Loading...
Permit CI1YOFTIGARD MASTER PERMIT COMMUNITY DEVELOPMENT DEPARTMENT PERMIT # : MST96 -0367 13125 SW Hall Blvd. Tigard. Oregon 97223.8199 (503) 639 -4171 DATE ISSUED: 1217/24/96 PARCEL: 2S104DD -01900 SITE ADDRESS...: 12880 SW RIDGEFIELD LN SUBDIVISION • MOUNTAIN HIGHLANDS #2 ZONING: R -4.5 BLOCK • LOT •016 Remarks: PATH I - - - - - -- ------------------------ -- - - -- BUILDING -------- - - - - -- --------------- - -- REISSUE: STORIES • 2 FLOOR AREAS — BASEMENT...: 0 sf REQUIRED SETBACKS— REQUIRED------- -- CLASS OF WORK.:NEW HEIGHT • 30 FIRST • 2144 sf GARAGE • 410 sf LEFT • 20 SMOKE DETECTRS: Y TYPE OF USE...:SF FLOOR LOAD • 40 SECOND...: 1253 sf FRONT : 20 PARKING SPACES: 1 TYPE OF CONST.:5N DWELLING UNITS: 1 FINBSMENT: 0 sf RIGHT : 15 OCCUPANCY GRP.:R3 BDRM: 3 BATH: 4 TOTAL - - - -: 3397 sf VALUE..$: 226661 REAR • 15 - - - -- -------- ____-------------- - - - - -- PLUMBING --- - - - - -- ---- - ----- SINKS : 2 WATER CLOSETS.: 4 WASHING MACH..: 1 LAUNDRY TRAYS.: 1 RAIN DRAIN ft: 0 TRAPS • 0 LAVATORIES • 5 DISHWASHERS...: 1 FLOOR DRAINS..: 0 SEWER LINE ft: 0 SF RAIN DRAINS: 1 CATCH BASINS..: 0 TUB /SHOWERS...: 4 GARBAGE DISP..: 1 WATER HEATERS.: 1 WATER LINE ft: 100 BCKFLW PREVNTR: 1 GREASE TRAPS..: 0 OTHER FIXTURES: 0 -- - - -- - - - - - -- --------------- - - - - -- MECHANICAL ----------- - - - - -- --------------- FUEL TYPES— -- FURN (100K ..: 0 BOIL /CMP ( 3HP: 0 VENT FANS • 5 CLOTHES DRYERS: 1 /GAS/ / / FURN ) =1'AK ..: 1 UNIT HEATERS..: 0 HOODS : 1 OTHER UNITS...: 1 MAX INP.: 0 BTU FLOOR FURNACES: 0 VENTS • 0 WODDSTOVES....: 0 GAS OUTLETS...: 1 - _----- -__ - -_ ---- - ---__ ---- -- ELECTRICAL — RESIDENTIAL UNIT --- --- SERVICE /FEEDER— —TEMP SRVC /FEEDERS -- --- BRANCH CIRCUITS -- - - -- MISCELLANEOUS - -- - -ADD'L INSPECTIONS- - 1000 SF OR LESS: 1 0 - 200 amp..: 0 0 - 2w amp..: 0 W /SVC OR FOR..: 0 PUMP /IRRIGATION: 0 PER INSPECTION: 0 EA ADD'L 500SF.: 6 201 - 400 amp..: 0 201 - 400 amp..: 0 1st W/O SVC /FDR: 0 SIGN /OUT LIN LT: 0 PER HOUR : 0 LIMITED ENERGY.: 0 401 - 600 amp..: 0 401 - 600 amp..: 0 EA ADDL BR CIR: 0 SIGNAL /PANEL...: 0 IN PLANT • 0 MANF HM /SVC /FDR: 0 601 - 1'A'' amp.: 0 601 +amps- 1m v: 0 MINOR LABEL -10: @ 1000+ amp /volt.: 0 ----------------------------------- PLAN REVIEW SECTION - - ---- Reconnect only.: 0 ) =4 RES UNITS..: SVC /FDR) =225 A.: ) 600 V NOMINAL: CLS AREA /SPC OCC: ---------------- - - - - -- ELECTRICAL - RESTRICTED ENERGY - -- --- - --- ---- --- - A. SF RESIDENTIAL - - - -- B. COMMERCIAL---- - - - - -- -------- - - ---- AUDIO & STEREO.: VACUUM SYSTEM..: AUDIO & STEREO.: FIRE ALARM INTERCOM /PAGING: OUTDOOR LNDSC LT: BURGLAR ALARM..: OTH: :: X BOILER HVAC LANDSCAPE /IRRIG: PROTECTIVE SIGNL: GARAGE OPENER..: CLOCK INSTRUMENTATION: MEDICAL OTHR: .. HVAC DATA /TELE COMM.: NURSE CALLS TOTAL 0 SYSTEMS: 0 Owner: ------------------ --- - - Contrac — TOTAL FEES:S 4979.91 ANDREW KEAM MASTER HOME BUILDERS 9895 SW HIALEAH PL 14800 NW CORNELL RD MITE 022-0 BEAVERTON OR 97005 PORTLAND OR 97229 Phone B: 524 -8058 Phone 0: 617 -0125 Reg 0..: 108962 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of Ore. Specialty Codes and all other applicable laws. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more than 180 days. ------- - - ---- ---- - - - - -- REQUIRED INSPECTIONS --------------------------- Footing Insp PLM /Underfloor Framing Insp Gas Fireplace Water Service In Building Final Foundation Insp Mechanical Insp Shear Wall Insp Insulation Insp Appr /Sdwlk Insp Erosion Control Post /Beam Struct Plumb Top Out Low Voltage Gyp Board Insp Electrical Final Post /Beam Meehan Electrical Servi Fireplace Insp Rain drain Insp Mechanical Final Crawl Drain Electrical Rough Gas Line Insp Water Line Insp Plumb Final Permittee Signature: .'����,_,_ _ Is mod By: Call for inspection — 639 -4175 ._______ dietti/e4■— r Residential Building Permit Application 1 City of Tigard . I // 13125 SW Hall Blvd. ��--yyjj�� G�IJ i p (;e r6, Tigard, OR 97223 `Z�" v I g � (503) 639 -4171 I Jobsite Address: M i � X14 r � � � � a# Z T it , Subdivision: M +, 141 Ccl LAND Lot # I re Office Use Only Valuation ' 0 2 0 2 , 6/ c''' Contact Date q f) + /qfi Initials - :. Result Clnor ler ,tP { . -, New Construction Only: (Square Footage) , ! G� / Planck/Rec # c i House: , % 1 7 • fGarage: 410 V+ • Permit # h1,5t 9G- 03 6 7 Reissue of / 1 / 4 - 1 7 A Corner Lot? l.` N Flag Lot? Y Q Map & TL # �S I o'-l 7— c:; Zone r-. � � Owner: ANDRW KEA-P1 Plat # f — ! Address: - I oq 6W , � 1,4 � -1—) pi_ , Approvals Re ire I v-,9Q TOnI , OR a O og P lanning Setbac � '`� Solar oz.. ,,,.„,„,,,,,,t,,,, Engineering /vL. -P 0q05 Phone: (+; O3) 5 2-4-- Other Contractor: 111fi16 lib: Iv ,i Items Required �I Address: let 190 NUJ 1 C- r 1Q4 ( K4 22 Subcontractors _�V,PI Truss Details p +0 , o K /92-21 Other /' Phone: ( 5 h m J -012-s Notes B / �U Ir a7v5.7 Contractors License # l 0 04 b (a ach copy of current Oregon license) f Contact Name: C 4tA" 14. { e°t ' ' 3 ' Contact Phone: 503 wA t- - 314g- ; 3 '1s Subcontractors: Arc C- � 4 (M Z,s 1.i Plumbing: D'•c?i�` — CnGr ler Addre . ;74 StVO • 4' • 4 P# - "Mechanical: OK 'Intl- (attach copy of cur .cent OR Contractor's License) 4 Electrical: 0 f _ _ ) ; ( . . " r - Cr o - ! ' s Phone: ( 93) 2 ? 0 JOB DESCRIPTION: •- � � . - - , (0 b,17 O 1 4 c Applicant Signature / , ) Applicant Phone number V CY Received by: Date Received: 4 \' ' H •IsS■'aststesaDp Permit * Account Description Amount Amt. Pd. Bal. Due ivf` 0 3l7 Bldg. Permit (BUILD) 7J0.)1) 7$o•,Sa Plumb. Permit (PLUMB) 09 q f/ .20 Mech. Permit (MECH) 91 -- .Z6 o State Tax (TAX) 10 .777 Bldg: 37, J) 73g ..12.7_35..' Plumb: /2 `/) Mech: i 0 Elecfricc.! --Fe/ II Plan Check (PLANCK) V s ' 7'j3 2 37 S3 Bldg: z/e7 e3 Plumb: Mech: / Z i = I Z �,,KY64 3 y't Sewer Connection (SWUSA) v? y2 u v Sewer Inspection (SWINSP) 3C 3.i Parks Dev Charge (PKSDC) / 0 SU / p SI) Residential TIF (TIF -R) / V 7 0 / 4 17 Mass Transit TIF (TIF -MT) / 2 0 /2o Commercial TIF (TIF -C) Industrial TIF (TIF -1) Institutional TIF (TIF -IS) Office TIF (TIF -0) Water Quality (WQUAL) /e /k Water Quantity (WQUANT) / 0 / v U Fire Life Safety (FLS) Erosion Cntri Permit (ERPRMT) Sd: 10 el'Si Erosion Planck/USA (ERPLAN) 0. (5"•L 0 Erosion Planck/COT (EROSN) 0 � - 4 ° A., TOTALS: 72 ii-. V 695'4 .91 Solar Balance Point Standard Worksheet • Address / Fq c81) Box A calculations: North -South dimension for the lot. Box A: This dimension is determined by finding the midpoint of the North lot line and drawing an intersecting line perpendicular to that point. First, determine which property line is the North lot line. The North lot line is the line with the smallest angle from a line drawn east -west and intersecting the northern most