Loading...
Permit { CITY OF TIGARD MASTER PERMIT 4,4 DEV EL O PMENT SERVICES PERMIT # • MST98 -0410 p� DATE ISSUED: 10/12/98 ' .. 1 3125 SW Hall Blvd., Tigard, OR 97223 (503) 639 - 4171 PARCEL: 2S104DB -02800 SITE ADDRESS...: 13039 SW ROCKINGHAM DR DR SUBDIVISION •AMESBURY HEIGHTS ZONING: R -4.5 ' BLOCK LOT - :028 JURISDICTION: TIG Remarks: New SFD PATH I . - ---- -- — BUILDING — — REISSUE: STORIES • 2 FLOOR AREAS------ BASEMENT...: 0 sf REQUIRED SETBACKS -- REQUIRED------- -- CLASS OF WORK.:NEW HEIGHT • 20 FIRST • 1105 sf GARAGE • 688 sf LEFT : 12 SMOKE DETECTRS: Y TYPE OF USE...:SF FLOOR LOAD • 40 SECOVD...: 1140 sf FRONT • 20 PARKING SPACES: 2 TYPE OF CONST.:5N DWELLING UNITS: 1 FINB5MENT: 0 sf RIGHT : 12 OCCUPANCY GRP.:R3 BDRM: 5 BATH: 3 TOTAL------: 2245 sf VALUE..$: 168967 REAR • 66 — — PLUMBING — ----- SINKS • 1 WATER CLOSETS.: 3 WASHING MACH..: 1 LAUNDRY TRAYS.: 0 RAIN DRAIN ft: 100 TRAPS • 0 LAVATORIES • 5 DISHWASHERS...: 1 FLOOR DRAINS..: 0 SEWER LINE ft: 1'' SF RAIN DRAINS: 1 CATCH BASINS..: 0 TUB /SHOWERS...: 3 GARBAGE DISP..: 1 WATER HEATERS.: 1 WATER LINE ft: 100 BCKFLW PREVNTR: 1 GREASE TRAPS..: 0 . OTHER FIXTURES: 0 • - - MECHANICAL — - - - - -- FUEL TYPES-- ---- -- FURN (100K ..:, 0 BOIL /CMP ( 3HP: 0 VENT FANS • 4 CLOTHES DRYERS: 1 GAS FURN )=1001( ..: 1 UNIT HEATERS..: 0 HOODS . : 1 OTHER UNITS...: 1 MAX IMP.: 0 BTU FLOOR FURNACES: 0 VENTS • 0 WOODSTOVES : 0 . GAS OUTLETS...: 1 - ----------------------- - ELECTRICAL -- — ------------- - -RESIDENTIAL UNIT— — SERVICE /FEEDER -- —TEMP SRVC /FEEDERS— — BRANCH CIRCUITS— -- MISCELLANEOUS --- - -ADD'L INSPECTIONS - 1m SF OR LESS: 1 0 - 200 amp..: 0 0 - 200 amp..: 0 W /SVC OR FDR..: 0 PUMP /IRRIGATION: 0 PER INSPECTION: 0 EA ADD'L 500SF.: 4 201 - 400 amp..: 0 201 - 4m amp..: 0 1st W/O SVC /FDR: 0 SIGN /OUT LIN LT: 0 PER HOUR • 0 LIMITED ENERGY.: 0 401 - 600 amp..: 0 401 - 600 amp..: 0 EA ADDL BR CIR: 0 SIGNAL /PANEL...: 0 IN PLANT • 0 MANF HM /SVC /FDR: 0 601 - 1000 amp.: 0 601 +amps -1.i v: 0 MINOR LABEL -10: 0 1alm+ amp /volt.: 0 ---- - - - - -- PLAN REVIEW SECTION - - - -- -- - - - - -- Reconnect only.: 0 ) =4 RES UNITS..: SVC /FDR) =225 A.: ) 600 V NOMINAL: CLS AREA /SPC OCC: -- - -- -- — ELECTRICAL - RESTRICTED ENERGY -- ---- -- ----- - - - --- A. SF RESIDENTIAL- - -- B. CRCIAL --- AUDIO & STEREO.: VACUUM SYSTEM..: AUDIO & STEREO.: FIRE ALARM • INTERCOM /PAGING: OUTDOOR LNDSC LT: BURGLAR ALARM..: 0TH: .. BOILER HVAC LANDSSCAPE /IRRIG: PROTECTIVE SIGNL: GARAGE OPENER..: CLOCK • INSTRUMENTATION: MEDICAL OTHR: .. HVAC DATA /TELE COMM.: NURSE CALLS • TOTAL D SYSTEMS: 0 1 Owner: ----- - ----- -- -- Contractor: --------------------- TOTAL FEES:$ 5186.46 SLAVO SKORO SLAVO SKORO This permit is subject to the regulations contained in the 21155 SE CURTIS RD 21155 SE CURTIS RD Tigard Municipal Code, State of Ore. Specialty Codes and all ' CLACKAMAS OR 97015 CLACKAMAS OR 97015 other applicable laws. All work will be done in accordance with approved plans. This permit will expire if work is Phone 0: 658 -3418 Phone B: 658 -3418 not started within 180 days of issuance, or if the work is Reg N..: m436 suspended for more than 180 days. ATTENTION: Oregon law - requires you to follow rules adopted by the Oregon Utility ` Notification Center. Those rules are set forth in OAR 952- 001 -0010 through OAR 952 - 001 -0080. You may obtain copies of these rules or direct questions to OUNC by calling (503)246 -1987. REQUIRED INSPECTIONS Er ion 844 -8444 Post /Beam Mechan Electrical Servi Gas Line Insp . Electrical Final Grading Inspecti Crawl Drain /Back Electrical Rough Insulation Insp Mechanical Final Footing Insp PLN /Underfloor Framing Insp Rain drain Insp Plumb Final Found tion Insp Mechanical Insp Shear Wall Insp Water Service In Building F•.