Loading...
Permit ,CITY OF TIGARD MERMIR PERMIT • MST96 -0203 COMMUNITY DEVELOPMENT DEPARTMENT DATE ISSUED: 0 .., / 1 13125 SW Hall Blvd. Tigard, Oregon 97223.8199 (503) 839 -4171 PARCEL: 251 Cd4DD -0260 SITE ADDRESS...: 12873 SW RIDGEFIELD LN SUBDIVISION • MOUNTAIN HIGHLANDS #2 ZONING: R -4.5 PD BLOCK • LOT -023 Remarks: PATH I ------ - - - - -- -------------------------------- REISSUE: STORIES • 2 FLOOR AREAS- - - - - -- BASEMENT...: 0 sf REQUIRED SETBACKS -- REQUIRED------- --- CLASS OF WORK. :NEW HEIGHT • 33 FIRST • 1465 sf GARAGE • 819 sf LEFT : 5 SMOKE DETECTRS: Y TYPE OF USE...:SF FLOOR LOAD • 40 SECOND...: 1406 sf FRONT • 20 PARKING SPACES: 1 TYPE OF CONST.:5N DWELLING UNITS: 1 FINBSMENT: 0 sf RIGHT • 12 OCCUPANCY GRP.:R3 BDRM: 4 BATH: 3 TOTAL - - - -: 2871 sf VALUE.. t: 199644 REAR • 70 - - -- ----- .— - - - -- PLUMBING - -- - - -- - -- --------------- SINKS • 1 WATER CLOSETS.: 3 WASHING MACH..: 1 LAUNDRY TRAYS.: 1 RAIN DRAIN ft: 0 TRAPS • 0 LAVATORIES • 4 DISHWASHERS...: 1 FLOOR DRAINS..: 0 SEWER LINE ft: 0 SF RAIN DRAINS: 1 CATCH BASINS..: 0 TUB /SHOWERS...: 3 GARBAGE DISP..: 1 WATER HEATERS.: 1 WATER LINE ft: 1% BCKFLW PREVNTR: 1 GREASE TRAPS..: 0 OTHER FIXTURES: 0 - - - -- MECHANICAL ----- - - - - -- -- -- - - - - -- FUEL TYPES-- --- - -- FURN (100K ..: 0 BOIL /CMP ( 3HP: 0 VENT FANS • 4 CLOTHES DRYERS: 1 /GAS/ / / FURN ) =100K ..: 1 UNIT HEATERS..: 0 HOODS • 1 OTHER UNITS...: 1 MAX INP.: 0 BTU FLOOR FURNACES: 0 VENTS : 0 WOODSTOVES : 0 GAS OUTLETS...: 1 -------------------------------------------------------------- ELECTRICAL - - -- - -- - RESIDENTIAL UNIT— -- SERVICE /FEEDER - -- - -TEMP SRVC /FEEDERS— — BRANCH CIRCUITS -- — MISCELLANEA= = - -ADD'L INSPECTIONS- - 1m SF OR LESS: 1 0 - 200 amp..: 0 0 - 200 amp..: 0 W /SVC OR FDR..: 0 PUMP /IRRIGATION: 0 PER INSPECTION: 0 EA ADD'L 500SF.: 6 201 - 400 amp..: 0 201 - 400 amp..: 0 1st W/O SVC /FOR: 0 SIGN /OUT LIN LT: 0 PER HOUR • 0 LIMITED ENERGY.: 0 401 - 600 amp..: 0 401 - amp..: 0 EA ADDL BR CIR: 0 SIGNAL /PANEL...: 0 IN PLANT : 0 MANF HM /SVC /FDR: 0 601 - 1m amp.: 0 601 +amps -lm v: 0 MINOR LABEL -10: 0 1000+ amp /volt.: 0 ----------------------------------- PLAN REVIEW SECTION ------------------------ Reconnect only.: 0 )=4 RES UNITS..: SVC /FDR) =225 A.: ) 6w V NOMINAL: CLS AREA /SPC OCC: — ---- ---- - - - - -- -- ELECTRICAL - RESTRICTED ENERGY -- -- ------ - - - - -- A. SF RESIDENTIAL- ----------------- B. COMMERCIAL --- -- -_ -- -- -- - - -- -- -- - - - - - AUDIO & STEREO.: VACUUM SYSTEM..: AUDIO & STEREO.: FIRE ALARM INTERCOM /PAGING: OUTDOOR LNDSC LT: BURGLAR ALARM..: 0TH: :: X BOILER HVAC LANDSCAPE /IRRI6: PROTECTIVE SIGNL: GARAGE OPENER..: CLOCK • INSTRUMENTATION: MEDICAL OTHR: .. HVAC DATA /TELE COMM.: NURSE CALLS • TOTAL # SYSTEMS: 0 Owner: ------ - - - - -- -- - - - --- Contractor: - -- -------------------- TOTAL FEES:f 4796.45 JEFF & CINDY RODGERS BEAR CONSTRUCTION CO 10889 SW DOVER CT 8076 SW 184TH AVE TIGARD OR 97223 BEAVERTON OR 97w Phone #: 639 -3049 Phone #: 642 -3512 Reg #..: 17098 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of Ore. Specialty Codes and all other applicable laws. