Permit V
CITY OF TIGARD
COMMUt1ITY DEVELOPMENT DEPARTMENT MASTER PERMIT
13125 SW Hall Blvd. Tigard, Oregon 97223.8199 (503) 839 -4171
PERMIT # • MST9 5- 0 03o
639 -4171 DATE ISSUED: 02/03/95
PARCEL: 2S104BD -RM004
SITE ADDRESS...: 13790 SW ROSY CT
SUBDIVISION • ROSE MEADOWS ZONING: R -7
BLOCK • LOT • 004
BUILDING
REISSUE: DWELLING UNITS:1 BASEMENT :0 sf
CLASS OF WORK. :NEW BEDRMS:4 BATHS:3 GARAGE :430 sf
TYPE OF USE...:SF FLOOR AREAS REQUIRED SETBACKS
TYPE OF CONST. : 5N FIRST • 1072 sf LEFT..: 7 ft RIGHT. : 1 1 ft
OCCUPANCY GRP.:R3 SECOND...:988 sf FRONT.:20 ft REAR..:28 ft
51UKIE5 •2 FINBSMENT:0 sf REQUIRED --
HEIGHT •25 ft TOTAL - - - -- -:2060 sf SMOKE DETECTORS.:Y
FLOOR LOAD •40 psf VALUE $• 140196 PARKING SPACES..:1
Remarks: PATH I
PLUMBING
SINKS •1 FLOOR DRAINS •0 BACKFLOW PREVNTRS..:1
LAVATORIES •4 WATER HEATERS... :1 TRAPS •0
TUB /SHOWERS •3 LAUNDRY TRAYS... :1 CATCH BASINS 0
WATER CLOSETS..:3 SEWER LINE (ft).:0 GREASE TRAPS •0
DISHWASHERS •1 WATER LINE (ft) •100 OTHER FIXTURES •0
GARBAGE DISP...:1 RAIN DRAIN (ft).:0
WASHING MACH...:1 SF RAIN DRAINS..:1
- -- MECHANICAL - FEES
FUEL TYPES UNIT HTRS..:0 type amount by date recpt
/GAS/ / / VENTS :0 TIF $ 1550.00.JF 02/03/95 -
MAX INPUT:0 BTU VENT FANS :4 SWM $ 180.00 JF 02/03/95 -
FU ?iN < 100K ..:0 HOODS • 1 SWM $ 100.00 JF 02/03/95 -
FURN >=100K ..:1 WOODSTOVES. : 0 BPRT $ 535.50 JF 02/03/95 -
FLOOR FURN •0 CLO DRYERS.: 1 BPLC $ 348.08 KAR 01/12/95 95 -- 260482
BOIL /CMP < 3HP:0 OTHER UNITS:1 B;PC $ 26.78 JF 02/03/95 -
GAS OUTLETS:1 PARK $ 500.00 JF 02/03/95 -
Owner. -- MPRT $ 45.00 JF 02/03/95 -
JAY MILLER MPLC $ 11.25 JF 02/03/95 -
P 0 BOX 230459 N5PC $ 2.25 JF 02/03/95 -
3BTH $ 225.00 JF 02/03/95 -
IIBARD OR 97281 P5PC $ 11.25 JF 02/03/95 -
Phone #: 684 -7543 EROS $ 64.00 JF 02/03/95 -
Contractor: ERPC $ 20.80 JF 02/03/95 -
J1=tY MILLER ERPC $ 20.80 JF 02/03/95 -
PO BOX 23201
TIGHRD OR 97281
Phone ## : 684 -7543
Reg #.. : 30109
$ 3640.71 TOTAL
This permit is issued subject to the regulations contained in the REQUIRED INSPECTIONS
Tigard Municipal Code, State of Ore. Specialty Codes and all other Footing Insp Plumb Top Out
applicable laws, All work will be done in accordance with approved Foundation Insp Framing Insp
plans. This permit will expire if work is not started within 180 Post /Beam Struct Fireplace Insp
days of issuance, or if work is suspended for Nor- than 180 days. Post /Beam Meehan Gas Line Insp
, Crawl Drain insulation Insp
Permittee Signature( Aire I I L; Plm /undslab Insp Gyp Board Insp
PLM /Underfloor Rain drain Insp
Issued By: Mechanical Insp Water Line Insp
L:a11 tor inspection - b,69 ft) .
tai
Residential Building Permit Application ))(1) IF ty of Tigard
ql
125 S Hall Blvd.
Tigard OR 97223
(503) 639 -4171
.. Address: I 5
bdtvtslon:2 Lot #
: > ftce. Us e On Y .::.;:.;;:.;:.: <.:;;:<:<:::.:::.>:.;:.;:.:
u V1ti�
l�
�- 0•01.611>
0
/� , :.:::!::::.7:.:::.::!!:.;.i:;iii.01::::ii::::::::::::.!:::*43.7.7...;i::;.::i:Or:S.:Z.1..1:!;:::.;:;..::::.:.::.:.::.:::.:.::.:.".:.:.::.:.::.:.::.:-::.:
valuation: �✓
C
Corner Lot?
Y N
Flag Lot? Y / N 1
:;:: & T o o
Owner:
ill I
�_ €'<Approv e ::::::::.::::.:: ..: :.:.:.: : :.
1
Address:
d ess• 5
9
q
a .
Ti ai
l
.
7
Phone: rJ
1.
0
n r r•
Co t acto .
: > >Items. equ red :.: . : :.
