Loading...
Permit V CITY OF TIGARD COMMUt1ITY DEVELOPMENT DEPARTMENT MASTER PERMIT 13125 SW Hall Blvd. Tigard, Oregon 97223.8199 (503) 839 -4171 PERMIT # • MST9 5- 0 03o 639 -4171 DATE ISSUED: 02/03/95 PARCEL: 2S104BD -RM004 SITE ADDRESS...: 13790 SW ROSY CT SUBDIVISION • ROSE MEADOWS ZONING: R -7 BLOCK • LOT • 004 BUILDING REISSUE: DWELLING UNITS:1 BASEMENT :0 sf CLASS OF WORK. :NEW BEDRMS:4 BATHS:3 GARAGE :430 sf TYPE OF USE...:SF FLOOR AREAS REQUIRED SETBACKS TYPE OF CONST. : 5N FIRST • 1072 sf LEFT..: 7 ft RIGHT. : 1 1 ft OCCUPANCY GRP.:R3 SECOND...:988 sf FRONT.:20 ft REAR..:28 ft 51UKIE5 •2 FINBSMENT:0 sf REQUIRED -- HEIGHT •25 ft TOTAL - - - -- -:2060 sf SMOKE DETECTORS.:Y FLOOR LOAD •40 psf VALUE $• 140196 PARKING SPACES..:1 Remarks: PATH I PLUMBING SINKS •1 FLOOR DRAINS •0 BACKFLOW PREVNTRS..:1 LAVATORIES •4 WATER HEATERS... :1 TRAPS •0 TUB /SHOWERS •3 LAUNDRY TRAYS... :1 CATCH BASINS 0 WATER CLOSETS..:3 SEWER LINE (ft).:0 GREASE TRAPS •0 DISHWASHERS •1 WATER LINE (ft) •100 OTHER FIXTURES •0 GARBAGE DISP...:1 RAIN DRAIN (ft).:0 WASHING MACH...:1 SF RAIN DRAINS..:1 - -- MECHANICAL - FEES FUEL TYPES UNIT HTRS..:0 type amount by date recpt /GAS/ / / VENTS :0 TIF $ 1550.00.JF 02/03/95 - MAX INPUT:0 BTU VENT FANS :4 SWM $ 180.00 JF 02/03/95 - FU ?iN < 100K ..:0 HOODS • 1 SWM $ 100.00 JF 02/03/95 - FURN >=100K ..:1 WOODSTOVES. : 0 BPRT $ 535.50 JF 02/03/95 - FLOOR FURN •0 CLO DRYERS.: 1 BPLC $ 348.08 KAR 01/12/95 95 -- 260482 BOIL /CMP < 3HP:0 OTHER UNITS:1 B;PC $ 26.78 JF 02/03/95 - GAS OUTLETS:1 PARK $ 500.00 JF 02/03/95 - Owner. -- MPRT $ 45.00 JF 02/03/95 - JAY MILLER MPLC $ 11.25 JF 02/03/95 - P 0 BOX 230459 N5PC $ 2.25 JF 02/03/95 - 3BTH $ 225.00 JF 02/03/95 - IIBARD OR 97281 P5PC $ 11.25 JF 02/03/95 - Phone #: 684 -7543 EROS $ 64.00 JF 02/03/95 - Contractor: ERPC $ 20.80 JF 02/03/95 - J1=tY MILLER ERPC $ 20.80 JF 02/03/95 - PO BOX 23201 TIGHRD OR 97281 Phone ## : 684 -7543 Reg #.. : 30109 $ 3640.71 TOTAL This permit is issued subject to the regulations contained in the REQUIRED INSPECTIONS Tigard Municipal Code, State of Ore. Specialty Codes and all other Footing Insp Plumb Top Out applicable laws, All work will be done in accordance with approved Foundation Insp Framing Insp plans. This permit will expire if work is not started within 180 Post /Beam Struct Fireplace Insp days of issuance, or if work is suspended for Nor- than 180 days. Post /Beam Meehan Gas Line Insp , Crawl Drain insulation Insp Permittee Signature( Aire I I L; Plm /undslab Insp Gyp Board Insp PLM /Underfloor Rain drain Insp Issued By: Mechanical Insp Water Line Insp L:a11 tor inspection - b,69 ft) . tai Residential Building Permit Application ))(1) IF ty of Tigard ql 125 S Hall Blvd. Tigard OR 97223 (503) 639 -4171 .. Address: I 5 bdtvtslon:2 Lot # : > ftce. Us e On Y .::.;:.;;:.;:.: <.:;;:<:<:::.:::.>:.;:.;:.: u V1ti� l� �- 0•01.611> 0 /� , :.:::!::::.7:.:::.::!!:.;.i:;iii.01::::ii::::::::::::.!:::*43.7.7...;i::;.::i:Or:S.:Z.1..1:!;:::.;:;..::::.:.::.:.::.:::.:.::.:.".:.:.::.:.::.:.::.:-::.: valuation: �✓ C Corner Lot? Y N Flag Lot? Y / N 1 :;:: & T o o Owner: ill I �_ €'<Approv e ::::::::.::::.:: ..: :.:.:.: : :. 1 Address: d ess• 5 9 q a . Ti ai l . 7 Phone: rJ 1. 