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more than 180 days. - - - - -- _ —_ -- - - - - -- REQUIRED INSPECTIONS - - - - -- --------------------- ---- - - - - -- Footing Insp PLM /Underfloor Shear Wall Insp Insulation Insp Appr /Sdwlk Insp Erosion Control Foundation Insp Mechanical Insp Low Voltage Gyp Board Insp Electrical Final Post /Beam Struct Plumb Top Out Fi eplace Insp Rain drain Insp Mechanical Final Post /Beam Meehan Electrical Serv' Line sp Water Line Insp Plumb Final Crawl Drain Framing Insp Fir-. ace Water Service In Building Final Permittee Signature: 4.1.2.4/ Issued By: �±61 CA/V1A/l Call for inspection — 639 -4175 • Residential Building Permit Application City of Tigard a liQ� ; q- c� 13125 SW Hall Blvd. C u c 3S Tigard, OR 97223 (503) 639 -4171 Jobsite Address: p2 73.s& R I S e- i eLCI / /, p 4 ° Subdivision: _ Lot # 23 Office Use Only o z Valuation: /79"��/Y Contact Date I i Initials - Result New Construction Only: (Square Footage) �nn z i 7 S3' I Planck/Rec # 1 -1' - 0 ice-- �( House: Garage: 6,; i- Permit # ht s 99 - ovla3 27/5 Reissue of Corner Lot? Y �L Flag Lot? Y 1.:� Map & TL �jl '1 P - ,J0. ".°) ' - '41 P Owner: SeK(c,34 �� ��Q Zone Plat# Inv- LP, qs, Address: 11 Jggq S (A) hotptop l- 1 . Approvals Required T1 6 - A - '11 Planning Setbacks 0 1--- Solar ° { - •• -i ( � �) � 2 � � � � Engineering Pl.;t,jT'1 _ l iJ • j1J� Phone: ' J `' Other t'li --U UUI L MT!._:. i ir_rf +l `-4J�j '' co in ¢ -' P�_ ' Lt IAA �" l4 l. t�� I� / Q., I tems Re uired e; i/- ' 1 -.- l o� .r '% i , - t Address: ( 4L 7 ( G W N4 A,_. Subcontractors Truss Details il e,14, _ v-e-i2 1 G NJ `t - 1 eo 7 Other Phone: (ST3) L, 39 I -- Notes Contractor's License # ) 7g (atta� Qpy pf current Oregon license) Contact Name: lAil , ke i � ' 1 Contact Phone: (56 ) t'la — E3: I �— ' Subcontractors: ' i �! o ? ? i , K Architect/Engineer: Plumbing: . lZ 2 it b n;r , Address: (2942 , Sc- illn /e J Y ij,//s I7 /J - Mechan � J Ne A i „y > _ - ^C DI'e— I pitiL 5 41 AZ Al '/A n 7 7)4-3 (atta opy of current OR Contractors License) ` Electrical: T I1 '' /e i : , >G t t ' xi , Phone: ( `503 t Y,-) - /y/ JOB DESCRIPTION: / � (A) a'3S - / Applicant Signature ( Applicant Phone number Received by: °'`T Date Received: 2 1 1 5 I 9 ,() - H:Vogm'tlstsVesaoo Permit IS Account Description A mount Amt. Pd. Bal. Dub PP.5/0-0,203 Bldg. Permit (BUILD) 1 //S/3f w Plumb. Permit (PLUMB) Mach. Permit (MECH) 43 el- State Tax (TAX) <F O