Address:
< Subcontract . > > > � < ; ?: m :: >° >:: < : : > : : : : '»
Tr D etai l'» . . - -- > : >< < » > > > `> <
Phone:
e
n License #
Co tr c or
Contractor's s
- 3�
( c of current Oregon li
Contact Name & Phone : `) m J lLiA (Y 7 73 y 3
Subcontractors: ,/ r Architect /Engineer:
Plumbing: � p {�1 �(�
11:7,
�T , Addres
m echanical: /l L J h
(attach c opy of current OR Contracr's License)
Phone:
JOB DESCRIPTION:
(pa •
1 ,
Applican Si e & . o ne nu r •er / 5
Received by: — Date Received: 1 1
N: \WORD\CO MDEV\RESAPP
Permit # Account Description Amount Amt. Pd. Bal. Due
/?//15-,003 0 Bldg. Permit (BUILD) 5..3.$.'5 - 0 3
Plumb. Permit (PLUMB) L2 S, cu < ZS
Mech. Permit (MECH)
State Tax (TAX) Z� �f u • Z f(
Bldg: v2.7e7
Plumb: // /
Mech: Z //
Plan Check (PLANCK) 359, 3.3 / / O 7. 33 -
Bldg: -?e/AD Y
Plumb:
Mech: //. Z 5 /
c5c4.1 9 •UU 33 Sewer Connection (SWUSA) vu v 2 Z
Sewer Inspection (SWINSP) 3' 3 .
. Parks Dev Charge (PKSDC) J b`o
Residential TIF (TIF -R) /e/ v / (3" 7
Mass Transit TIF (TIF -MT) / /
Commercial TIF (TIF -C)
Industrial TIF (TIF -I)
Institutional TIF (TIF -IS)
Office TIF (TIF -O)
Water Quality (WQUAL) / /5-0
Water Quantity (WQUANT) /
Fire Life Safety (FLS)
Erosion Cntrl Permit (ERPRMT) 6c/ G y
Erosion Planck/USA (ERPLAN) Ero
Erosion Planck/COT (EROSN) ?-- ' h V
TOTALS: 5(7s , „9-Z 1 S� ZS,
CITY OF TIGARD PLUMBING PERMIT
COMMUNITY DEVELOPMENT DEPARTMENT PERMIT # • MST95 -0030
,_ 5
13125 SW Hall Blvd. Tigard, Oregon 97223.8199 (503) 639-4171 DATE ISSUED: �� /03! 9 �
PARCEL: 2S104BD -RM004
SITE ADDRESS...: 13790 SW ROSY CT
SUBDIVISION • ROSE MEADOWS ZONING: R -7
BLOCK LOT •004
CLASS OF WORK..: NEW GARBAGE D I SPOSALS..: 1
TYPE OF USE -SF WASHING MACH •1 BACKFLOW PREVNTRS..:1
OCCUPANCY GRP..:R3 FLOOR DRAINS :0 TRAPS •0
STURIES •2 WATER HEATERS :1 CATCH BASINS •0
FIXTURES LAUNDRY TRAYS •1 SF RAIN DRAINS •1
SINKS •1 GREASE TRAPS -0
' LAVATORIES .4 OTHER FIXTURES •0
TUB /SHOWERS • SEWER LINE (ft) -0
WATER CLOSETS.. :3 WATER LINE (ft) •100
DISHWASHERS -1 RAIN DRAIN (ft) -0
Remarks: PATH I
OWNER: -- FEES --
JAY MILLER TIF $ 1550.00 JF 02/03/95 -
P U BOX 230459 SWM $ 180.00 JF 02/03/95 -
SWM $ 100.00 JF 02/03/95 -
TIGARD OR 97281 BPRT $ 535.50 JF 02/03/95 -
Phone #: 684 -7543 BPLC $ 348.08 KAR 01/12/95 95- 260482
B5PC $ 26.78 JF 02/03/95 -
Plumbing Contractor - --- -- -- PARK $ 500.00 JF 02/03/95 -
MPRT $ 45.00 JF 02/03/95 Name: IOEN %WITS CONSTRUCTION INC MPLC $ 11.25 JF 02/03/95 -
Address:R, M5PC $ 2.25 JF 02/03/95 -
City: Qom( ,State:f�� 3BTH $ 225.00 JF 02/03/95 -
Z i p : g7 LQ�1a - Phone# : 4 =� / PSPC $ 11.25 JF 02/03/95 -
Reg #: /DO �o Additional fees not shown here
REQUIRED INSPECTIONS --
This permit is issued subject to the reg-
ulations contained in the Tigard Municipal Footing Insp Insulation Insp
Code, State of Ore. Specialty Codes and all Foundation Insp Gyp Board Insp
other applicable laws. All work will be done Post /Beam Struct Rain drain Insp
in accordance with approved plans. This Post /Beam Meehan Water Line Insp
permit will expire if work is not started Crawl Drain Water Service In
within 180 days of issuance, or if work is Plm /undslab Insp Appr /Sdwlk Insp
suspended for more than 180 days. PLM /Underfloor Mechanical Final
Mechanical Insp Plumb Final
Plumb Top Out Building Final
Framing Insp Erosion Control
/ Fireplace Insp
>l�. �41 2_�� Gas Line Insp
FXitho rized P1umbntractor Signature
Call for inspection - 639 -4i75
Contractor Notes:
•
5/24/00 Activities for Case #: MST95 -00030
•
. 2:14:53 PM
Assigned Hold Updated
Activity Description Date 1 Date 2 Date 3 To Done By Disp. Level By Updated Notes .