0 n r r• Co t acto . : > >Items. equ red :.: . : :. Address: < Subcontract . > > > � < ; ?: m :: >° >:: < : : > : : : : '» Tr D etai l'» . . - -- > : >< < » > > > `> < Phone: e n License # Co tr c or Contractor's s - 3� ( c of current Oregon li Contact Name & Phone : `) m J lLiA (Y 7 73 y 3 Subcontractors: ,/ r Architect /Engineer: Plumbing: � p {�1 �(� 11:7, �T , Addres m echanical: /l L J h (attach c opy of current OR Contracr's License) Phone: JOB DESCRIPTION: (pa • 1 , Applican Si e & . o ne nu r •er / 5 Received by: — Date Received: 1 1 N: \WORD\CO MDEV\RESAPP Permit # Account Description Amount Amt. Pd. Bal. Due /?//15-,003 0 Bldg. Permit (BUILD) 5..3.$.'5 - 0 3 Plumb. Permit (PLUMB) L2 S, cu < ZS Mech. Permit (MECH) State Tax (TAX) Z� �f u • Z f( Bldg: v2.7e7 Plumb: // / Mech: Z // Plan Check (PLANCK) 359, 3.3 / / O 7. 33 - Bldg: -?e/AD Y Plumb: Mech: //. Z 5 / c5c4.1 9 •UU 33 Sewer Connection (SWUSA) vu v 2 Z Sewer Inspection (SWINSP) 3' 3 . . Parks Dev Charge (PKSDC) J b`o Residential TIF (TIF -R) /e/ v / (3" 7 Mass Transit TIF (TIF -MT) / / Commercial TIF (TIF -C) Industrial TIF (TIF -I) Institutional TIF (TIF -IS) Office TIF (TIF -O) Water Quality (WQUAL) / /5-0 Water Quantity (WQUANT) / Fire Life Safety (FLS) Erosion Cntrl Permit (ERPRMT) 6c/ G y Erosion Planck/USA (ERPLAN) Ero Erosion Planck/COT (EROSN) ?-- ' h V TOTALS: 5(7s , „9-Z 1 S� ZS, CITY OF TIGARD PLUMBING PERMIT COMMUNITY DEVELOPMENT DEPARTMENT PERMIT # • MST95 -0030 ,_ 5 13125 SW Hall Blvd. Tigard, Oregon 97223.8199 (503) 639-4171 DATE ISSUED: �� /03! 9 � PARCEL: 2S104BD -RM004 SITE ADDRESS...: 13790 SW ROSY CT SUBDIVISION • ROSE MEADOWS ZONING: R -7 BLOCK LOT •004 CLASS OF WORK..: NEW GARBAGE D I SPOSALS..: 1 TYPE OF USE -SF WASHING MACH •1 BACKFLOW PREVNTRS..:1 OCCUPANCY GRP..:R3 FLOOR DRAINS :0 TRAPS •0 STURIES •2 WATER HEATERS :1 CATCH BASINS •0 FIXTURES LAUNDRY TRAYS •1 SF RAIN DRAINS •1 SINKS •1 GREASE TRAPS -0 ' LAVATORIES .4 OTHER FIXTURES •0 TUB /SHOWERS • SEWER LINE (ft) -0 WATER CLOSETS.. :3 WATER LINE (ft) •100 DISHWASHERS -1 RAIN DRAIN (ft) -0 Remarks: PATH I OWNER: -- FEES -- JAY MILLER TIF $ 1550.00 JF 02/03/95 - P U BOX 230459 SWM $ 180.00 JF 02/03/95 - SWM $ 100.00 JF 02/03/95 - TIGARD OR 97281 BPRT $ 535.50 JF 02/03/95 - Phone #: 684 -7543 BPLC $ 348.08 KAR 01/12/95 95- 260482 B5PC $ 26.78 JF 02/03/95 - Plumbing Contractor - --- -- -- PARK $ 500.00 JF 02/03/95 - MPRT $ 45.00 JF 02/03/95 Name: IOEN %WITS CONSTRUCTION INC MPLC $ 11.25 JF 02/03/95 - Address:R, M5PC $ 2.25 JF 02/03/95 - City: Qom( ,State:f�� 3BTH $ 225.00 JF 02/03/95 - Z i p : g7 LQ�1a - Phone# : 4 =� / PSPC $ 11.25 JF 02/03/95 - Reg #: /DO �o Additional fees not shown here REQUIRED INSPECTIONS -- This permit is issued subject to the reg- ulations contained in the Tigard Municipal Footing Insp Insulation Insp Code, State of Ore. Specialty Codes and all Foundation Insp Gyp Board Insp other applicable laws. All work will be done Post /Beam Struct Rain drain Insp in accordance with approved plans. This Post /Beam Meehan Water Line Insp permit will expire if work is not started Crawl Drain Water Service In within 180 days of issuance, or if work is Plm /undslab Insp Appr /Sdwlk Insp suspended for more than 180 days. PLM /Underfloor Mechanical Final Mechanical Insp Plumb Final Plumb Top Out Building Final Framing Insp Erosion Control / Fireplace Insp >l�. �41 2_�� Gas Line Insp FXitho rized P1umbntractor Signature Call for inspection - 639 -4i75 Contractor Notes: • 5/24/00 Activities for Case #: MST95 -00030 • . 2:14:53 PM Assigned Hold Updated Activity Description Date 1 Date 2 Date 3 To Done By Disp. Level By Updated Notes . MSTA007 Application received 1/12/95 KAR PASS BLT 1/23/95 MSTA010 Plan check deposit paid 1/12/95 KAR PASS BLT 1/23/95 . MSTA020 Plan check by 1/23/95 1/23/95 RT PASS BLT 1/23/95 MSTA030 Check for prcl. restrict. 