- Post/ eam 5truct lumb Top Out Low Voltage Appr /Sdwlk Insp / A • it ' Issu d By: I 1.4 Permittee Signature: _ L. ++++41+++++++++++++++++++++++++++++++++++++++++++++++++ . :¢ + +' + + + + + + + + + ++ • Ca11 639 -4175. by 7:00 p.m. for an inspection needed the next business day • - - 2v 70 / ' T Plan Check # • - La( '.. CITY OF TIGARD Residential Building Permit Application Recd By ■Pr. 41111 _ 13125 SW HALL BLVD. New Construction Additions or Alterations Date Recd ',got . TIGARD, OR 97223 Single Family Detached or Attached (Duplex) Date to P.E. 09"0-392--- V 503- 639 -4171 Date to DST d d shy • F 503 -684 -7297 qQ - 0 ?6I Permit # M 5 T ' D/ o Print or Type Called /O N1i Incomplete or illegible applications will not be accepted Name of Project by (cl Name Job 19' l S ,gz/ 4,/ i / Le /16::,r<7-S Mailing Address Address Site Address Architect Name 03 5 /A/ a C1 r N�6'09/19 City/State Zip Phone S 4- 10D c'e Name Owner Wiling Address O r y� ,A- MA-cc /9 € /1 / / ti S G' a it ' " • d Engineer Mailing Address L � City/State Zip f/S 77 Phone g GL s4e fl L !2 . C Sal -1,1LI> City /State Zip Elione General Name 2.25 ..,/i I Contractor r C //0-A-/ c D,v Describe work Nev Addition 0 Alteration 0 Repair 0 Mailing Address to be done: Prior to permit 21 /�' f C --j 4F X ^ Additional Description of Work: issuance, a copy City/State Zip D /,5 of all licenses ('t,/4j' K4,?, /e l9 3-er -)1//r1 1- /6 f 6 are required if Oregon Const. Cont. Board Exp. Date PROJECT expired in COT Lic.# VALUATION database ti I Mechanical 3 C5-0 2 �/� 1? Name NEW CONSTRUCTION ONLY: Sub- PSgz e XP A-i I g- 0-0/-/P, Sq. Ft. House: Sq. Ft ra e Contractor Mailing Address Prior to permit ,F Z1 S 4 / ,, St' rm Corner Lot YES NO Flag Lot YES NO issuance, a copy � y/ t ate Zip Phone (check one) `---- (check one) of all licenses / 7 / L 19 4 l' /.4' K'S -SS3`3 Restricted Audio /Stereo Burglar are required if Oregon Const. Cont. Board Exp. Date Energy System Alarm expired a oT Lic.# Installation Garage Door HVAC Plumbing Name Opener Systems Sub- • /7 /0 pL 2i/y )3/.4/6-- (check all that Other: Contractor Mailing Address apply) Will the electrical subcontractor wire for all YES NO • 1 P2,t32A 3 5 restricted energy installations? ' Prior to permit City /State Zip Phone Has the Subdivision Plat recorded? N/A YES NO issuance, a copy : C 4/52G %Rs7, 0 G S's - 9 /Gl of all licenses are Oregon Const. Cot. Board Exp. Date required if Lic.# O Reissue of MST #: Solar, Compliance expired in COT 3 "/- 9y (Calculation Attached) • database Plumbing Lic. # Exp. Date I hearby acknowledge that I have read this application, that the P2 / information given is correct, that I am the owner or authorized / agent of the owner, and that plans submitted are in compliance Name •NIVY / with Oregon State laws. Electrical 6',QZ Z Z /L� ' ` Sign. - •f (' ner /A• _ - Date Sub- Mailing Address his Iiii7I4 -.41L ' '-2 — W Contractor 60 ni Se / y-rK A IDE Contact P-rson Name - Phone # City /State Zip Phone 51_441/e SXt2I D • 37 Prior to permit 36c. FOR OFFICE USE O LY: issuance, a copy 1/ �)J WA 98b 8y 6SS PY �9� Plat #: Map/TL #: \ //�� of all licenses are Oregon Const. Cont. Board Exp. Date //0--9____:--3, , i QUA -o f required if Lic.