MSTA007 Application received 1/12/95 KAR PASS BLT 1/23/95
MSTA010 Plan check deposit paid 1/12/95 KAR PASS BLT 1/23/95
. MSTA020 Plan check by 1/23/95 1/23/95 RT PASS BLT 1/23/95
MSTA030 Check for prcl. restrict. 1/23/95 1/23/95 RT PASS BLT 1/23/95
MSTA705 Footing Insp 2/10/95 RB PASS RB 2/13/95 PENDING- USA INSPECTION;
REBAR AS PER ENG. SPECS;
20' GROUND ROD NEEDED.
MSTA706 Foundation lnsp 2/10/95 RB FAIL RB 2/13/95 USA INSPECTION; SEISMIC
RESTRAINT -
MSTA710 Post/Beam Structural 2/22/95 GS APP • GES 2/22/95
MSTA71 1 Post/Beam Mechanical 2/22/95 GS APP GES 2/22/95
•
MSTA717 PLM /Underfloor 2/22/95 GS APP GES 2/22/95
MSTA720 Mechanical Insp 3/29/95 RB FAIL RB 3/30/95 see framing this date;
MSTA722 Plumb Top Out 3/13/95 MS PASS MRS 3/13/95
MSTA725 Framing lnsp 3/29/95 RB FAIL RB 3/30/95 shear inspection ?: secure
fireplace; metal plate protection;
mid -span blocking at floor
joists; vaulted areas need
venting /cross venting; head -out
skylight framing; positive
connections; r -21 insulation
req'd at several locations;
exhaust venting incompleted;
strong back to rat run needed
for over - spanned ceiling joists
in aft bedrm; ceiling joists in
closet fwd bedrm- no bearing;
bracing for ridges /west aft
bedrm lack support and /or
bearing.
MSTA735 Gas Line Insp 3/29/95 RB PASS RB 3/30/95
MSTA740 Insulation Insp 4/6/95 KS NN KBS 4/10/95 #-1- seal around plumbing
penetrating subfloor at kitchen
MSTA745 Gyp Board Insp 4/12/95 KS DIS KBS 4/13/95 #-1- no plans on site couldn't
check if shear applicable at
gypsum
MSTA755 Rain drain Insp 2/23/95 MS PASS MRS 2/24/95
MSTA760 Water Line Insp 2/23/95 MS PASS MRS 2/24/95
MSTA761 Water Service Insp 2/23/95 MS PASS MRS 2/24/95
MSTA795 Mechanical Final 5/22/95 RB FAIL RB 5/23/95 SEE BUILDING
MSTA797 Plumb Final 5/22/95 MS PASS MRS 5/23/95
Page 1 of 3
5 /?4/oo Activities for Case #: MST95 -00030 •
2 :14:53 PM • .
Assigned Hold Updated
Activity Description Date 1 Date 2 Date 3 To Done By ' Disp. Level By Updated Notes
MSTA799 Building Final 5/22/95 RB FAIL RB 5/23/95 SEE REPORT
MSTA097 Issue plumbing signature form 2/3/95 JF JF 2/3/95
MSTA092 (F) Issue combination permit 2/3/95 JF JF 2/3/95
MSTB750 Shear Wall Insp 3/17/95 TLP PART TLP 3/20/95 interior shear wall only
MSTA770 Misc. Inspection 3/30/95 RB PASS RB 3/30/95 shear- exterior only- most has
already been sided.
MSTA726 Framing <REINSP> - 3/30/95 RB FAIL RB 3/30/95 incompleted issues.
MSTA720 Mechanical Insp 3/30/95 RB FAIL RB 3/30/95 incompleted issues
•
MSTA720 Mechanical Insp 3/31/95 RB PASS RB 3/31/95
MSTA726 Framing <REINSP> • 3/31/95 RB $ 15 RB 3/31/95 3RD INSPECTION-
INCOMPLETED ISSUES
FROM PREVIOUS REPORT.
SEE REPORT.
MSTA726 Framing <REINSP> 4/3/95 RB FAIL RB 4/3/95 NO FEE PAID!!!!
MSTA726 Framing <REINSP> 4/4/95 RB PASS RB 4/5/95 pending- seal exhaust vent at
. hall bath upstairs.
MSTA745 Gyp Board Insp 4/14/95 KS A/N KBS 4/14/95 .
MSTA745 Gyp Board Insp 4/1/35 KS A/N KBS 4/14/95
MSTA745 Gyp Board Insp 4/13/95 KS A/N KBS 4/14/95 #-1- extend water proof gupsum
to outer edge of tub and down
each leg. #-1- gypsum shear
not applicable)
MSTA765 APPr /Sdwlk Insp 5/8/95 LT FAIL NL 5/22/95 1. Remove mud from sidewalk
. areas and regrade for full 4"
depth. 2. Remove drain lines in
wings of approach - connect to
existing weep hole to north. 3.
Place boards for wings to curb.
4. Reform wings for 3'.
MSTA765 APPr /Sdwlk Insp 5/12/95 LT • FAIL NL 5/22/95 See 5/8/95 inspection for
corrections.
MSTA765 Appr /Sdwlk Insp • 5/16/95 • LT PEND NL 5/22/95 1. Expansion joints (1/2" feet)
required every 40' and at all
. cold joints. 2. Be prepared to
protect finish.
