Loading...
Report 09/1E/2005 0 7:1 0 503595 +705 GEOPACIFIC ENG , INC PAGE 01 �vl 5 T D S - ozi /54 /fq 51A/ oa kt/alle.yTev- GcoP die 7312 SW Durham Road • Portland, Oregon 97224 August 15, 2005 1 '91(503)699 5445 • Fex (500)590-6705 Prnjw.r..t. No. 03 - 8183 Attention; Andy Venture Properties, Inc, 4230 Gaiewood Street, Site 100 Lake Oswego, Oregon 97035 Fax No. 503-.670-9099 RF' SOIL EWG E"'S ).:.VIEW Ot= FOUNDATION EXCAVATION $UBGRADE LOTS 92 AI) 101 x WAIT RIDGE TIGARD, OR a References: • 1. Ceoracifit Cngineev n hay:, Gmechnlcal investigation, Summit Ridge Development, Tigard, Oregon, dated May 12, 2003. 2, GeoPacific Engineering inn.., Snil and Wall Enginoor's Summary of Conclusion of Earthwork, Summit Ridge Devtlunai . — Phase 1, Tigard, Oregon, Revised January 21, 2004 (should state 2005), GeoPacific Enginapr, Jim Imbrie, visited the site to review the foundation excavation subgrades. The observed engineered fill is clay with rock. Based on our observations, it is our opinion that the current foundation subgrade is adequate for spread foundation support to a maximum allowable bearing pressure of 1,500 psf. reirifcrcement has Deere recommended in the above Reference 2. The existing rockery walls at the rear and side yard of the lots are adequately setback from the foundation such that they are surcharged by the proposed construction, Our work scope pertains to a geotechnical engineer's foundation excavation review only and the conditions existing and wxpnsed at the time of our site visit. No deck footing, polio, or other appurtenant structure subgrades were observed. Our work was performed to the current local standards of practice.' No other warranty Is herein expressed or implied, if you have any questions, please call. Sincerely, GeoPecific Engineering, Inc, ORE0ON James D. Imbrie, P.E., _ t' (IV „ Geatechnicai engineer , " •