Loading...
Correspondence Mt aMEWLM. - - xke c_TF-= - \ September 24, 1996 RECEIVED City of Tigard Community Development Department aEP 2 6 1996 13125 SW Hall Blvd. • Tigard, Oregon 97223 COMMUNIIy DEVELOPME RE: Revisions to the building permit(s) for Arbor Heights Apartments F- ATTN: Mr. Jim Funk Dear Mr. Funk. The owner has requested a change to the exterior siding material on a portion of the buildings for the project. The request is to add brick veneer. Per your request, attached are two sets of construction documents that illustrate this change. Drawing changes required to effect this change occurred to selected architectural and structural sheets. These revised sheets are what are included. The balance of the drawings are unaffected by this change. Also included for your review are the calculations, prepared by the structural engineer, that illustrate the acceptability of the revisions from a structural standpoint. As you will see in the drawings, the structural integrity of the building has not changed with the exception of the foundation footings being increased in size to accommodate the brick veneer. - The project is currently under construction. It is anticipated that the contractor will be ready to start of the building footings within the next 7 days so any expedited review of this change that you may provide would be greatly appreciated. Should you or any of the other staff have any questions regarding this submittal package or should any additional information be required, feel free to contact me. Sincerely, e-.,.............._ c -- z E. Dennis Riebe AIA cc: Mr. Frank Anderson (Cover Letter Only) Mr. Gary Truitt (Cover Letter Only) ARCHITECTURE AND PLANNING 2110 116th AVE. NE, SUITE D, BELLEVUE, WASHINGTON 98004 PHONE: (206) 451 -4084 FAX: (206) 451 -4078 t , � i JUN -27 -1997 13:05 ?.02/03 • CONLEE Po0 o Bertha Blvd. Bus. (503) 244 -0576 . <6/ Y) ENGINEERS, INC. FAX(503)244 -7023 FIELD INSPECTION REPORT DATE: March 28, 1997 PROJECT: Arbor Heights — � -C� (k(»_ PRESENT: Mike Rada - Drake We inspected Buildings L, M, N & P for compliance with the items noted in our previous report dated 6/5/97 and noted the following: Building 1 - 1. Wall sheathing nailing at studs with holdowns still needs to be done in a few locations. 2. Some pier corner strapping still needs to be done. Buildings M & P (OK) Building N Floor joist to shear wall blocking was added without connection to wall. Add 16d toenails each side from wall plates to underside of blocking. • We inspected Buildings A & B and noted the following: Building A • 1. Ridge blocking does not comply with detail 3/S5.3. See attached fix detail RB -i. 2. Roof sheathing is not nailed to wall blocking per detail 2/S5.3 in some locations. 3. Provide sole plate nailing per details 2 & 3 /S5 1. 4. Some entry pier holdowns are mislocated Building B 1. Same as Building A Item 1. - _ 2. Expansion bolts at longitudinal shear wall on plywood side are missing. 3. Solid blocking is required on top of deck beams pocketed into the wall. d 4. Same as Building A Item 4. �We also nsi p etted - the -cr awl - space - post - to - footing _connectionsin;BuildinE g_ and noted _themt67 (be per our - requirements._, g�. BY: Douglas G. Gannett CC: Gary Truitt - Security Capital Mike Rada File - RA10328.97 01/17 09:13 5036202560 ACI MECHANICAL PAGE 01 Phunbhro R.C.I. Mechanical Heath* 12300 SW 69th Ave. 4lgord, OR 97223 To: • Tom Plescher 1.17 -97 City of Tigard Building Dept. Re: Expansion Tanks at Arbor Heights Tom: As per our conversation concerning expansion tanks, I am deleting them from the Arbor Heights Project. Under section 1007 paragraph C of the Oregon amendments (1991) they are not needed. Thank You, Keith Johnson P.S. Please inform me if any problems arise concerning this matter. c.c. Tom Plescher Bruce Van Hines s 191 fkupe,