1/23/95 1/23/95 RT PASS BLT 1/23/95 MSTA705 Footing Insp 2/10/95 RB PASS RB 2/13/95 PENDING- USA INSPECTION; REBAR AS PER ENG. SPECS; 20' GROUND ROD NEEDED. MSTA706 Foundation lnsp 2/10/95 RB FAIL RB 2/13/95 USA INSPECTION; SEISMIC RESTRAINT - MSTA710 Post/Beam Structural 2/22/95 GS APP • GES 2/22/95 MSTA71 1 Post/Beam Mechanical 2/22/95 GS APP GES 2/22/95 • MSTA717 PLM /Underfloor 2/22/95 GS APP GES 2/22/95 MSTA720 Mechanical Insp 3/29/95 RB FAIL RB 3/30/95 see framing this date; MSTA722 Plumb Top Out 3/13/95 MS PASS MRS 3/13/95 MSTA725 Framing lnsp 3/29/95 RB FAIL RB 3/30/95 shear inspection ?: secure fireplace; metal plate protection; mid -span blocking at floor joists; vaulted areas need venting /cross venting; head -out skylight framing; positive connections; r -21 insulation req'd at several locations; exhaust venting incompleted; strong back to rat run needed for over - spanned ceiling joists in aft bedrm; ceiling joists in closet fwd bedrm- no bearing; bracing for ridges /west aft bedrm lack support and /or bearing. MSTA735 Gas Line Insp 3/29/95 RB PASS RB 3/30/95 MSTA740 Insulation Insp 4/6/95 KS NN KBS 4/10/95 #-1- seal around plumbing penetrating subfloor at kitchen MSTA745 Gyp Board Insp 4/12/95 KS DIS KBS 4/13/95 #-1- no plans on site couldn't check if shear applicable at gypsum MSTA755 Rain drain Insp 2/23/95 MS PASS MRS 2/24/95 MSTA760 Water Line Insp 2/23/95 MS PASS MRS 2/24/95 MSTA761 Water Service Insp 2/23/95 MS PASS MRS 2/24/95 MSTA795 Mechanical Final 5/22/95 RB FAIL RB 5/23/95 SEE BUILDING MSTA797 Plumb Final 5/22/95 MS PASS MRS 5/23/95 Page 1 of 3 5 /?4/oo Activities for Case #: MST95 -00030 • 2 :14:53 PM • . Assigned Hold Updated Activity Description Date 1 Date 2 Date 3 To Done By ' Disp. Level By Updated Notes MSTA799 Building Final 5/22/95 RB FAIL RB 5/23/95 SEE REPORT MSTA097 Issue plumbing signature form 2/3/95 JF JF 2/3/95 MSTA092 (F) Issue combination permit 2/3/95 JF JF 2/3/95 MSTB750 Shear Wall Insp 3/17/95 TLP PART TLP 3/20/95 interior shear wall only MSTA770 Misc. Inspection 3/30/95 RB PASS RB 3/30/95 shear- exterior only- most has already been sided. MSTA726 Framing <REINSP> - 3/30/95 RB FAIL RB 3/30/95 incompleted issues. MSTA720 Mechanical Insp 3/30/95 RB FAIL RB 3/30/95 incompleted issues • MSTA720 Mechanical Insp 3/31/95 RB PASS RB 3/31/95 MSTA726 Framing <REINSP> • 3/31/95 RB $ 15 RB 3/31/95 3RD INSPECTION- INCOMPLETED ISSUES FROM PREVIOUS REPORT. SEE REPORT. MSTA726 Framing <REINSP> 4/3/95 RB FAIL RB 4/3/95 NO FEE PAID!!!! MSTA726 Framing <REINSP> 4/4/95 RB PASS RB 4/5/95 pending- seal exhaust vent at . hall bath upstairs. MSTA745 Gyp Board Insp 4/14/95 KS A/N KBS 4/14/95 . MSTA745 Gyp Board Insp 4/1/35 KS A/N KBS 4/14/95 MSTA745 Gyp Board Insp 4/13/95 KS A/N KBS 4/14/95 #-1- extend water proof gupsum to outer edge of tub and down each leg. #-1- gypsum shear not applicable) MSTA765 APPr /Sdwlk Insp 5/8/95 LT FAIL NL 5/22/95 1. Remove mud from sidewalk . areas and regrade for full 4" depth. 2. Remove drain lines in wings of approach - connect to existing weep hole to north. 3. Place boards for wings to curb. 4. Reform wings for 3'. MSTA765 APPr /Sdwlk Insp 5/12/95 LT • FAIL NL 5/22/95 See 5/8/95 inspection for corrections. MSTA765 Appr /Sdwlk Insp • 5/16/95 • LT PEND NL 5/22/95 1. Expansion joints (1/2" feet) required every 40' and at all . cold joints. 