point of the lot. • LOT L K NE N North -South Dimension for Lot: Measure the distance from the midpoint of the North lot line to the South lot line along the described line. * feet 1.4 1 N NCM..SO DI CIMEKGON Box B calculations: Shade point height for your residence. Box B: 1. Determine whether measurements will be based on the peak or eave of your structure. The orientation of the ridge is also important. Which describes your residence? la: If the roof line runs North - South, measurements will `i (circle one) be based on the peak of the roof. - a a e Hul im N°°"' "'' 1A 1B • tt. 1 b: If the roof line runs East -West and the roof pitch is less than 5/12, measurements will be based on the 5 eave. 2r 4J5 s, CE T:NT E.A'£ 1c: If the roof line runs East -West and the roof pitch is 5,1 2 or steeper, measurements will be based on the °= tj peak. swore .r 10;e Box B. continued Box B: 2. Measure change in elevation from front property line to finished floor elevation. If the slopes up from the front lot line to the foundation, the figure is positive. If ft the lot slopes down from the front lot line to the foundation, the figure is negative. _ 3. Measure distance from finished floor elevation to the affected peak/eave. + ` jam ft 4. If the roof line runs North- South, deduct three feet. If the roof line runs East -West, - ft deduct nothing. 5. Subtract one foot for each foot of difference in elevation from the front property line to the rear property line, if the lot slopes up from the front to the rear. If the '95-- 7 lot has no slope or slopes up from the rear to the front, deduct nothing. - ft r 6. Total figure for box B: �^ 3 Box C. Distance to the shade reduction line. _ Box C: 1. Measure the distance from the North property line to the foundation near the ft affected peak/eave. • 2. Measure the distance from the foundation to the affected peak or eave. + AP ft • W 3. Total figure for box C: ao f It is most useful to draw a vertical line to represent the appropriate figure found in box "A" and a horizontal line to represent the appropriate figure found in box C. The intersection of the vertical and horizontal lines determines the value found in box "D ". The value in box "D should be compared to the value in box "8 "; if the value in box "B" is less than or equal to the value found in box "D ", then the building is in compliance with the solar balance code. If you have any questions, please contact us at 639 -4171, x304 or at the Community Development Counter. MAXIMUM PERMITTED SHADE POINT HEIGHT (In Feet) Distance to North -south lot dimension (in feet) shade 1 ' 95 90 85 80 75 70 65 60 55 50 45 40 reduction line from northern • Jot line (in feet) 70 -40 40 40 41 42 43 44 • 65 38 38 38 39 40 41 42 43 60 36 36 36 37 38 39 40 41 42 55 34 34 34 35 36 37 38 39 40 41 50 32 32 32 33 34 35 36 37 38 39 40 45 30 30 30 31 32 33 34 35 36 37 38 39 40 28 28 28 29 30 31 32 33 34 35 36 37 38 35 - 26 26 26 27 28 29 30 31 32 33 34 35 36 30 24 24 24 25 26 27 28 29 30 31 32 33 34 25 22 22 22 23 24 25 26 27 28 29 30 31 32 20 20 20 20 21 22 23 24 25 26 27 28 29 30 15 18 18 ,18 19 20 21 22- 23 24 25 26 27 28 10 16 16 16 17 18 19 20 21 22 23 24 25 26 • 5 14 14 14 15 16 17 18 9 20 21 22 23 24 I Box D. Maximum allowed shade point height: () feet h:tdoc.sinancy'wenturawlar.chp �' Revised 2 /26/96 411/41). • Solar