# pa Fite- expired in COT �6 /a 9 g rj/ (�� Zone Solar: database Electrical Lic. # Exp. Date o- _ 7 3 7 zit/ Engine ring ppr al: Planning Approval: TIF: /o - ///q r .. ` I:SFREM.DOC (DST) 4/97 T r i 5 /ollqf 4i.o. co- 1 ,„ c az Solar Balance Point Standard Worksheet . Address Box A calculations: North -South dimension for the lot. Box A: This dimension is determined by finding the midpoint of the North lot line and drawing an intersecting line perpendicular to that point. First, determine which property line is the North lot line. The North lot line is the line with the smallest angle from a line drawn east -west and intersecting the northern most point of the lot. * 45° •. - 1 LOT U ER t NO NE N North -South Dimension for Lot: Measure the distance from the midpoint of the North lot line to the South lot line along the described line. t 1/ feet N <, - I NORIHSOUIH DIMENSION Box B calculations: Shade point height for your residence. Box B: 1. Determine whether measurements will be based on the peak or eave of your Which describes structure. The orientation of the ridge is also important. your residence? • NO N OUN RID` (circle one) 1 a: If the roof line runs North - South, measurements will ` be based on the peak of the roof. 0000 PONT IIIII.11111H NORTM °-► /I Af 1 B 1C 1 b: If the roof line runs East -West and the roof pitch is less than 5/12, 'measurements will be based on the 1 p 6 , v , 6 h,]Root RM. eave. SHADE POINT EAVE 0 -- 1 c: If the roof line runs East -West and roof pitch is 5/12 or steeper, measurements will be based on the , h 0 o peak. SHADE POINT RIDGE Box B. continued Box B: 2. Measure change in elevation from front property line to finished floor elevation. If the lot slopes up from the front lot line to the foundation, the figure is positive. If the lot slopes down from the front lot line to the foundation, the figure is negative. 6 ft 3. Measure distance from finished floor elevation to the affected peak/eave. + 2. ‘'' ft 4. If the roof line runs North- South, deduct three feet. If the roof line runs East -West, - 0 ft deduct nothing. 5. Subtract one foot for each foot of difference in elevation from the front property line to the rear property line, if the lot slopes up from the front to the rear. If the lot has no slope or slopes up from the rear to the front, deduct nothing. - / 0 ft 6. Total figure for box B: 7 / ft Box C. Distance to the shade reduction line. Box C: 1. Measure the distance from the North property line to the foundation near the 9 ft affected peak/eave. . 2. Measure the distance from the foundation to the affected peak or eave. + .. ft , 3. Total figure for box C: Gf 3 ft It is most useful to draw a vertical line to represent the appropriate figure found in box "A" and a horizontal line to represent the appropriate figure found in box "C ". The intersection of the vertical and horizontal lines determines the value found in box "D ". The value in box "D" should be compared to the value in box "B "; if the value in box "B" is less than or equal to the value found in box "D ", then the building is in compliance with the solar balance code. If you have any questions, please contact us at 639 -4171, x304 or at the Community Development