2. Be prepared to protect finish. MSTA795 Mechanical Final 5/24/95 RB PASS RB 5/25/95 MSTA799 Building Final 5/24/95 RB FAIL RB 5/25/95 ELECTRICAL FINAL; UNDER -FLOOR VENTS . BLOCKED BY VAPOR BARRIER; PATIO VENTS . RESTRICTED IN VENTED AREA PER VENTS. MSTA795 Mechanical Final 5/25/95 RB . PASS - RB 5/25/95 Page2of3 • 5/24/00 Activities for Case #: MST95 -00030 • 2:14:53 PM Assigned Hold Updated Activity Description Date 1 Date 2 Date 3 To Done By Disp. Level By Updated Notes MSTA799 Building Final 5/25/95 RB PASS RB 5/25/95 MSTA799 Building Final 5/25/95 RB FAIL RB 5/25/95 ELECTRICAL FINAL APPROVAL. MSTA795 Mechanical Final 5/31/95 • KS APP KBS 6/6/95 MSTA•99 Building Final 5/31/95 KS APP KBS 6/6/95 • • Page • 3 of 3 CITY OF TIGARD BUILDING INSPECTION NOTICE Inspection Line (Rec -O- Phone): 639 -4175 Business Phone: 639 -4171 Inspection: Footing Susp. Ceiling Sprink. Rough -in Appr/dw� Foundation Plbg. Underslab Mech. Rough -in Fireplace Post/Beam Struct. Plbg. Top Out Elec. Rough -in FINAL: Post/Beam Mech. San. Sewer Gas Line -Bldg. Plbg. Underfloor Rain Drain Framing - Plumb. Alarm Water Line Insulation -Mech. Underflr. Insul. Shear Wall , Gyp. Bd. - Elect. Date Requested: Ste/ ` K / � Time: AM PM Address: �� 7 `70 Q Builder: Permit #: 3c) THE FOLLOWING CORRECTIONS ARE REQUIRED: I) gi/f/ � "f r "Fr/ii )1 G Gl/J -s ° Q av i e4 uJ. / Gg., 76 Inspector: Gtheli'ua� Date: S -p - g� _APPROVED '< DISAPPROVED APPROVED SUBJECT TO ABOVE Call For Reinsp. CITY OF TIGARD BUILDING INSPECTION NOTICE r Inspection Line (Rec -O- Phone): 639 -4175 Business Phone: 639 -4171 Inspection: • Footing Susp. Ceiling Sprink. Rough -in Appr /Sdwlk Foundation Plbg. Underslab Mech. Rough -in Fireplace Post/Beam Struct. Plbg. Top Out Elec. Rough -in FINAL: Post/Beam Mech. San. Sewer Gas Line -Bldg. Plbg. Underfloor Rain Drain Framing - Plumb. Alarm Water Line Insulation -Mech. Underflr. Insul. Shear Wal Gyp. Bd. - Elect. Date Requested: - / 0-1 "f Time: AM PM Address: (, 3 7 7 0 C%t Builder: Permit #: / 03 THE FOLLOWING CORRECTIONS ARE REQUIRED: - V81 5 ',ropeC(;c-n co rre nt Inspector: .S Date: .5" APPROVED DISAPPROVED APPROVED SUBJECT TO ABOVE /� all For Reinsp. CITY OF TIGARD BUILDING INSPECTION NOTICE kL---"- Inspection Line (Rec -O- Phone): 639 -4175 Business Phone: 639 -4171 Inspection: Footing Susp. Ceiling Sprink. Rough -in : • • r /Sdwlk Foundation Plbg. Underslab Mech. Rough -in Fireplace Post/Beam Struct. Plbg. Top Out Elec. Rough -in FINAL: Post /Beam Mech. San. Sewer Gas Line -Bldg. Plbg. Underfloor Rain Drain Framing - Plumb. Alarm Water Line Insulation -Mech. Underflr. Insul. Shear / Wall Gyp. Bd. - Elect. Date Requested: c ° /(o - q 5 Time: AM PM Address: / 37 o /407 ..."1 Builder: Permit #: 9 . THE FOLLOWING CORRECTIONS ARE REQUIRED: • 7 r 4 / llL 9 ,e d I � / e rill 5 i h 7rP 7") i� , ' / % '' / /i - rfh Inspector: � / �ii� Date: 5' 4,-16" _APPROVED _DISAPPROVED PROVED SUBJECT TO ABOVE _Call For Reinsp. CITY OF TIGARD BUILDING INSPECTION NOTICE Inspection Line (Rec -O- Phone): 639 -4175 Business Phone: 639 -4171 Inspection: Footing Susp. Ceiling Sprink. Rough -in Appr /Sdwlk Foundation Plbg. Underslab Mech. Rough -in Fireplace Post/Beam Struct. Plbg. Top Out Elec. Rough -in Post/Beam Mech. San. Sewer Gas Line -Bldg. Plbg. Underfloor Rain Drain Framing Plumb: Alarm Water Line Insulation -Mech. Underflr. Insul. Shear Wall Gyp. Bd. - Elect. Date Requested: 5 1/ /7 2 . /� " S