Balance Point Standard Worksheet Address Box A calculations: North -South dimension for the lot. Box A: This dimension is determined by finding the midpoint of the North lot line and drawing an intersecting line perpendicular to that point. First, determine which property line is the North lot line. The North lot line is the line with the smallest angle from a line drawn east -west and intersecting the northern most point of the lot. 45° - • t ARV t NORTHERN N North -South Dimension for Lot: Measure the distance from the midpoint of the North lot line to the South lot line along the described line. jZe feet NOM-SOUTH ORAENSION r Box B calculations: Shade point height for your residence. Box B: 1. Determine whether measurements will be based on the peak or eave of your Which describes structure. The orientation of the ridge is also important. your residence? 1 a: If the roof line runs North - South, measurements will (circle one) be based on the peak of the roof. E:1000 uur.luuu Nails 'i 1A 1 B C, 1 b: If the roof line runs.East -West and the roof pitch is less than 5/12, measurements will be based on the N.� Sn 17 ROd Mai eave. SHADE POINT EA'E 1c: If the roof line runs East -West and the roof pitch is 5/12 or steeper, measurements will be based on the �z R� peak. ad� R:. PCGE Box B. continued Box B: 2. Measure change in elevation from front property line to finished floor elevation. If the lot slopes up from the front lot line to the foundation, the figure is positive. If ft the lot slopes down from the front lot line to the foundation, the figure is negative. 3. Measure distance from finished floor elevation to the affected peak/eave. + ft 4. If the roof line runs North - South, deduct three feet. If the roof line runs East -West, - ft deduct nothing. 5. Subtract one foot for each foot of difference in elevation from the front property line to the rear property line, if the lot slopes up from the front to the rear. If the lot has no slope or slopes up from the rear to the front, deduct nothing. - ft 6. Total figure for box B: ft Box C. Distance to the shade reduction line. Box C: 1. Measure the distance from the North property line to the foundation near the ft affected peak/eave. 2. Measure the distance from the foundation to the affected peak or eave. + ft 3. Total figure for box C: ft It is most useful to draw a vertical line to represent the appropriate figure found in box "A" and a horizontal line to represent the appropriate figure found in box "C ". The intersection of the vertical and horizontal lines determines the value found in box "D ". The value in box "D" should be compared to the value in box "B "; if the value in box "B" is less than or equal to the value found in box "D ", then the building is in compliance with the solar balance code. If you have any questions, please contact us at 639 -4171, x304 or at the Community Development Counter. - MAXIMUM PERMITTED SHADE POINT HEIGHT (In Feet) j Distance to North -south lot dimension (in feet) z -_ 100+ 95 90 85 80 75 70 65 i='7 55 50 45 40 reduction line from northern Jot line (in feet) 70 40 40 40 41 42 43 44 65 38 38 38 39 40 41 42 43 60 36 36 36 37 38 39 40 41 42 55 34 34 34 35 36 37 38 39 40 41 50 32 32 32 33 34 35 36 37 38 39 40 45 30 30 30 31 32 33 34 35 36 37 38 39 40 28 28 28 29 30 31 32 33 34 35 36 37 38 35 26 26 