MSTA795 Mechanical Final 5/24/95 RB PASS RB 5/25/95
MSTA799 Building Final 5/24/95 RB FAIL RB 5/25/95 ELECTRICAL FINAL;
UNDER -FLOOR VENTS
. BLOCKED BY VAPOR
BARRIER; PATIO VENTS
. RESTRICTED IN VENTED
AREA PER VENTS.
MSTA795 Mechanical Final 5/25/95 RB . PASS - RB 5/25/95
Page2of3
• 5/24/00 Activities for Case #: MST95 -00030
•
2:14:53 PM
Assigned Hold Updated
Activity Description Date 1 Date 2 Date 3 To Done By Disp. Level By Updated Notes
MSTA799 Building Final 5/25/95 RB PASS RB 5/25/95
MSTA799 Building Final 5/25/95 RB FAIL RB 5/25/95 ELECTRICAL FINAL
APPROVAL.
MSTA795 Mechanical Final 5/31/95 • KS APP KBS 6/6/95
MSTA•99 Building Final 5/31/95 KS APP KBS 6/6/95
•
•
Page • 3 of 3
CITY OF TIGARD BUILDING INSPECTION NOTICE
Inspection Line (Rec -O- Phone): 639 -4175 Business Phone: 639 -4171
Inspection:
Footing Susp. Ceiling Sprink. Rough -in Appr/dw�
Foundation Plbg. Underslab Mech. Rough -in Fireplace
Post/Beam Struct. Plbg. Top Out Elec. Rough -in FINAL:
Post/Beam Mech. San. Sewer Gas Line -Bldg.
Plbg. Underfloor Rain Drain Framing - Plumb.
Alarm Water Line Insulation -Mech.
Underflr. Insul. Shear Wall , Gyp. Bd. - Elect.
Date Requested: Ste/ ` K / � Time: AM PM
Address: �� 7 `70 Q
Builder: Permit #: 3c)
THE FOLLOWING CORRECTIONS ARE REQUIRED:
I) gi/f/ � "f
r "Fr/ii )1
G
Gl/J -s ° Q av i
e4 uJ. / Gg., 76
Inspector: Gtheli'ua� Date: S -p - g�
_APPROVED '< DISAPPROVED APPROVED SUBJECT TO ABOVE
Call For Reinsp.
CITY OF TIGARD BUILDING INSPECTION NOTICE r
Inspection Line (Rec -O- Phone): 639 -4175 Business Phone: 639 -4171
Inspection: •
Footing Susp. Ceiling Sprink. Rough -in Appr /Sdwlk
Foundation Plbg. Underslab Mech. Rough -in Fireplace
Post/Beam Struct. Plbg. Top Out Elec. Rough -in FINAL:
Post/Beam Mech. San. Sewer Gas Line -Bldg.
Plbg. Underfloor Rain Drain Framing - Plumb.
Alarm Water Line Insulation -Mech.
Underflr. Insul. Shear Wal Gyp. Bd. - Elect.
Date Requested: - / 0-1 "f Time: AM PM
Address: (, 3 7 7 0 C%t
Builder: Permit #: / 03
THE FOLLOWING CORRECTIONS ARE REQUIRED:
- V81 5 ',ropeC(;c-n co rre nt
Inspector: .S Date: .5"
APPROVED DISAPPROVED APPROVED SUBJECT TO ABOVE
/�
all For Reinsp.
CITY OF TIGARD BUILDING INSPECTION NOTICE kL---"-
Inspection Line (Rec -O- Phone): 639 -4175 Business Phone: 639 -4171
Inspection:
Footing Susp. Ceiling Sprink. Rough -in : • • r /Sdwlk
Foundation Plbg. Underslab Mech. Rough -in Fireplace
Post/Beam Struct. Plbg. Top Out Elec. Rough -in FINAL:
Post /Beam Mech. San. Sewer Gas Line -Bldg.
Plbg. Underfloor Rain Drain Framing - Plumb.
Alarm Water Line Insulation -Mech.
Underflr. Insul. Shear / Wall Gyp. Bd. - Elect.
Date Requested: c ° /(o - q 5 Time: AM PM
Address: / 37 o /407 ..."1
Builder: Permit #: 9 .
THE FOLLOWING CORRECTIONS ARE REQUIRED:
• 7 r
4 / llL 9 ,e
d I � / e
rill 5 i h 7rP 7")
i� , ' / % '' / /i -
rfh
Inspector: � / �ii� Date: 5' 4,-16"
_APPROVED _DISAPPROVED PROVED SUBJECT TO ABOVE
_Call For Reinsp.
CITY OF TIGARD BUILDING INSPECTION NOTICE
Inspection Line (Rec -O- Phone): 639 -4175 Business Phone: 639 -4171
Inspection:
Footing Susp. Ceiling Sprink. Rough -in Appr /Sdwlk
Foundation Plbg. Underslab Mech. Rough -in Fireplace
Post/Beam Struct. Plbg. Top Out Elec. Rough -in
Post/Beam Mech. San. Sewer Gas Line -Bldg.
Plbg. Underfloor Rain Drain Framing Plumb:
Alarm Water Line Insulation -Mech.
Underflr. Insul. Shear Wall Gyp. Bd. - Elect.
Date Requested: 5 1/ /7 2 . /� " S Time: M PM
Address: ` V 2O
Builder: Permit #:1g— 0030
THE FOLLOWING CORRECTIONS ARE REQUIRED:
Inspector: /77/.....Z Date: 6/2 -/ 1
PROVED _DISAPPROVED APPROVED SUBJECT TO ABOVE
_Call For Reinsp.