Time: M PM Address: ` V 2O Builder: Permit #:1g— 0030 THE FOLLOWING CORRECTIONS ARE REQUIRED: Inspector: /77/.....Z Date: 6/2 -/ 1 PROVED _DISAPPROVED APPROVED SUBJECT TO ABOVE _Call For Reinsp. CITY OF TIGARD BUILDING INSPECTION NOTICE Inspection Line (Rec -O- Phone): 639 -4175 Business Phone: 639 -4171 Inspection: Footing Susp. Ceiling Sprink. Rough -in Appr /Sdwlk Foundation Plbg. Underslab Mech. Rough -in Fireplace Post/Beam Struct. Plbg. Top Out Elec. Rough -in FINAL: Post/Beam Mech. San. Sewer Gas Line -Bldg. Plbg. Underfloor Rain Drain Framing - Plumb. Alarm Water Line Insulation -Mech. Underflr. Insul. Shear Wall Al> -/Lo - Elect. Date Requested: 4 /43 / S-- Time: AM PM Address: / 3 ( 0 e9 -< Builder: Permit #: FS e°36 THE FOLLOWING CORRECTIONS ARE REQUIRED: 1�- ioi a yPSua. -, Ovr L C C) r aVe" -TL , <.iv - �,c -cs,‘ jog m, �t/. 'IC' z 1 /":52, 4 1 (i M IL) A-A9, /4 Inspector: ' _ Date: 4 3 ?s APPROVED DISAPPROVEDOVED SUBJECT TO ABOVE _Call For Reinsp. CITY OF TIGARD BUILDING INSPECTION NOTICE Inspection Line (Rec -O- Phone): 639 -4175 Business Phone: 639 -4171 Inspection: Footing Susp. Ceiling Sprink. Rough -in Appr /Sdwlk Foundation Plbg. Underslab Mech. Rough -in Fireplace Post/Beam Struct. Plbg. Top Out Elec. Rough -in FINAL: Post/Beam Mech. San. Sewer Gas • e ;/fin i -Bldg. Plbg. Underfloor Rain Drain Framing ` - Plumb. Alarm Water Line Insulation -Mech. Underflr. Insul. Shear Wall Gyp. Bd. - Elect. Date Requested: G 4-.4 - .l � � V2-0 Time: AM PM Add ress:) b w S nn c4. ff�� Builder: Permit #: `'1 �— Q () 3 V THE FOLLOWING CORRECTIONS ARE REQUIRED: QA4z) s s Inspector: Date: Z I /4l4c APPROVED _DISAPPROVED PROVED SUBJECT TO ABOVE Call For Reinsp. rte. �, G CITY OF TIGARD BUILDING INSPECTION NOTICE Inspection Line (Rec -O- Phone): 639 -4175 Business Phone: 639 -4171 Inspection: ditt Jl___ • .• / / Footin. usp. Ceiling Sprink. Rough- n l Appr /Sdwlk oundatio Plbg. Underslab Mech. Rough -in Fireplace Post/Beam Struct. Plbg. Top Out Elec. Rough -in FINAL: Post/Beam Mech. San. Sewer Gas Line -Bldg. Plbg. Underfloor Rain Drain Framing - Plumb. Alarm Water Line Insulation -Mech. Underflr. Insul. Shear Wall Gyp. Bd. - Elect. Date Requested: O 1 / ,5 Time: AM P Address:I -- - 7 gv G Builder 39'3 // (7(' Permit #: ,;_5 - 003 O THE FOLLOWING CORRECTIONS ARE REQUIRED: C L r T/■15 ei2-i --? CR,r2_, L.� 4s c:2 .4'...y."--c-4k-• v\....z,—....(2._ "\A;-cs A—e,JK t- ?_Ja_L c (N2=- 01A-(1)--: Le .6 1- v -& .. ,— ...L..,,,,n...rs ------) C e--4-4---ts • Z_6 ' . (.>, -C Inspector: A Date: � 1 .6 /`i s - _APPROVED V DISAPPROVED _APPROVED SUBJECT TO ABOVE ` R ; r _Call For Reinsp. • " CRY OF TIGARD BUILDING INSPECTION NOTICE Inspection Line (Rec -O- Phone): 639 -4175 Business Phone: 639 -4171 . Inspection: Footing Susp. Ceiling Sprink. Rough -in Appr /Sdwlk Foundation Plbg. Underslab Mech. Rough -in Fireplace Post/Beam Struct. Plbg. Top Out Elec. Rough -in FINAL: Post/Beam Mech. San. Sewer Gas Line : d•0 Plbg. Underfloor Rain Drain Framing - Plumb. Alarm Water Line Insulation ec Underflr. Insul. Shear Wall Gyp. Bd. - Elect. Date Requested: �oZ (-((J Time: AM PM Address: / �- j 7 � R - 9/3-- G� Builder: d -3 d ��� � erm t #. c / S - D THE FOLLOWING CORRECTIONS ARE REQUIRED: l 2j 0 e1...c,irv--,-,....„Asi Pr,..,-..,..Q. -A.,,,......1 9- - \�3' ( , v—Q Ci s t -7 4 1/4,,,, t I I'Ll-"-- U 4 w }k s e_,x.1/41 s - rk.e. 4A)Lit cA.L.6--/ cAei '%)/ is 41. 