Counter. MAXIMUM PERMITTED SHADE POINT'HEIGHT (In Feet) I Distance to North -south lot dime sion (in feet) shade 100+ 95 90 85 80 75 70 65 60 55 50 45 40 reduction line • from northern Jot line (in feet) ' 70 40 40 40 41 42 43 44 65 38 38 38 39 40 41 42 43 60 36 36 36 37 38 39 40 41 42 55 34 34 34 35 36 37 38 39 40 41 50 32 32 32 33 34 35 36 37 38 39 40 45 30 30 30 31 32 33 34 35 36 37 38 39 -7 11r 28 28 28 29 30 31 32 33 34 35 36 37 38 35 26 26 26 27 28 29 30 31 32 33 34 35 36 30 24 24 24 25 26 27 28 29 30 31 32 33 34 25 22 22 22 23 24 25 26 27 28 29 30 31 32 20 20 20 20 21 22 23 24 25 26 27. 28 29 30 15 18 18 18 19 20 21 22 23 24 25 26 27 28 10 16 ' 16 16 17 18 19 20 21 22 23 24 25 26 5 14 14 14 15 16 17 18 19. 20 21 22 23 24 I Box D. Maximum allowed shade point height: 34 / feet h: \dots \nancy \ventura\solar.chp 1' Revised 2/26/96 CITY OF TIGAR REG O ON INTENT TO HAUL EXCAVATION (LOTS STEEPER THAN 20 %) I, /1/c7 S¢0 (print name), hereby certify that ALL excavation material on the subject property will be removed from the site and not be placed as fill, except for that amount necessary to back -fill the foundation ONLY. I understand that failure to remove the excavation material will result in the requirement to remove the material or obtain a grading permit by submitting grading plans prepared by a licensed engineer accompanied by a geo- technical report regarding the placement of the excavation material as fill. I further understand that my footing inspection will be denied if that inspection reveals that excavated material has not been hauled, and that work will be stopped and no further inspections conducted until the City has received and approved a plan and report from a geo- technical engineer regarding placement of the fill material. •/ , 01PAir _A111/ _i • n - ture Date Permit #: /►1 f$ -vyln Job Address: /303? Sw ,y. Subdivision: �/`rs 22) &/ �� � S' Lot: I:haul.doc (DST) 7/98 13125 SW Hall Blvd., Tigard, OR 97223 (503) 639 -4171 TDD (503) 684 -2772 6/29/99 Activities for Case #:. MST98 -00410 9:27:21 AM • Assigned Hold Updated - Activity Description Date I Date 2 Date 3 To Done By Disp. Level By Updated Notes MSTA005 Application received 8/21/98 JSD PASS JSD 9/23/98 Submittal material deemed unacceptable; Slavo was notified of need for revisions on 08/24/98 at 1107am. jsd MSTA008 Permit Created 9/23/98 JSD PASS JSD 9/23/98 Delay caused by need for • revised site and building plans; • submittal elements were unacceptable. Slavo notifed on • • • 08/24/98 at 1107am of requirements and submitted . revisions on 09/23/98 at 1105am. jsd MSTA010 Check for prcl. restrict. 9/23/98 JSD PASS JSD 9/23/98 MSTA012 Plans routed to Plans Examiner 9/23/98 •JSD PASS JSD 9/23/98 • MSTA026 Plans approved by PIn Examiner • 9/28/98 RT PASS JHF 10/7/98 NEED LATERAL SHEET AND . SIGN INTENT TO HAUL FORM everything submitted 10/06/98 BT. MSTA030 Reviewed plans routed to DSTS 10/7/98 JHF APPR JHF 10/7/98 MSTA032 DST Post - Review Completed • 10/7/98 B DONE BON 10/7/98 MSTA700 Erosion 844 -8444 JSD 9/23/98 MSTA703 Grading Inspection JHF 10/7/98 23% SLOPE HAS SIGN INTENT TO HAUL FORMS MSTA705 Footing Insp 10/21/98 KS PASS KBS 10/23/98 MSTA706 Foundation Insp 10/21/98 KS PASS KBS 10/23/98 MSTA710 Post/Beam Structural 1/8/99 KS PASS KBS 1/11/99 #-1- u2 No underfloor • mechanical or plumbing (tall crawl). MSTA711 Post/Beam Mechanical 1/5/99 KS FAIL KBS 1/6/99 #-1- support furnace plenum @ crawl #-2- eliminate sagging @ • range vent slope to ext . MSTA713 Crawl Drain /Backwater valve 12/9/98 GS. FAIL GES 12/9/98 none in at this time redo address so it is readable from street • MSTA717 PLM /Underfloor 12/9/98 GS PASS GES 12/9/98 MSTA720 Mechanical Insp JSD 9/23/98 MSTA722 Plumb Top Out 12/4/98 RB FAIL RB 1/7/99 See water service inspection. No test on DWV. MSTA723 Electrical Service 12/14/98 CD PASS CD 12/14/98 MSTA724 Electrical Rough In 12/14/98 CD PASS CD 12/14/98 • Page 1 of 4 6/29/99 'Activities for Case #: MST98 -00410 9:27:21 AM • Assigned Hold Updated Activity Description Date 1 Date 2 Date 3 To Done By Disp. Level By Updated Notes MSTA725 Framing Insp 1/7/99 RB FAIL RB 1/7/99 Crawl drain failed. NO RECORD OF APPROVALS: 1. Sanitary Sewer, 2. Water Service, 3. Crawl Drain, 4. Rain Drain, and 5. Post/beam Mechanical. Issues 3, & 5 inspected this date. #3- Crawl Drain- failed; Still no back -water valve. #5- P/B Mechanical- passed; Report dtd. 1 -5 -99 KS was for both P/B and Mechanical Rough. Mech. rough passed via P /B/ mech. approval, EXCEPT that the B -vent needs to be supported at 5 -foot intervals and the termination vent cap needs to be extended 15- inches above the high end of the roof...to be re- checked at Final or before. FRAMING: 1. Strap beams to plate at nook bay and fwd. living room bay. 2. Submit truss details for change on plans. 3. Window units at master jacuzzi and fwd. living room bay exceeds .40 U -value factor. 4. Jacuzzi access required. MSTA726 Shear Wall Insp 11/20/98 KS PASS KBS 1/11/99 #1 Inspections made 111998 and app. #2 No under floor mechanical or plumbing (tall crawl). MSTA728 Low Voltage JSD 9/23/98 MSTA735 Gas Line Insp 12/17/98 KS PASS J *H 12/18/98 tag 342876 MSTA740 Insulation Insp 2/11/99 KS PASS KBS 2/11/99 MSTA752 Rain drain Insp 3/25/99 GS PASS AKJ 3/28/99 MSTA761 Water Service Insp 12/4/98 RB PASS RB 1/7/99 Water line 108# at 10:13, City to provide PRV DWV no test, leak. MSTA765 Appr /Sdwlk Insp 5/17/99 MW PASS AKJ 5/17/99 Extend pipe left side of approach, ok to pour after that MSTA790 Electrical Final 5/12/99 CD PASS AKJ 5/12/99 MSTA795 Mechanical Final 12/14/98 KS FAIL J *H 12/15/98 1. Gas piping not installed. 2. • Slope b -vent horizontal section • towards furnace. 3. Provide 1.5 -inch clearance to framing members at fireplace. Page 2 of 4 6/29/99 Activities for Case #: MST98 -00410 . 9:27:21 AM . Assigned Hold Updated ' Activity Description Date 1 Date 2 Date 3 - To Done By Disp. Level By Updated Notes MSTA797 Plumb Final 5/12/99 TLP PASS AKJ 5/12/99 MSTA799 Building Final 5/21/99 KS FAIL AKJ 5/23/99 1) post st address'at front of structure • 2) plm and elec finals app 3) seal voids at garage ceiling at ducts 4) provide 1 3/8" solid core door at crawl access or double 1/2" gyp and gasket 5) remove wood and debris at crawl also recover vapor as - . needed 6) need final erosion control app • 7) grading not complete, will require retaining wall at rear and side yard MSTA080 (F) Ready to issue 10/7/98 B MEMO BON 10/7/98 Needs electrical licenses before issuing. MSTA097 Issue electric signature form 10/16/98 . VLN RECD VLN 10/16/98 MSTA095 Issue plumbing signature form 10/26/98 JMT RECD JT 10/26/98 MSTA092 (F) Issue combination permit 10/12/98 B PASS DST 10/12/98 MSTA050 Hold for . 