CITY OF TIGARD BUILDING INSPECTION NOTICE
Inspection Line (Rec -O- Phone): 639 -4175 Business Phone: 639 -4171
Inspection:
Footing Susp. Ceiling Sprink. Rough -in Appr /Sdwlk
Foundation Plbg. Underslab Mech. Rough -in Fireplace
Post/Beam Struct. Plbg. Top Out Elec. Rough -in FINAL:
Post/Beam Mech. San. Sewer Gas Line -Bldg.
Plbg. Underfloor Rain Drain Framing - Plumb.
Alarm Water Line Insulation -Mech.
Underflr. Insul. Shear Wall Al> -/Lo - Elect.
Date Requested: 4 /43 / S-- Time: AM PM
Address: / 3 ( 0 e9 -<
Builder: Permit #: FS e°36
THE FOLLOWING CORRECTIONS ARE REQUIRED:
1�- ioi a yPSua. -,
Ovr L C C) r aVe" -TL
, <.iv - �,c -cs,‘ jog m, �t/.
'IC' z 1 /":52, 4 1 (i M IL) A-A9, /4
Inspector: ' _ Date: 4 3 ?s
APPROVED DISAPPROVEDOVED SUBJECT TO ABOVE
_Call For Reinsp.
CITY OF TIGARD BUILDING INSPECTION NOTICE
Inspection Line (Rec -O- Phone): 639 -4175 Business Phone: 639 -4171
Inspection:
Footing Susp. Ceiling Sprink. Rough -in Appr /Sdwlk
Foundation Plbg. Underslab Mech. Rough -in Fireplace
Post/Beam Struct. Plbg. Top Out Elec. Rough -in FINAL:
Post/Beam Mech. San. Sewer Gas • e ;/fin i -Bldg.
Plbg. Underfloor Rain Drain Framing ` - Plumb.
Alarm Water Line Insulation -Mech.
Underflr. Insul. Shear Wall Gyp. Bd. - Elect.
Date Requested: G 4-.4 - .l � � V2-0 Time: AM PM
Add ress:) b w S nn c4. ff��
Builder: Permit #: `'1 �— Q () 3 V
THE FOLLOWING CORRECTIONS ARE REQUIRED:
QA4z)
s s
Inspector: Date: Z I /4l4c
APPROVED _DISAPPROVED PROVED SUBJECT TO ABOVE
Call For Reinsp. rte. �,
G
CITY OF TIGARD BUILDING INSPECTION NOTICE
Inspection Line (Rec -O- Phone): 639 -4175 Business Phone: 639 -4171
Inspection: ditt Jl___ • .• / /
Footin. usp. Ceiling Sprink. Rough- n l Appr /Sdwlk
oundatio Plbg. Underslab Mech. Rough -in Fireplace
Post/Beam Struct. Plbg. Top Out Elec. Rough -in FINAL:
Post/Beam Mech. San. Sewer Gas Line -Bldg.
Plbg. Underfloor Rain Drain Framing - Plumb.
Alarm Water Line Insulation -Mech.
Underflr. Insul. Shear Wall Gyp. Bd. - Elect.
Date Requested: O 1 / ,5 Time: AM P
Address:I -- - 7 gv G
Builder 39'3 // (7(' Permit #: ,;_5 - 003 O
THE FOLLOWING CORRECTIONS ARE REQUIRED:
C L r T/■15 ei2-i --? CR,r2_,
L.� 4s c:2
.4'...y."--c-4k-• v\....z,—....(2._ "\A;-cs A—e,JK
t- ?_Ja_L c (N2=-
01A-(1)--: Le
.6 1- v -& .. ,— ...L..,,,,n...rs ------) C e--4-4---ts •
Z_6 ' . (.>, -C
Inspector: A Date: � 1 .6 /`i s -
_APPROVED V DISAPPROVED _APPROVED SUBJECT TO ABOVE
` R ; r _Call For Reinsp.
• " CRY OF TIGARD BUILDING INSPECTION NOTICE
Inspection Line (Rec -O- Phone): 639 -4175 Business Phone: 639 -4171
. Inspection:
Footing Susp. Ceiling Sprink. Rough -in Appr /Sdwlk
Foundation Plbg. Underslab Mech. Rough -in Fireplace
Post/Beam Struct. Plbg. Top Out Elec. Rough -in FINAL:
Post/Beam Mech. San. Sewer Gas Line : d•0
Plbg. Underfloor Rain Drain Framing - Plumb.
Alarm Water Line Insulation ec
Underflr. Insul. Shear Wall Gyp. Bd. - Elect.
Date Requested: �oZ (-((J Time: AM PM
Address: / �- j 7 � R - 9/3-- G�
Builder: d -3 d
��� � erm t #. c / S - D
THE FOLLOWING CORRECTIONS ARE REQUIRED: l 2j
0 e1...c,irv--,-,....„Asi Pr,..,-..,..Q. -A.,,,......1
9- - \�3' ( , v—Q
Ci s t -7 4 1/4,,,, t I
I'Ll-"-- U 4 w }k s e_,x.1/41 s
- rk.e. 4A)Lit cA.L.6--/ cAei '%)/
is 41. 1, :∎" : V CZ( \Y Le
Inspector: Date: 57 4 J4r
APPROVED 41SAPPROVED APPROVED SUBJECT TO ABOVE
_ ./Call For Reinsp.