p Bldg: 62• G/ 6 Z- a" Plumb: //, Z Mech: ,�L CI i — G 7 1 o / Plan Check (PLANCK) 9 57; /.3/ Bldg: 11/3. Plumb: Mech: l/( Z //, Z /112 s 2 O/V Sewer Connection (SWUSA) ( 7 0 /c/v ( 9,2a Sewer Inspection (SWINSP) 33 3 >� Parks Dev Charge (PKSDC) /05 /050 Residential TIF (TIF -R) /e/7t) /' Mass Transit TIF (TIF -MT) / ?O /)-ri Commercial TIF (TIF -C) Industrial TIF (T1F-1) Institutional T1F (TIF -IS) Office TIF (TIF -0) Water Quality (WQUAL) 7Y I Water Quantity (WQUANT) / Gy i ti ) Fire Life Safety (FLS) Erosion Cntrl Permit (ERPRMT) (o Erosion Planck/USA (ERPLAN) % V - Erosion Planck/COT (EROSN) ;/.f TOTALS: 73/ t c/ r 'f6 2775 Solar Bala nce Point Standard Worksheet • Address col 8 3 Sw I ?l L6 cie �A) 4 / - 3 Box A calculations: North -South dimension for the lot. Box A: This dimension is determined by finding the midpoint of the North lot line and drawing an intersecting line perpendicular to that point. First, determine which property line is the North lot line. The North lot line is the line with the smallest angle from a line drawn east -west and intersecting the northern most point of the lot. 1 �0 45 "' LOT NORTHERN LO N North -South Dimension for Lot: Measure the distance from the midpoint of the North lot line to the South lot line along the described line. $Ci feet • . 1 N T= DIMENSION Box B calculations: Shade point height for your residence. Box B: 1. Determine whether measurements will be based on the peak or eave of your Which describes structure. The orientation of the ridge is also important. your residence? 1 a: If the roof line runs North - South, measurements will fib (circle one) be based on the peak of the roof. 0 0 0 0 men II''HIJH'I' • NOR 1A 1B 0 1 b: If the roof line runs East -West and the roof pitch is less than 5/12, measurements will be based on the eave. '" " ° °°" SHADE POINT EA.E lc: If the roof line runs East -West and the roof pitch is 5/12 or steeper, measurements will be based on the 5 12 Root Mcn peak. ❑v °°°°a`CI SHADE POINT RIDGE • • • • •� • Box B. continued Box B: • , 2. Measure change in elevation from front property line to finished floor elevation. If the lot slopes up from the front lot line to the foundation, the figure is positive. If ft the lot slopes down from the front lot line to the foundation, the figure is negative.. 3. Measure distance from finished floor elevation to the affected peak/eave. + .3,.3 ft 4. If the roof line runs North - South, deduct three feet. If the roof line runs East -West, - © ft deduct nothing. 