP NP NP Yes NP NP Modified Bitumen Yes NP Yes Yes Yes Yes Yes NP (3:12) (2.5:12) • NP = Not Permitted. Note: (Minimum Roof Slope) 'See Section 1515.2 for specific requirements. 2 Board and batten leveling system must be firestopped in accordance with Section 1516.3. 3 0ne layer 18 -inch (457 mm) Type 30 nonperforated felt interlaced between shake courses required. 4 Type 30 nonperforatcd felt underlayment required for reroofing. 1-336 CITY OF TIGARD BUILDING INSPECTION DIVISION MST 24 -Hour Inspection Line: 639 -4175 Business Line: 639 -4171 66 Date Requested 07 M PM�7 BLD Location // 7� 9 _ i / ' uite o MEC Contact Person Ph PLM Contractor CSC A Ph SWR `BUILDING) Tenant/Owner ELC Retciimrrg Wall ELR Footing Access: Foundation FPS Ftg Drain SGN Crawl Drain Inspection Notes: Slab SIT Post & Beam Ext Sheath /Shear Int Sheath/Shear Framing Insulation Drywall Nailing Fire wall ZeF Fire Sprinkler Fire Alarm to §p31 Ceiling o Misc: inal_ �• PART FAIL PL I BING Post & Beam Under Slab Top Out Water Service Sanitary Sewer Rain Drains Final PASS PART FAIL MECHANICAL Post & Beam Rough In Gas Line Smoke Dampers Final PASS PART FAIL ELECTRICAL Service Rough In UG /Slab Low Voltage Fire Alarm Final PASS PART FAIL SITE Backfill /Grading Sanitary Sewer Storm Drain [ ] Reinspection fee of $ required before next inspection. Pay at City Hall, 13125 SW Hall Blvd Catch Basin Fire Supply Line [ ] Please call for reinspection RE: [ ] Unable to inspect - no access ADA x �` Approach /Sidewalk /V I27 Ext Other Date 5/a� 0 Inspector Final PASS PART FAIL DO NOT REMOVE this inspection record from the job site.