Permit Support Document CITY OF TIGARD BUILDING INSPECTION DIVISION g.6 -0 1Dr
MST
\\ • • t► r Inspection Line: 639 -4175 Business Line: 639 -4171
BUP
CAN Date Requested 67,2-Vhk AM PM BLD
Location / 1 w MEC
Contact Person Ph "7,93�Z -2 PLM
Contractor Ph SWR
BUILDING Tenant/Owner ELC
Retaining Wall ELR
Footing ACC SS:
Foundation ��Y ���J�-PS
Ftg Drain 7 �/ - f SGN
Crawl Drain Inspection Notes: /'e / Q u/� O rL 44 -
Slab (.t�l�- SIT
Post & Beam U "'E- 11 /2 1 416 1 61 i A I &)n ; Z_
Ext Sheath /Shear U 1. (,(,{,(J vlliW'�
Ina Sheath/Shear
Framing t JC��.� 1 p--
Insulation
Drywall Nailing 1
Firewall V / I �i l
Fire Sprinkler
Fire Alarm J 1
Susp'd Ceiling Q'
Roof ] , I o
Misc: I �'° I
Final 1 1 3311
PASS PART FAIL (,
PLUMBING V 33
Post & Beam 33 0
Under Slab
Top Out
Water Service
Sanitary Sewer & d 5 �� 5 / Rain Drains 4 / S
Final
PASS PART FAIL
MECHANICAL
Post & Beam
Rough In
Gas Line
Smoke Dampers
Final
PA FAIL
,ELECTRICA
Rough In
UG /Slab
Low Voltage
Fi - Alarm
inal
__gy PART FAIL
S
Backfill /Grading
Sanitary Sewer
Storm Drain [ ] Reinspection fee of $ required before next inspection. Pay at City Hall, 13125 SW Hall Blvd
Catch Basin
Fire Supply Line [ ] Please call for reinspection RE: [ ] Unable to inspect - no access
ADA / _
L
Otheoach /Sidewalk Date (� � — G Inspector ,h _ �jy L—/ Ext �lV
Final
PASS PART FAIL DO NOT REMOVE this inspection record from the job site.
•
From: "David Scott" <DAVID.COT>
To: rick, mikes, hap, george, jeanne, jean
Date: Wed, 24 Dec 1997 14:23:42 +0000
• Subject: summerwood
Reply -to: david@ci.tigard.or.us
X- mailer: Pegasus Mail for Windows (v2.54)
X- PMFLAGS: 128 0
To clear up any confusion that took place re: the termination of
crawls out there...Hap anf I had told Tony that we would allow the
crawls to discharge on adjacent grade...we allowed this because the
buildings have foundation drains which would collect any water that
migrated back toward the structure and then carry it out into the
storm system...apparantiy this message didn't get forwarded along
anyway, over -all on the issue of the crawls...Tony has informed me
that they are putting them in for everything...so we don't need to do
any temp c of os if everything else is ok (incl ping/eng) we can do
regular c of os
thanks
Jeanne Temple — 1 — Wed, 24 Dec 1997 14:52:15