1, :∎" : V CZ( \Y Le Inspector: Date: 57 4 J4r APPROVED 41SAPPROVED APPROVED SUBJECT TO ABOVE _ ./Call For Reinsp. CITY OF TIGARD BUILDING INSPECTION NOTICE Inspection Line (Rec -O- Phone): 639 -4175 Business Phone: 639 -4171 Inspection: Footing Susp. Ceiling Sprink. Rough -in Appr /Sdwlk Foundation Plbg. Underslab Mech. Rough -in Fireplace Post/Beam Struct. Plbg. Top Out Elec. Rough -in FINAL: Post/Beam Mech. San. Sewer Gas Line -Bldg. Plbg. Underfloor Rain Drain Framing - Plumb. Alarm Water Line Insulation -Mech. Underflr. Insul. Shear Wall Gyp. Bd. 3 - Elect. Date Requested: Time:/1 AM PM Address: //?? n^ y� 0030 Builder: Permit #: ` LC -- THE FOLLOWING CORRECTIONS ARE REQUIRED: PC Z ot Z �� ��-- c��v -- - �-�� -✓ V sue, -}' S �` 2 sa--- -rA w/ U Inspector: Date: S/2 47q.C / _APPROVED _DISA PPROVED APPROVED SUBJECT TO ABOVE 'For Reinsp. , ---t/L4J1-c_ c k 4-1,1, n on:\ --k---tic ---k"... CITY OF TIGARD•BUILDING INSPECTION NOTICE — Inspe me (Rec -O- Phone): 639 -4175 Business Phone: 639 -4171 Inspection: 3 Footing Susp. Ceiling Sprink. Rough -in Appr /Sdwlk Foundation Plbg. Underslab Mech. Rough -in Fireplace Post /Beam Struct. Plbg. Top Out Elec. Rough -in NAC Post/Beam Mech. San. Sewer Gas Line -:Id•. Plbg. Underfloor Rain Drain Framing - Plumb. Alarm Water Line Insulation __uIZIII Underflr. Insul. Shear Wall Gyp. Bd. - Elect. Date Requested: S /2-7in c --- Time: AM PM Address: 31 V " W S L Q. Builder: L Cs a' --- . " - 4 3 Permit #: — 3Q 3 THE FOLLOWING CORRECTIONS ARE REQUIRED: Cc, '\ cA-3 d) ■ L -' W 6b, p.,,,.....„....._ „..:„... - 1 - 2/e-- e-y.._.41 -9 c ---- 2...2.11S r - S - \-\.w. \...\_,,.......4),_,,c- \ , -- L .4. T ilk, `; w`- S . c L -t.t ,c, 9 --r - ry ,. Le c. -k r _) -Q_,7�,�' 3 , i„,„. w L �,.,. -�— x Inspector: Date: 772-7--/M APPROVED _415CSAPPROV90 APPROVED SUBJECT TO ABOVE :C)? =' all For Reinsp. CITY OF TIGARD BUILDING INSPECTION NOTICE ▪ Inspection Line (Rec -O- Phone): 639 -4175 Business Phone: 639 -4171 ▪ Inspection: Footing Susp. Ceiling Sprink. Rough -in Appr /Sdwlk Foundation Plbg. Underslab Mech. Rough -in Fireplace Post/Beam Struct. Plbg. Top Out Elec. Rough -in FINAL: Post/Beam Mech. San. Sewer Gas Line -Bldg. Plbg. Underfloor Rain Drain Framing - Plumb. Alarm Water Line Insulation -Mech. Underflr. Insul. Shear Wall Gyp. Bd. - Elect. Date Requested: Time: AM PM Address: Builder: Permit #: �S - 0 3 U THE FOLLOWING CORRECTIONS ARE REQUIRED: 4 4' 4- ( • ►�- ( Inspector: Date: Si G APPROVEDPPROVED APPROVED SUBJECT TO ABOVE 2k, -3 ? — etc Reinsp. l ' CITY OF TIGARD BUILDING INSPECTION NOTICE -.- Inspection Line (Rec -O- Phone): 639 -4175 Business Phone: 639 -4171 • Inspection: Footing Susp. Ceiling Sprink. Rough -in Appr /Sdwlk Foundation Plbg. Underslab Mech. Rough -in Fireplace Post/Beam Struct. Plbg. Top Out Elec. Rough -in FINAL: Post/Beam Mech. San. Sewer Gas Line -Bldg. Plbg. Underfloor Rain Drain Framing - Plumb. Alarm Water Line Insulation -Mech. Underflr. Insul. Shear Wall Gyp. Bd. - Elect. Date Requested: Time: AM PM Address: Builder: Permit #: qs — 3Q THE FOL O}NING CORI3CTIONS ARE REQUIRED: (7 3 4.-J--i' 1 - 3 , -4 (-4."../. • E-7).. 4- s : L - is .n.(2.- ` A, _ 1 t k ki\A. rt."../•- 4--c....-,-. L., /` .C.....i- 494 ..‹.-,()_.,e K...),_, r..,_ --Qt Inspector: j Date: / ` _APPROVED ePPROVED APPROVED SUBJECT TO ABOVE 2 -0.... all For Reinsp. 