5. Subtract one foot for each foot of difference in elevation from the front property • line to the rear property line, if the lot slopes up from the front to the rear. If the lot has no slope or slopes up from the rear to the front, deduct nothing. - 6 ft 6. Total figure for box B: -4- .3 5 ft Box C. Distance to the shade reduction line. 1� Box C: 1. Measure the distance from the North property line to the foundation near the • 90 ft affected peak/eave. 2. Measure the distance from the foundation to the affected peak or eave. + Yol- ft 3. Total figure for box C: �3 � ft It is most useful to draw a vertical line to represent the appropriate figure found in box "A" and a horizontal line to represent the appropriate figure found in box "C ". The intersection of the vertical and horizontal lines determines the value found in box "D ". The value in box "D" should be compared to the value in box "B "; if the value in box "B" is less than or equal to the value found in box "D ", then the building is in compliance with the solar balance code. If you have any questions, please contact us at 639 -4171, x304 or at the Community Development Counter. MAXIMUM PERMITTED SHADE POINT HEIGHT (In Feet) Distance to North -south lot dimension (in feet) shade ■00+ 95 90 85 80 75 70 65 60 • 55 50 45 40 reduction line from northern 70 . 0 40 40 41 42 43 44 65 8 38 38 39 40 41 42 43 60 .6 36 36 37 38 39 40 41 42 55 3• 34 34 35 36 37 38 39 40 41 50 3v 32 32 33 34 35 36 37 38 39 40 45 31 30 30 31 32 33 34 35 36 37 38 39 • 40 2: 28 28 29 30 31 32 33 34 35 36 37 38 35 • 2. 26 26 27 28 29 30 31 32 33 34 35 36 30 2. 24 24 25 26 27 28 29 30 31 32 33 34 25 2 22 22 23 24 25 26 27 28 29 30 31 32 20 21 20 20 21. 22 23 24 25 26 27 28 29 30 15 1 18 18 19 20 21 22 23 24 25 26 27 28 10 1. 16 16 17 18 19 20 21 22 23 24 25 26 5 1. 14 14 15 16 17 18 19 20 21 22 23 24 Box D. Maximum allowed shade point height: 4 2+ feet 6/9/00 - Activities for Case #: MST96 -00203 • 3:41:10 PM Assigned Hold Updated Activity Description Date 1 Date 2 Date 3 To Done By Disp. Level By Updated Notes MSTA005 Application received 4/5/96 JH PASS BT2 4/26/96 MSTA008 Permit Created 4/26/96 RT PASS BT2 4/26/96 MSTA010 Check for prd. restrict. 4/25/96 RT PASS BT2 4/26/96 MSTA012 Plans routed to Plans Examiner 4/25/96 JH PASS BT2 4/26/96 MSTA026 Plans approved by Plans Exmr 4/25/96 RT PASS BT2 4/26/96 MSTA030 Reviewed plans routed to DSTS 4/25/96 RT PASS BT2 4/26/96 MSTA705 Footing Insp 5/23/96 KS APP KBS 5/24/96 MSTA706 Foundation Insp 6/10/96 RB PASS RB 6/11/96 pending- seismic restraint; retaining wall detailing; ventilation MSTA710 Post/Beam Structural 9/10/96 RB FAIL RB 9/12/96 bearing pads missed; remove debris; lap vapor barrier; locate low point drain; dry-pack sewer thru penetration. MSTA711 Post/Beam Mechanical 8/29/96 RB PASS RB 8/30/96 MSTA717 PLM /Underfloor 9/10/96 MS PASS MRS 9/11/96 MSTA720 Mechanical Insp • 8/21/96 RB FAIL . • RB 8/22/96 incomplete MSTA722 Plumb Top Out 8/21/96 MS PASS MRS 8/21/96 MSTA723 Electrical Service 8/21/96 GS DIS GES 8/21/96 no