26 27 28 29 30 31 32C' 33 34 35 36 30 24 24 24 25 26 27 28 29 30Y 31 32 33 34 25 22 22 22 23 24 25 26 27 28 29 30 31 32 20 20 20 20 21 22 23 24 25 26 27 28 29 30 15 18 18 18 19 20 21 22 .23 24 25 26 '27 28 10 16 16 .16 17 18 19 20 21 22 23 24 25 26 5 14 14 14 15 16 17 18 19 20 21 22 23 24 Box D. Maximum allowed shade point height: feet • 1 Permit #: piST qt„ - D✓' �,'r] Address: I 2 tpo sot) tz-49_0 L. n Issued by: Date: Statement: Information Notice to Property Owners About Construction Responsibilities Note: Oregon Law, ORS 701.055(4), requires residential construction permit appli- cants who are not registered with the Construction Contractors Board to sign the following statement before a building permit can he issued. This statement is required for residential building, electrical, mechanical, and plumbing permits. Licensed architect and engineer applicants, exempt from registration under ORS 701.010(7), need not submit this statement. This statement will be filed with the permit. Fill in the appropriate blanks and initial boxes 1 and 2, and either box 3A or 3B: 1. I own, reside in, or will reside in the completed structure. 1 /4 2. I understand that I must register as a construction contractor if the structure is sold or offered for sale before or upon completion. 3A. My general contractor is (Name) Contractor regis. # I will instruct my general contractor that all subcontractors who work on the structure must be registered with the Construction Contractors Board. OR 0,1 3B. I will be my own general contractor. If I hire subcontractors, I will hire only subcontractors registered with the Construction Contractors Board. If I change my mind and hire a general contractor, I will contract with a contractor who is registered with the CCB and will immediately notify the office issuing this building permit of the name of the contractor. I hereby certify that the above information is correct and that I have read and do understand the Information Notice to Property Owners about Construction Responsibilities on the reverse side of this form. (Signature of permit applicant) ( ate) (White copy to issuing agency permit file, pink copy to applicant) • Information Notice to Property Owners ..About Construction Responsibilities Note: This Information Notice to Property Owners about Construction Responsibilities was developed by the Construction Contractors Board in accordance with ORS 7 01.055(5). If you are acting as your own contractor to construct a new home or make a substantial improvement to an existing structure, you can prevent many problems by being aware of the following responsibilities and areas of concern. EMPLOYER RESPONSIBILITIES: If you hire persons not registered with the Construction Contractors Board to do labor in constructing or assisting in the construction or improvement of a residential structure, you will, in most instances, be ruled to be an employer and the people you hire will be employees. As the employer, you must comply with the following: Oregon's withholding tax law: As an employer, you must withhold income taxes from employee wages atthe time employees are paid. You will be liable for the tax payments even if you don't actually withhold the tax from your employees. For more information, call the Oregon Dept. of Revenue at 945 -8091. Unemployment insurance tax: As