CITY OF TIGARD BUILDING INSPECTION NOTICE
Inspection Line (Rec -O- Phone): 639 -4175 Business Phone: 639 -4171
Inspection:
Footing Susp. Ceiling Sprink. Rough -in Appr /Sdwlk
Foundation Plbg. Underslab Mech. Rough -in Fireplace
Post/Beam Struct. Plbg. Top Out Elec. Rough -in FINAL:
Post/Beam Mech. San. Sewer Gas Line -Bldg.
Plbg. Underfloor Rain Drain Framing - Plumb.
Alarm Water Line Insulation -Mech.
Underflr. Insul. Shear Wall Gyp. Bd. 3 - Elect.
Date Requested: Time:/1 AM PM
Address: //?? n^ y�
0030 Builder: Permit #: ` LC --
THE FOLLOWING CORRECTIONS ARE REQUIRED: PC Z ot Z
�� ��-- c��v -- - �-�� -✓ V sue, -}' S �` 2
sa--- -rA w/ U
Inspector: Date: S/2 47q.C
/
_APPROVED _DISA PPROVED APPROVED SUBJECT TO ABOVE
'For Reinsp.
, ---t/L4J1-c_ c k 4-1,1, n on:\ --k---tic ---k"...
CITY OF TIGARD•BUILDING INSPECTION NOTICE
— Inspe me (Rec -O- Phone): 639 -4175 Business Phone: 639 -4171
Inspection: 3
Footing Susp. Ceiling Sprink. Rough -in Appr /Sdwlk
Foundation Plbg. Underslab Mech. Rough -in Fireplace
Post /Beam Struct. Plbg. Top Out Elec. Rough -in NAC
Post/Beam Mech. San. Sewer Gas Line -:Id•.
Plbg. Underfloor Rain Drain Framing - Plumb.
Alarm Water Line Insulation __uIZIII
Underflr. Insul. Shear Wall Gyp. Bd. - Elect.
Date Requested: S /2-7in c --- Time: AM PM
Address: 31 V " W S L Q.
Builder: L Cs a' --- . " - 4 3 Permit #: — 3Q 3
THE FOLLOWING CORRECTIONS ARE REQUIRED: Cc, '\ cA-3
d) ■ L -' W
6b, p.,,,.....„....._ „..:„... - 1 - 2/e-- e-y.._.41 -9 c ---- 2...2.11S
r
- S - \-\.w. \...\_,,.......4),_,,c-
\ , -- L .4.
T ilk, `; w`- S . c L -t.t ,c,
9 --r - ry ,. Le c. -k r _) -Q_,7�,�' 3
, i„,„. w L �,.,. -�— x
Inspector: Date: 772-7--/M
APPROVED _415CSAPPROV90 APPROVED SUBJECT TO ABOVE
:C)? =' all For Reinsp.
CITY OF TIGARD BUILDING INSPECTION NOTICE
▪ Inspection Line (Rec -O- Phone): 639 -4175 Business Phone: 639 -4171
▪ Inspection:
Footing Susp. Ceiling Sprink. Rough -in Appr /Sdwlk
Foundation Plbg. Underslab Mech. Rough -in Fireplace
Post/Beam Struct. Plbg. Top Out Elec. Rough -in FINAL:
Post/Beam Mech. San. Sewer Gas Line -Bldg.
Plbg. Underfloor Rain Drain Framing - Plumb.
Alarm Water Line Insulation -Mech.
Underflr. Insul. Shear Wall Gyp. Bd. - Elect.
Date Requested: Time: AM PM
Address:
Builder: Permit #: �S - 0 3 U
THE FOLLOWING CORRECTIONS ARE REQUIRED:
4 4' 4- (
•
►�- (
Inspector: Date: Si G
APPROVEDPPROVED APPROVED SUBJECT TO ABOVE
2k, -3 ?
— etc Reinsp.
l
' CITY OF TIGARD BUILDING INSPECTION NOTICE
-.- Inspection Line (Rec -O- Phone): 639 -4175 Business Phone: 639 -4171
• Inspection:
Footing Susp. Ceiling Sprink. Rough -in Appr /Sdwlk
Foundation Plbg. Underslab Mech. Rough -in Fireplace
Post/Beam Struct. Plbg. Top Out Elec. Rough -in FINAL:
Post/Beam Mech. San. Sewer Gas Line -Bldg.
Plbg. Underfloor Rain Drain Framing - Plumb.
Alarm Water Line Insulation -Mech.
Underflr. Insul. Shear Wall Gyp. Bd. - Elect.
Date Requested: Time: AM PM
Address:
Builder: Permit #: qs — 3Q
THE FOL O}NING CORI3CTIONS ARE REQUIRED: (7 3
4.-J--i' 1 - 3 , -4 (-4."../. •
E-7).. 4- s : L - is
.n.(2.- ` A, _ 1 t
k ki\A. rt."../•- 4--c....-,-. L., /` .C.....i-
494 ..‹.-,()_.,e K...),_, r..,_ --Qt
Inspector: j Date: /
`
_APPROVED ePPROVED APPROVED SUBJECT TO ABOVE
2 -0.... all For Reinsp.
1.
CITY OF TIGARD BUILDING INSPECTION NOTICE
Inspection Line (Rec -O- Phone): 639 -4175 Business Phone: 639 -4171
Inspection:
Footing Susp. Ceiling Sprink. Rough -in Appr /Sdwlk
Foundation Plbg. Underslab Mech. Rough -in Fireplace
Post/Beam Struct. Plbg. Top Out Elec. Rough -i iiiiWaPIIPP
Post/Beam Mech. San. Sewer Gas Line
Plbg. Underfloor Rain Drain Framing - Plumb.