label; note, wtr bond needs to be moved to dear gypbd MSTA725 Framing Insp 8/21/96 RB FAIL RB 8/22/96 electrical /plumbing top -out req'd prior to framing MSTA726 Shear Wall Insp 8/7/96 RB FAIL RB 8/7/96 post address; no plans on site MSTA735 Gas Line Insp 8/21/96 RB FAIL RB 8/22/96 0# MSTA745 Gyp Board Insp 9/24/96 KS DIS KBS 12/6/96 #-1- shear nailing not applicable gypsum #-2- provide clearance at B vent #-3- screws not allowd to penetrate inner wall of B vent #-4- protect supporting members at garage adjacent to gas piping MSTA755 Rain drain Insp 6/18/96 MS PASS MRS 6/19/96 around bldg only req. back -water valve MSTA760 Water Line Insp 9/27/96 MS PASS MRS 10/1/96 MSTA765 Appr /Sdwlk Insp 11/25/96 PI PASS RB 12/4/96 APPROACH MSTA790 Electrical Final 12/6/96 MJR PASS MJR 12/6/96 rear lower outside plug needs cover shower light needs trim Page 1 of 4 I 6/9/00 Activities for Case #: MST96 -00203 3:41:10 PM Assigned Hold Updated Activity Description Date 1 Date 2 Date 3 To Done By Disp. Level By Updated Notes MSTA795 Mechanical Final 12/6/96 KS DIS KBS 1/29/97 #-1- a/c installation not complete #-2- clothes dryer vent exceeds allowable limits • needs to be increased tto five inch diameter MSTA797 Plumb Final 12/6/96 MS PASS MRS 12/6/96 MSTB708 Erosion Control 1/10/97 W/C APP KBS 1/10/97 MSTA080 (F) Ready to issue 4/29/96 CJS PASS CJS 4/29/96 MSTA092 (F) Issue combination permit 5/16/96 JMH PAID • J'H 5/16/96 MSTA097 Issue plumbing signature form 5/16/96 JMH PAID J'H 5/16/96 MSTA098 Issue electric signature form 5/16/96 JMH PAID J'H 5/16/96 MSTA726 Shear Wall Insp 8/9/96 8/9/96 RB FAIL RB 8/12/96 seath areas w/ slanted lines at garage; secure HD's adjacent • wall to entry w/in garage; nail #2 above location splices; HD's . at fwd L.R. not brought up thru • floor; nail sheathing and add straps where missed; Hp- nails= 14. MSTA726 Shear Wall Insp 8/13/96 8/13/96 RB PASS RB 8/13/96 tighten HD's MSTA720 Mechanical lnsp 8/27/96 KS DIS KBS 8/27/96 #-1- see frsming notes MSTA735 Gas Line Insp 8/26/96 KJS DIS KBS 8/27/96 #-1- pressure not adequate for test MSTA725 Framing lnsp 8/26/96 KS DIS KBS 8/27/96 #-6- strap header to plates patio door #-7- add stud under splice at plates front bedrooms #-8- nail each side of double hips #-9-provide attic access above liv /rm #-10 -attic ventilation not . attic #-11 -vent exhaust fans to roof jacks and secure above roof sheathing #-12 insulate heat ducts at attic exposed wyes #-13- support hips, ridge, as shown vent exhaust fan at half bath to ext MSTA725 Framing Insp 8/27/96 KS . DIS KBS 8/28/96 #-1- corrections not completed MSTA720 Mechanical lnsp 8/29/96 RB PASS RB 8/30/96 pending- seal punchered b -vent connector; soffit duct in garage. MSTA725 Framing lnsp 8/29/96 RB FAIL RB 8/30/96 electrical