an employer, you are required to pay a tax for unemployment insurance purposes on the wages of all employees. For more information, call the Oregon Employment Department at 378 -3524. Workers' compensation insurance: As an employer, you are subject to the Oregon Workers' Compensation Law, and must obtain workers' compensation insurance for your employees. If you fail to obtain workers' compensation insurance. you may be subject to penalties and will be liable for all claim costs if one of your employees is injured on the job. For more information. call the Workers' Compensation Division at the Department of Consumer and Business Services at 945 -7888. U.S. Internal Revenue Service: As an employer, you must withhold federal income tax from employees' wages. You will be liable for the tax payment even if you didn't actually withhold the tax. For more information, call the Internal Revenue Service at 1- 800 - 829 -1040. OTHER RESPONSIBILITIES AND AREAS OF CONCERN: • Code compliance: As the penn it holder for this project, you are responsible for resolving any failure to meet code requirements that may be brought to your attention through inspections. Liability and property damage insurance: Contact your insurance agent to see if you have adequate insurance coverage for accidents and omissions such as falling tools, paint overspray, water damage from pipe punctures, fire, or work that must be re -done. Time to supervise employees: Make sure you have sufficient time to supervise your employees. Expertise: Make sure you have the expertise to act as your own general contractor, to coordinate the work of rough -in and finish trades, and to notify building officials at the appropriate times so they can perform the required inspections. If you have additional questions, write or call the Construction Contractors Board (PO Box 14140, Salem, OR 97309 -5052, 503/378 - 4621). The Board is located at 700 Summer St. NE Suite 300, in Salem. prop- own.pm4 1/94 5/23/00 Activities for Case #: MST96 -00367 2:41:30 PM • Assigned Hold Updated Activity Description Date 1 Date 2 Date 3 To Done By Disp. Level By Updated Notes MSTA005 Application received 6/28/96 JD PASS BT2 7/10/96 • MSTA008 Permit Created • 7/10/96 RT PASS BT2 7/10/96 MSTA010 Check for prd. restrict. 7/5/96 JD PASS BT2 7/10/96 MSTA012 Plans routed to Plans Examiner 7/5/96 JD PASS BT2 7/10/96 MSTA026 Plans approved by Plans Exmr 7/10/96 RT PASS BT2 7/10/96 MSTA030 Reviewed plans routed to DSTS 7/10/96 RT PASS BT2 7/10/96 MSTA705 Footing Insp 8/13/96 RB FAIL RB 8/13/96 . not ready! usa 8-6 MSTA706 Foundation lnsp 8/26/86 KS APP KBS 8/27/96 MSTA710 Post/Beam Structural 9/9/96 RB PASS RB 9/9/96 PENDING- Tie main Runner I -Beam to ext walls; ok for plumbing and mech to be viewed later MSTA•11 Post/Beam Mechanical 4/10/97 KS NN KBS 4/11/97 #-1- increase clothes dryer vent to five inch diameter MSTA713 Crawl Drain 7/1/97 RAB PASS J'H 7/7/97 MSTA717 PLM /Underfloor 4/3/97 MS FAIL MRS 4/4/97 wrong fittings use venting incorrect MSTA720 Mechanical Insp 3/24/97 KS • NN KBS 4/11/97 #-1- vent exhaust fan at upper level tub bath to roof jack and . secure above roof sheathing #-2- wall around exposed ducts at uppr level, will check at framing #-3- kitchen exhaust duct not installed this time MSTA723 Electrical Service 3/26/97 GS APP GES 3/31/97 smk det in hall