1. CITY OF TIGARD BUILDING INSPECTION NOTICE Inspection Line (Rec -O- Phone): 639 -4175 Business Phone: 639 -4171 Inspection: Footing Susp. Ceiling Sprink. Rough -in Appr /Sdwlk Foundation Plbg. Underslab Mech. Rough -in Fireplace Post/Beam Struct. Plbg. Top Out Elec. Rough -i iiiiWaPIIPP Post/Beam Mech. San. Sewer Gas Line Plbg. Underfloor Rain Drain Framing - Plumb. Alarm Water Line Insulation -Mech. Underflr. Insul. Shear Wall Gyp. Bd. - Elect. Date Requested: 5 3/ Time: AM 2-- Address: / 3 7 F0 " C_I Builder: 78/ 9/5 Permit #: 95 THE FOLLOWING CORRECTIONS ARE REQUIRED: Inspector: Date: S 3/ Z-- DISAPPROVED APPROVED SUBJECT TO ABOVE _Call For Reinsp. CITY OF TIGARD BUILDING INSPECTION NOTICE Inspection Line (Rec -O- Phone): 639 -4175 Business Phone: 639 -4171 ' Inspection: Footing Susp. Ceiling Sprink. Rough -in Appr /Sdwlk Foundation Plbg. Underslab Mech. Rough -in Fireplace Post /Beam Struct. Plbg. Top Out Elec. Rough -in FINAL: Post/Beam Mech. San. Sewer Gas Line - Idg. Plbg. Underfloor Rain Drain Framin -Plumb. Alarm Water Line Insulation -Mech. Underflr. Insul. Shear Wall Gyp. Bd. - Elect. Date Requested: 'J/3 ((< Time:AM PM Address: / 7 9(6 e-5C. C, Builder: ���J�LC/ Permit #: ! S -- C'3) THE FOLLOWING CORRECTIONS ARE REQUIRED: 1Q,6 Ze...Q____ --7_,L.::. ∎f h F . ∎,_ _ 3 . . . r /\ ) k j j" D ( 1 ' n Inspector: Date:' ?j am �1 _APPROVED SAPPROVED _APPROVED SUBJECT TO ABOVE - \ - R■;-j I For Reinsp. CITY OF TIGARD BUILDING INSPECTION NOTICE 'Inspection Line (Rec -O- Phone): 639 -4175 Business Phone: 639 -4171 Inspection: Footing Susp. Ceiling Sprink. Rough -in t ie/ ppr /Sdwlk Foundation Plbg. Underslab )Rough -in ° Fireplace Post/Beam Struct. Plbg. Top Out Elec. Rough-in FINAL: Post/Beam Mech. San. Sewer Gas Line I le— -Bldg. Plbg. Underfloor Rain Drain raming - Plumb. Alarm Water Line Insulation -Mech. Underflr. Insul. Shear Wall Gyp. Bd. - Elect. Date Requested: .--3/3 / / c/3 Time: AM PM Address: I 73 90 • �j' Builder: Permit #: J s —6 63 0 THE FOLLOWING CORRECTIONS ARE REQUIRED: P4.- b I o ; S w.�..„ .� -ter Gl 0 5 O '''C `)'�i _ V :=ems` c Av . 2 ' /2\.oc 5 - U -if C OA l i (Are-c 4- S�- u :� --v` .-✓` 6 5:1) . 4 , �► LA A aU 1 6 v mot-* Tik s 5 0 r tel --,0 1A4.-i Nivs ' o - ice,,\ cb ifIN.2.- A i.A. D \ Ai k----e_. ?-r Ni-e_e...L.__A Inspector: Date: 3/ 3) /'7 APPROVED ---[JISAPPROVED APPROVED SUBJECT TO ABOVE /Call For Reinsp. c 1 CITY OF TIGARD BUILDING INSPECTION NOTICE - ' Inspection Line (Rec -O- Phone): 639 -4175 Business Phone: 639 -4171 inspection: Footing Susp. Ceiling Sprink. Rough -in Appr /Sdwlk Foundation Plbg. Underslab Mech. Rough -in Fireplace Post/Beam Struct. Plbg. Top Out Elec. Rough -in FINAL: Post/Beam Mech. San. Sewer Gas Line -Bldg. Plbg. Underfloor Rain Drain Framing - Plumb. Alarm Water Line Insulation ' -Mech. Underflr. Insul. Shear Wall Gyp. Bd. - Elect. Date Requested: Time: AM d�PM Address: '� - Z Q �.-- Builder: Permit #: q -6 Q "R d T :OLTAVG C� QRRECTIO RE REQUIRE Q: D ,o r.M^ • — ■C? - Q— d - . c� ) L� �1/.. L�rw„ ,) _* o . t S S -.....•-sl_S - ` d - 4 t --c R - NA/ _S + 1 -' c e 7 t E - N. , .i.r Lk.-t-....9-r .,‘./.' s 0.-.2_,A-- ,.....-- - Inspector: Date:// /cc _APPROVEDPPROVED _APPROVED SUBJECT TO ABOVE C C,--( _all For Reinsp. - CITY OF TIGARD BUILDING INSPECTION NOTICE Inspection Line (Rec -O- Phone): 639 -4175 Business Phone: 639 -4171 e _.., Inspection: Footing Susp. Ceiling Sprink. Rough -in Appr /Sdwlk Foundation Plbg. Underslab Mech. Rough -in Fireplace Post/Beam Struct. Plbg. Top Out Elec. Rough -in FINAL: Post /Beam Mech. San. Sewer Gas Line -Bldg. Plbg. Underfloor Rain Drain a.1 - Plumb. Alarm Water Line Insulation -Mech. Underflr. Insul. Shear Wall Gyp. Bd. - Elect. Date Requested: 5/3 /95" Time: AM PM Address: 1 3 7 9 l.) G / q- Builder: Permi #: / S - 6 4 3 0 THE FOLLOWING CORRECTIONS ARE REQUIRED: 0. ji (v-NQ n o.../ ii Cr- y - .4 g "\I---.9 • 4 12j. : t _i l tA) ! 