failed; mech. issues; laminate floor joists notched; support valley - fwd bedrm lower end; vent baffles; under -floor plumbing, post/beam structural inspection not yet done. Page2of4 6/9/00 Activities for Case #: MST96 -00203 3:41:10 PM Assigned Hold Updated Activity Description Date 1 Date 2 Date 3 To Done By Disp. Level By Updated Notes MSTA735 Gas Line Insp 8/29/96 RB PASS RB 8/30/96 MSTA723 Electrical Service 9/3/96 8/26/96 MJR PASS MJR 9/3/96 tighten damp MSTA724 Electrical Rough In 9/3/96 8/26/96 MJR PASS MJR 9/3/96 MSTA724 Electrical Rough In 8/16/96 MJR DIS MJR 9/3/96 no label bond water line MSTA725 Framing Insp 9/10/96 RB FAIL RB 9/12/96 vent baffles missed; protect metal supply duct at garage slab level; under -floor issues MSTA740 Insulation Insp 9/10/96 RB FAIL RB 9/12/96 insulate water lines w /in garage; vent baffles; firestop thru penetrations; chink . window /doors; insulate inner connection wall- seen from garage; insulate bottom of pan of rect. heat duct in soffit of garage. MSTA710 Post/Beam Structural 9/12/96. RB FAIL RB 9/12/96 insulation issues un- resolved as per this date- inspection terminated! MSTA725 Framing Insp 9/12/96 RB FAIL RB 9/12/96 incompleted insulation issues- concrete green wfin garage -no access. MSTA740 Insulation Insp 9/12/96 RB FAIL RB 9/12/96 incompleted issues- inspection terminated! MSTA725 Framing Insp 9/17/96 RB PEND RB 9/17/96 vent baffles missed! MSTA740 Insulation Insp 9/17/96 RB PEND RB 9/17/96 vent baffles! MSTA725 Framing Insp 9/18/96 KS DIS KBS 9/20/96 #-1- framing corrections by RB not completed MSTA725 Framing Insp 9/20/96 RB PASS RB 9/20/96 MSTA740 Insulation Insp 9/20/96 RB PASS RB 9/20/96 MSTA745 Gyp Board Insp 9/30/96 RB PASS RB 9/30/96 MSTA745 Gyp Board Insp 9/30/96 KS DIS KBS 10/7/96 #-1- corrections not completed at this time MSTA795 Mechanical Final 12/9/96 KS DIS KBS 1/10/97 #-1- this inspection for final mechanical ( only) #-2- increase clothes dryer vent to four inch diameter length exceeds allowable limits MSTA795 Mechanical Final 1/10/97 KS APP KBS 1/10/97 MSTA798 Final inspection 1/10/97 KS NN KBS 1/29/97 #-1- finish grading not done at this time due to wet weather conditions MSTA970 Case Finaled 1/10/97 KS APP KBS 1/10/97 MSTA960 (F) Issue Cert. of Occupancy 1/10/97 JT 1/14/97 Page 3 of 4 6/9/00 Activities for Case #: MST96 -00203 3:41:10 PM Assigned Hold Updated Activity Description Date 1 Date 2 Date 3 To Done By Disp. Level By Updated Notes MSTA097 Issue electric signature form 1/16/97 JT 1/16/97 MSTA097 Issue electric signature form 1/27/97 JT 1/27/97 MSTA097 Issue electric signature form 2/6/97 KAS PASS RB 2/6/97 REC'D SIGN FORM 2 -5-97 • • • Page4of4 • a CITY OF TIGARD BUILDING INSPECTION NOTICE Inspection Line: 639 -4175 Business Phone: 639 -4171 Footing Rain Drain Cover /Service FINAL: Foundation Water Line Ceiling diiirP. Post/Beam Mech. Shear /Sheath Framing -Mech. PIbg.Und /FIr /Slab Plbg. Top Out Insulation - Elect. Post/Beam Struct. Mech. Rough -in Gyp. Bd. -Bldg. San. Sewer Gas Line Appr /Sdwlk Reins. Other: r I Q r Date: I Di (P \ `9 A.M P.M. Entry: ■ 0 • I1 Address: _ • A . 