Alarm Water Line Insulation -Mech.
Underflr. Insul. Shear Wall Gyp. Bd. - Elect.
Date Requested: 5 3/ Time: AM 2--
Address: / 3 7 F0 " C_I
Builder: 78/ 9/5 Permit #: 95
THE FOLLOWING CORRECTIONS ARE REQUIRED:
Inspector: Date: S 3/
Z-- DISAPPROVED APPROVED SUBJECT TO ABOVE
_Call For Reinsp.
CITY OF TIGARD BUILDING INSPECTION NOTICE
Inspection Line (Rec -O- Phone): 639 -4175 Business Phone: 639 -4171
' Inspection:
Footing Susp. Ceiling Sprink. Rough -in Appr /Sdwlk
Foundation Plbg. Underslab Mech. Rough -in Fireplace
Post /Beam Struct. Plbg. Top Out Elec. Rough -in FINAL:
Post/Beam Mech. San. Sewer Gas Line - Idg.
Plbg. Underfloor Rain Drain Framin -Plumb.
Alarm Water Line Insulation -Mech.
Underflr. Insul. Shear Wall Gyp. Bd. - Elect.
Date Requested: 'J/3 ((< Time:AM PM
Address: / 7 9(6 e-5C. C,
Builder: ���J�LC/ Permit #: ! S -- C'3)
THE FOLLOWING CORRECTIONS ARE REQUIRED:
1Q,6 Ze...Q____ --7_,L.::.
∎f h F . ∎,_ _
3 . . .
r /\ ) k j j" D ( 1 '
n
Inspector: Date:' ?j am �1
_APPROVED SAPPROVED _APPROVED SUBJECT TO ABOVE
- \ - R■;-j
I For Reinsp.
CITY OF TIGARD BUILDING INSPECTION NOTICE
'Inspection Line (Rec -O- Phone): 639 -4175 Business Phone: 639 -4171
Inspection:
Footing Susp. Ceiling Sprink. Rough -in t ie/ ppr /Sdwlk
Foundation Plbg. Underslab )Rough -in ° Fireplace
Post/Beam Struct. Plbg. Top Out Elec. Rough-in FINAL:
Post/Beam Mech. San. Sewer Gas Line I le— -Bldg.
Plbg. Underfloor Rain Drain raming - Plumb.
Alarm Water Line Insulation -Mech.
Underflr. Insul. Shear Wall Gyp. Bd. - Elect.
Date Requested: .--3/3 / / c/3 Time: AM PM
Address: I 73 90 • �j'
Builder: Permit #: J s —6 63 0
THE FOLLOWING CORRECTIONS ARE REQUIRED:
P4.-
b I o ; S w.�..„ .� -ter
Gl 0 5 O '''C `)'�i _ V :=ems` c Av .
2 ' /2\.oc 5 - U -if
C OA l i (Are-c
4- S�- u :� --v` .-✓`
6 5:1) . 4 , �► LA A
aU 1 6 v mot-* Tik s
5 0 r tel
--,0 1A4.-i Nivs ' o - ice,,\
cb ifIN.2.- A i.A. D \ Ai k----e_. ?-r Ni-e_e...L.__A
Inspector: Date: 3/ 3) /'7
APPROVED ---[JISAPPROVED APPROVED SUBJECT TO ABOVE
/Call For Reinsp.
c 1
CITY OF TIGARD BUILDING INSPECTION NOTICE
- ' Inspection Line (Rec -O- Phone): 639 -4175 Business Phone: 639 -4171
inspection:
Footing Susp. Ceiling Sprink. Rough -in Appr /Sdwlk
Foundation Plbg. Underslab Mech. Rough -in Fireplace
Post/Beam Struct. Plbg. Top Out Elec. Rough -in FINAL:
Post/Beam Mech. San. Sewer Gas Line -Bldg.
Plbg. Underfloor Rain Drain Framing - Plumb.
Alarm Water Line Insulation ' -Mech.
Underflr. Insul. Shear Wall Gyp. Bd. - Elect.
Date Requested: Time: AM d�PM
Address: '� - Z Q �.--
Builder: Permit #: q -6 Q "R d
T :OLTAVG C� QRRECTIO RE REQUIRE Q: D ,o r.M^
• — ■C? - Q— d -
. c� ) L�
�1/.. L�rw„ ,) _* o . t S S -.....•-sl_S -
` d - 4
t
--c R - NA/ _S + 1 -' c
e 7
t E - N. , .i.r Lk.-t-....9-r .,‘./.' s 0.-.2_,A-- ,.....-- -
Inspector: Date:// /cc
_APPROVEDPPROVED _APPROVED SUBJECT TO ABOVE
C C,--( _all For Reinsp.
-
CITY OF TIGARD BUILDING INSPECTION NOTICE
Inspection Line (Rec -O- Phone): 639 -4175 Business Phone: 639 -4171 e _..,
Inspection:
Footing Susp. Ceiling Sprink. Rough -in Appr /Sdwlk
Foundation Plbg. Underslab Mech. Rough -in Fireplace
Post/Beam Struct. Plbg. Top Out Elec. Rough -in FINAL:
Post /Beam Mech. San. Sewer Gas Line -Bldg.
Plbg. Underfloor Rain Drain a.1 - Plumb.
Alarm Water Line Insulation -Mech.
Underflr. Insul. Shear Wall Gyp. Bd. - Elect.