by mstr bdrm; rear ext pig • • MSTA725 Framing Insp 4/10/97 KS DIS KBS 4/11/97 #-1- plumbing top out not app #-2- provide full bearing under micro lam at din /rm positive connection #-3- provide bearing to grade at load points adjacent to fireplace #-4- add studs at cantilever fl joist #-5- fireblock ceiling line at utility #-6- support . under vallyes, hips and ridge • #-7- collar ties at comm rafters #-8- provide attic access MSTA726 Shear Wall Insp 2/4/97 KS PART KBS 2/4/97 #-1- this inspection is for rear wall of garage ( only) block all • joints at shear panels • MSTA727 Low Voltage BT2 7/10/96 MSTA730 Fireplace Insp BT2 7/10/96 MSTA735 Gas Line lnsp 3/7/97 KS N/R KBS 3/7/97 #-1- gas piping incomplete at this time Page 1 of 4 5/23/00 Activities for Case #: MST96 -00367 2:41:30 PM Assigned Hold Updated Activity Description Date 1 Date 2 Date 3 To Done By Disp. Level By Updated Notes MSTA736 Gas Fireplace BT2 7/10/96 MSTA740 Insulation Insp 4/23/97 KS N/R KBS 4/25/97 . MSTA745 Gyp Board Insp 4/30/97 KS APP KBS 5/1/97 MSTA755 Rain drain Insp 10/3/96 MS PART MRS 10/4/96 need underfloor crawl drain? need to go out 4" MSTA760 Water Line Insp 4/16/97 MS PASS MRS 4/17/97 MSTA761 Water Service Insp 8/4/97 MS PASS MRS 8/5/97 MSTA765 APpr /Sdwlk Insp 8/4/97 PI PASS S*W 8/5/97 1. compact rock; 2. finish forms; okay to pour. MSTA790 Electrical Final 8/22/97 BRP FAIL J "H 8/25/97 Wet bar no GFCI Outlet in equipment room not covered or finished. Outlet in upstairs . doset not covered. Front receptacle not GGCI protected. Garage receptacle not GFCI portected. Correct and test all GFCI outlets. Check SW outlets for proper protrusion through wall plate. Correct all and call for reinspection. Place signature form in panel. MSTA795 Mechanical Final 8/21/97 KS DIS KBS 8/22/97 #-1- see bldg final this date MSTA797 Plumb Final • 8/28/97 RAB FAIL RAB 8/28/97 No hot water. MSTA799 Building Final 8/21/97 KS DIS KBS 8/22/97 #-1- need electrical, and erosion control finals app #-2- step at man door garage to low #-3- kitchen range not functional also fireplaces #-4- sway brace post supporting ext decks #-5- extend over flow drain line from water heter to ext #-6- vapor barrier at crawl - voids) #-7- insulate exposed heat ducts at crawl space #-8- slope finish grade away from structure MSTA724 Electrical Rough In 3/26/97 GS APP DS 10/2/97 see service same date MSTA080 (F) Ready to issue 7/11/96 CJS PASS JD 7/23/96 This is on Jim D's desk as it was "issued" when the . computer was down and Charles Lee is going to bring in an owner's responsibility form for permit issuance. MSTA092 (F) Issue combination permit 7/24/96 JDA PASS JDA 7/24/96 • MSTA092 (F) Issue combination permit 7/24/96 JDA PASS JDA 7/24/96 Page2of4 5/23/00 Activities for Case #: MST96 -00367 2:41:30 PM Assigned Hold Updated Activity Description Date 1 Date 2 Date 3 To Done By Disp. Level By Updated Notes MSTA705 Footing lnsp 8/14/96 8/14/96 RB PASS RB 8/15/96 low point drain; ufer tagged usa 8 -6 MSTA726 Shear Wall lnsp 1/16/97 KS PART KBS 1/21/97 #-1- partial shear front of structure only. #-2- extend double studs to top plate at hpand 22 starps MSTA726 Shear Wall Insp 2/21/97 KS DIS KBS 2/21/97 #-1- no plans on site • MSTA726 Shear Wall lnsp 2/27/97 KS DIS TIP 3/20/97 #-1- incomplete holdowns not insyalled at main fl also straps fta straps between