4 . ' / _ _� • 4 i Tenant: 'St ' MST: i 02-0 / BUP: /1. /Own: % - �P 4i,2_- J 1 MEC: PLM ELC: : THE FOLLOWING CORRECTIONS ARE REQUIRED: ELR: / / Ins ector! ?77 Date;/. 9` ROVED _DISAPPROVED /CALL FOR REINSP. CF CO CITY OF TIGARD BUILDING INSPECTION NOTICE Inspection Line: 639 -4175 Business Phone: 639 -4171 Footing Rain Drain Cover /Service FINAL: Foundation Water Line Ceiling - Plumb. Post/Beam Mech. Shear /Sheath Framing - -ch. PIbg.Und /FIr /Slab Plbg. Top Out Insulation Post/Beam Struct. Mech. Rough -in Gyp. Bd. -Bldg. San. Sewer Gas Line Appr /Sdwlk Reins. Other: Date: 1(O 19�a • _ �� A.M. P.M. Ent Address: l pZ R7 3 • _ " Tenant: Ste: i / MST: q( 01.03 Con /Own: 4601-/L, (O ( 4dZ-" J ����� %� MEC: � PLC: ELM: THE FOLLOWING CORRECTIONS ARE REQUIRED: ELR: it 8r (iw) .e_ cf, cifis e tt, 2 s / , Q r ��; /4 -e e s c ©�-e--d; Q -er C9 f r- s ir es \ ,® - I - . Ar // / 411 I Ins ector: � `� ,' _' Date: — � Lo APPROVED _ DISAPPROVED /CALL FOR REINSP. ( - F CO CITY OF TIGARD BUILDING INSPECTION NOTICE Inspection Line: 639 -4175 Business Phone: 639 -4171 Footing Rain Drain Cover /Service 'Vraillw Foundation Water Line Ceiling - Plumb. Post/Beam Mech. Shear /Sheath Framing -Mech. PIbg.Und /Flr /Slab Plbg. Top Out Insulation - Elect. Post/Beam Struct. Mech. Rough -in Gyp. Bd. .5. San. Sewer Gas Line Appr /Sdwlk Reins. Other: Date: d/0/97 A.M. P.M. Entry: Address: 1 2.873 .-- '''L 5 r u. Tenant: Ste: MST: c— 42Q3 BUP: Con /Own: MEC: PLM: ELC: THE FOLLOWING CORRECTIONS ARE REQUIRED: ELR: Inspector: ,21 Date:0/e 0/Q = f1 _ DISAPPROVED /CALL FOR REINSP. CF CO eV 1 Q> 15---( .ar....a. CITY OF TIGARD BUILDING INJECTION NOTICE Inspection Line: 639 -4175 Business Phone: 639 -4171 Footing Rain Drain Cover /Service FINAL: f , Foundation Water Line Ceiling - Plumb. Post/Beam Mech. Shear /Sheath Framing �t'1• PIbg.Und /Flr /Slab Plbg. Top Out Insulation - Elect. Post/Beam Struct. Mech. Rough -in Gyp. Bd. : • • San. Sewer Gas Line Appr /Sdwlk Reins. Other: 1 t G� �1 Date: I 1 I \ ` 1 ' A.M. P.M Entry: /,K., Address: ; 7 it • i - - _ _,./ _7 • - Tenant: sa4" y pit/ MST: C /6 DSO C. BUP: Con /Own: tP / MEC: PLM: ELC: THE FOLLOWING CORRECTIONS ARE REQUIRED: ELR: 47 . � r/ Pas /a.v C� r,�c'C� /� �i° I 7�S' • 3_7 6r-t,iA� s ,'" ,4v i ..sg e.J <A.J Ch977/ss --- 7E. v r— cr. E. , 5 2721,0‘....) A 8 hE Li 1...., ITS . 9 G = Asp. - T - o r v� I /4C-64 (- P 1 41.44 4 ;tr In ctor: Date: L1_J_' 7 i _APPROVED _ DISAPPROVED /CALL FOR REINSP. CF CO