Date Requested: 5/3 /95" Time: AM PM
Address: 1 3 7 9 l.) G / q-
Builder: Permi #: / S - 6 4 3 0
THE FOLLOWING CORRECTIONS ARE REQUIRED:
0. ji (v-NQ
n o.../ ii Cr- y -
.4 g "\I---.9 • 4 12j. : t _i l
tA) !
1 - 7 -) D S 1 s. r 5 1
. r i
Inspector, , WV INV Date: > .E d
_ APPROVED DISAPPROVED APPROVED SUBJECT TO ABOVE
al. I For Reinsp.
1 _
" CRY OF TIGARD BUILDING INSPECTION NOTICE
Inspection Line (Rec -O- Phone): 639 -4175 Business Phone: 639 -4171
Inspection:
Footing Susp. Ceiling Sprink. Rough -in Appr /Sdwlk
Foundation Plbg. Underslab = , "ough -in Fireplace
Post/Beam Struct: ' Plbg. Top Out Elec. Rough -in FINAL:
Post/Beam Mech. San. Sewer s . 2r_..---le 04 -Bldg.
Plbg. Underfloor Rain Drain raming - Plumb.
Alarm Water Line Insulation -Mech.
Underflr. Insul. Shear Wall Gyp. Bd. - Elect.
Date Requested: c_ / Time: AM PM
Address: /3 7 9 v
Builder: ^� Permit #: S 'Oc'
THE FOLLOWING CORRECTIONS ARE REQUIRED: k' 1/
it _1)'- V 1 wy -- 3 1 0 — 1 �i\A„ , _
e_,J c -,--k CcN-e-r 3 2.4) (;1--g) '2C
l 7 - c-,. —7 3/ I `5 s pinS
-. 7SI - 7.). s L.,:- .e TJLs ¥- —7 21 V-z 1 \
t^'1 v -(
,--;-: 1:fit'—e;,4tt-44cv-\ . L . >- -PLC.?
lam. c 1, e_ tr . @, ■AA
�c
I
Inspector: Dater ZS/ C S
APPROVED _DISAPPROVED APPROVED SUBJECT TO ABOVE
"Call For Reinsp.
..3...e.....,
CITY OF TIGARD BUILDING INSPECTION NOTICE
inspection Line (Rec -O- Phone): 639 -4175 Business Phone: 639 -4171
Inspection:
Footing Susp. Ceiling Sprink. Rough -in Appr /Sdwlk
Foundation Plbg. Underslab Mech. Rough -in Fireplace
Post/Beam Struct. Plbg. Top Out Elec. Rough -in FINAL:
Post/Beam Mech. San. Sewer Gas Line -Bldg.
Plbg. Underfloor Rain Drain Framing - Plumb.
Alarm Water Line Insulation -Mech.
Underflr. Insul. Shear Wall Gyp. Bd. - Elect.
Date Requested: Time: AM PM
Address:
Builder: Permit #: — v 3 O
THE FOLLOWING CORRECTIONS ARE REQUIRED: P5 2 1
lnV1 -5 s 4,_
(Di LAM
--> e-refv\ e
i'.v--Ds 5 �J
6 +
5; ;,v -e L ✓n,e-r 6 re
•
Inspector: Dater 2- 9(fr
_APPROVED .ISAPPRO D _ APPROVED SUBJECT TO ABOVE
Gall For Reilisp
•
CITY OF TIGARD BUILDING INSPECTION NOTICE
Inspection Line (Rec -O- Phone): 639 -4175 Business Phone: 639 -4171
Inspection:
Footing Susp. Ceiling Sprink. Rough -in Appr /Sdwlk
Foundation Plbg. Underslab Mech. Rough -in Fireplace
Post/Beam Struct. Plbg. Top Out Elec. Rough -in FINAL:
Post/Beam Mech. San. Sewer Gas Line -Bldg.
Plbg. Underfloor Rain Drain Framing - Plumb.
Alarm Water Line Insulation -Mech.
Underflr. Insul. Shear Wall Gyp. Bd. - Elect.
Date Requested: Time: AM PM
Address:
Builder: Permit #: ' a - U
THE FOLLOWING CORRECTIONS ARE REQUIRED: 75 4
bra 9f ,S ►�..� C
/; V ` s r 5 w•
a
Inspector: Date: 3 / /SS
_APPROVED ISAPPROVED _APPROVED SUBJECT TO ABOVE
1 _ Call For Reinsp.
• CITY OF TIGARD BUILDING INSPECTION NOTICE
-inspection Line (Rec -O- Phone): 639 -4175 Business Phone: 639 -4171 �(
Inspection:
Footing Susp. Ceiling Sprink. Rough -in Appr /Sdwlk
Foundation Plbg. Underslab Mech. Rough -in Fireplace
Post/Beam Struct. Plbg. Top Out Elec. Rough -in FINAL:
Post/Beam Mech. San. Sewer Gas Line -Bldg.
Plbg. Underfloor Rain Drain Framing - Plumb.
Alarm Water Line Insulation -Mech.
Underflr. Insul. Shear Wall Gyp. Bd. - Elect.
Date Requested: Time: AM PM
Address:
Builder: Permit #: S- G d 7 0
THE FOLLOWING CORRECTIONS ARE REQUIRED: J 5� 'k c
rt./1/4- 'I-- S p �Q1
kSy t s
Inspector: `J Date: —3/2-5-
APPROVED
_ DROVED _ APPROVED SUBJECT TO ABOVE
=� all For Reinsp.
\_4Cj?