10/22/98 JMT NOTE JT 10/22/98 Phyllis, Accting, ext 353, retumed check for $7,271 No inspections until check clears. Phyllis will notify Jeanne. MSTA055 Hold Release to Issued 12/9/98 HAP RELS J'H 12/9/98 Hold released per phonecon w /phyllis /finance 0930 MSTA722 Plumb Top Out 12/9/98 GS PASS TLP 1/5/99 MSTA713 Crawl Drain /Backwater valve 1/7/99 RB FAIL RB 1/7/99 No back -water valve installed. $ - 15.00 assessed. MSTA720 Mechanical Insp 1/7/99 RB PART RB 1/7/99 View termination of B -vent above roof. See notes in framing this date. Report dtd. 1 -5-99 KS- issues completed. MSTA711 Post/Beam Mechanical 1/7/99 RB PASS RB 1/7/99 Report dtd. 1 -5-99 KS- issues completed. MSTA710 Post/Beam Structural • 1/8/99 KS APP KBS 1/11/99 #-1- add post @ 24/24/12/pier equal bearing on pier MSTA711 Post/Beam Mechanical 1/8/99 KS PASS KBS 1/11/99 #-1- eliminate sagging @ range vent @ crawl space . MSTA725 Framing Insp 1/11/99 KS FAIL KBS 1/12/99 #-1- corrections not completed ( • per RB corrections list dated 1 -7 -99 Page3of4 6 /29 /99 Activities for Case #: MST98 -00410 9:27:21 AM Assigned Hold Updated • Activity Description Date 1 Date 2 Date 3 To Done By Disp. Level By Updated Notes MSTA725 Framing Insp 1/13/99 KS FAIL KBS 1/13/99 #-1- windows @ liv /rm & jacuzzi do not meet energy requirements. exceeds u value. other framing corrections completed per RB list dated 1/7/99 MSTA725 Framing Insp 1/27/99 KS NOTE KBS 1/27/99 #-1- windows @ liv /rm & jacuzzi do not meet energy requirements. contractor has backed ordered slavo skoro #-2- support B vent @ ext vertical @ four ft intervals to . structure MSTA713 Crawl Drain /Backwater valve 3/28/99 GS PASS AKJ 3/28/99 MSTA704 Sewer Inspection 3/25/99 GS PASS • AKJ 3/28/99 sanitary sewer MSTA795 Mechanical Final 5/23/99 5/23/99 5/21/99 KS PASS No Hold AKJ 5/23/99 MSTA799 Building Final 5/24/99 5/24/99 5/24/99 KS PASS No Hold AKJ 5/24/99 Final approved pending: 1) need final erosion control app 2) need to sign voluntary • compliance agreement with city • of tigard re: retaining walls @ rear and side yard MSTA960 (F) Issue Cert. of Occupancy • 5/24/99 TIG KS DONE No Hold JMT 6/29/99 • • • Page4of4 CITY OF TIGARD BUILDING INSPECTION DIVISION MST 9? rO -/t2 24 -Hour Inspection Line: 639 -4175 Business Line: 639 -4171 BUP Date Requested 5 AM .XC PM BLD Location I / o6/� y' Qi VL Suite G MEC Contact Person L S Ph (p SS 3416 PLM Contractor Ph SWR ILD ■Tenant/Owner ELC Retaining Wall ELR Footing Access: Foundation FPS Ftg Drain SGN Crawl Drain Inspection Notes: Slab SIT Post & Beam Ext Sheath /Shear Int Sheath /Shear Framing iveEv r ..144c_ (77'- zneoe- C4r Insulation Drywall Nailing dVeev c..1rz4i0y �'c 1 44., r4 4,--1 C Firewall Fire Sprinkler C4 , eG 71 5 /en ' 7 Fire Alarm Susp'd Ceiling c4.4te_s `7050 Si >3 y/)i i Roof AS PART FAIL A /J �- • I /-- - 0A P MBING Post & Beam Under Slab Top Out Water Service Sanitary Sewer Rain Drains Final PASS PART FAIL MECHANICAL Post & Beam Rough In Gas Line Smoke Dampers Final PASS PART FAIL ELECTRICAL , Service 11► Rough In UG /Slab Low Voltage Fire Alarm Final PASS PART FAIL SITE Backfill /Grading Sanitary Sewer Storm Drain [ ] Reinspection fee of $ required before next inspection. Pay at City Hall, 13125 SW Hall Blvd Catch Basin Fire Supply Line [ ] Please call for reinspection RE: [ ] Unable to inspect - no access ADA Approach /Sidewalk Date ate Z y Z`� Inspector E Final PASS PART FAIL DO NOT REMOVE this inspection record from the job site.