1 - 7 -) D S 1 s. r 5 1 . r i Inspector, , WV INV Date: > .E d _ APPROVED DISAPPROVED APPROVED SUBJECT TO ABOVE al. I For Reinsp. 1 _ " CRY OF TIGARD BUILDING INSPECTION NOTICE Inspection Line (Rec -O- Phone): 639 -4175 Business Phone: 639 -4171 Inspection: Footing Susp. Ceiling Sprink. Rough -in Appr /Sdwlk Foundation Plbg. Underslab = , "ough -in Fireplace Post/Beam Struct: ' Plbg. Top Out Elec. Rough -in FINAL: Post/Beam Mech. San. Sewer s . 2r_..---le 04 -Bldg. Plbg. Underfloor Rain Drain raming - Plumb. Alarm Water Line Insulation -Mech. Underflr. Insul. Shear Wall Gyp. Bd. - Elect. Date Requested: c_ / Time: AM PM Address: /3 7 9 v Builder: ^� Permit #: S 'Oc' THE FOLLOWING CORRECTIONS ARE REQUIRED: k' 1/ it _1)'- V 1 wy -- 3 1 0 — 1 �i\A„ , _ e_,J c -,--k CcN-e-r 3 2.4) (;1--g) '2C l 7 - c-,. —7 3/ I `5 s pinS -. 7SI - 7.). s L.,:- .e TJLs ¥- —7 21 V-z 1 \ t^'1 v -( ,--;-: 1:fit'—e;,4tt-44cv-\ . L . >- -PLC.? lam. c 1, e_ tr . @, ■AA �c I Inspector: Dater ZS/ C S APPROVED _DISAPPROVED APPROVED SUBJECT TO ABOVE "Call For Reinsp. ..3...e....., CITY OF TIGARD BUILDING INSPECTION NOTICE inspection Line (Rec -O- Phone): 639 -4175 Business Phone: 639 -4171 Inspection: Footing Susp. Ceiling Sprink. Rough -in Appr /Sdwlk Foundation Plbg. Underslab Mech. Rough -in Fireplace Post/Beam Struct. Plbg. Top Out Elec. Rough -in FINAL: Post/Beam Mech. San. Sewer Gas Line -Bldg. Plbg. Underfloor Rain Drain Framing - Plumb. Alarm Water Line Insulation -Mech. Underflr. Insul. Shear Wall Gyp. Bd. - Elect. Date Requested: Time: AM PM Address: Builder: Permit #: — v 3 O THE FOLLOWING CORRECTIONS ARE REQUIRED: P5 2 1 lnV1 -5 s 4,_ (Di LAM --> e-refv\ e i'.v--Ds 5 �J 6 + 5; ;,v -e L ✓n,e-r 6 re • Inspector: Dater 2- 9(fr _APPROVED .ISAPPRO D _ APPROVED SUBJECT TO ABOVE Gall For Reilisp • CITY OF TIGARD BUILDING INSPECTION NOTICE Inspection Line (Rec -O- Phone): 639 -4175 Business Phone: 639 -4171 Inspection: Footing Susp. Ceiling Sprink. Rough -in Appr /Sdwlk Foundation Plbg. Underslab Mech. Rough -in Fireplace Post/Beam Struct. Plbg. Top Out Elec. Rough -in FINAL: Post/Beam Mech. San. Sewer Gas Line -Bldg. Plbg. Underfloor Rain Drain Framing - Plumb. Alarm Water Line Insulation -Mech. Underflr. Insul. Shear Wall Gyp. Bd. - Elect. Date Requested: Time: AM PM Address: Builder: Permit #: ' a - U THE FOLLOWING CORRECTIONS ARE REQUIRED: 75 4 bra 9f ,S ►�..� C /; V ` s r 5 w• a Inspector: Date: 3 / /SS _APPROVED ISAPPROVED _APPROVED SUBJECT TO ABOVE 1 _ Call For Reinsp. • CITY OF TIGARD BUILDING INSPECTION NOTICE -inspection Line (Rec -O- Phone): 639 -4175 Business Phone: 639 -4171 �( Inspection: Footing Susp. Ceiling Sprink. Rough -in Appr /Sdwlk Foundation Plbg. Underslab Mech. Rough -in Fireplace Post/Beam Struct. Plbg. Top Out Elec. Rough -in FINAL: Post/Beam Mech. San. Sewer Gas Line -Bldg. Plbg. Underfloor Rain Drain Framing - Plumb. Alarm Water Line Insulation -Mech. Underflr. Insul. Shear Wall Gyp. Bd. - Elect. Date Requested: Time: AM PM Address: Builder: Permit #: S- G d 7 0 THE FOLLOWING CORRECTIONS ARE REQUIRED: J 5� 'k c rt./1/4- 'I-- S p �Q1 kSy t s Inspector: `J Date: —3/2-5- APPROVED _ DROVED _ APPROVED SUBJECT TO ABOVE =� all For Reinsp. \_4Cj?