not installed MSTA735 Gas Line Insp 3/10/97 KS APP KBS 3/10/97 MSTA726 Shear Wall lnsp 3/19/97 TLP PASS TLP 3/20/97 MSTA720 Mechanical Insp 3/18/97 KS DIS KBS 3/31/97 #-1- see inspection notes MSTA726 Shear Wall Insp 3/21/97 KS A/N KBS 3/31/97 #-1- see attached revisions from structural eng; MSTA722 Plumb Top Out 4/17/97 MS PASS MRS 4/17/97 MSTA725 Framing Insp 4/17/97 KS A/N KBS 4/18/97 #-1- plumbing top out app #-2- screen eave vents #-3- provide post pier to grade adjacent to fireplace load point #-4- support rafters at mechanical rm ledger and struts MSTA740 Insulation lnsp 4/24/97 KS A/N KBS 5/5/97 #-1- under fl not insulated at this time #-2- general contractor has indicated that batt insulation will be used to insulate ceiling to R -38 value. MSTA755 Rain drain Insp 7/1/97 RAB PASS J'H 7/7/97 MSTA790 Electrical Final 8/25/97 MJR DIS MJR 8/25/97 no signing supervisor MSTA770 Misc. Inspection 8/25/97 MJR CALL MJR 8/27/97 need to have signing supervisor or owner call MSTA770 Misc. Inspection 8/26/97 MJR DIS MJR 8/27/97 corrections not complete 1. terminate conductors in equipment room 2. need blank plate 3. switches needed in several rooms MSTA795 Mechanical Final 8/28/97 KS PASS J'H 8/29/97 AC unit (condenser not installed at this time, homeowner will install later). MSTA799 Building Final 8/28/97 KS PEND JT 9/5/97 approved as noted need plumbing, electrical & erosion control finaled MSTA797 Plumb Final 9/2/97 MS PASS J'H 9/2/97 Approved subject to corrections: 1. Need to cap rain drain 2. Hose bib not approved. Page 3 of 4 5/23/00 Activities for Case #: MST96 -00367 • 2:41:30 PM Assigned Hold Updated Activity Description Date 1 Date 2 Date 3 To Done By Disp. Level By Updated Notes MSTA790 Electrical Final 9/3/97 9/3/97 BRP PASS J'H 9/3/97 This job appears to meet the minimum standards for code compliance. Switch locations in some areas are questionable for convenience and safety, when entering a room. Recessed fixture trims do not cover all openings on building surface. An additional receptacle should be at wet bar. Approval is made with reservations as to integrity of complete job, and acceptance of liability by "MY ELECTRIC CONTRACTOR #4144S." MSTA960 (F) Issue Cert. of Occupancy 8/28/97 JT JT 9/5/97 • Page 4 of 4 • CITY OF TIGARD BUILDING INSPECTION DIVISION 24 -Hour Inspection Line: 639 -4175 Business Phone: 639 -4171 Date Requested: — — C l 7 A.M. P.M. MST: 9 4 --- 3 6 7 Location: 1 O V C ' U. BUP: Tenant: G �nn / Suite: Bldg: MEC: Contractor: � SC //)' I- C_X..G. C . Phone: Fi (p - / -7 ? / 7 PLM: Owner: Phone: ELC: ELR: SIT: BUILDING BLDG (con't) PLUMBING MECHANICAL C LECTRIC SITE Site Post/Beam Post/Beam Post/Beam Cover /Service Sewer /Storm Footing Roof UndFl/Slab Rough -In Ceiling Water Line Slab Framing Top Out Gas Line Rough -In UG Sprinlder Foundation Insulation Sewer Hood/Duct Reconnect Vault Bsmt Damp Drywall Storm Furnace Temp Service MISC. Masonry Ceiling Rain Drain A/C UG Slab Shear /Sheath Fire Spklr /Alm Crawl/Found Dr Heat Pump Low Volt Approved Approved Approved Approv -. Approved Appr /Sdwlk Not Approved Not Approved Not Approved .r w ..roved Not Approved FINAL FINAL FINAL taran, FINAL 7W/S JOl3 /fAAR TD MEET 7WE N//f1/ //MUM .STA/V,Df}A,DS._ CD co 6& COMPA /If A/C E. S 'vi TCH Lo Cf} T/ D At, /IV S6 ME /5t/4E/ S AR QUEST /DN6tl —) A C•, /6, i . i A, Al► W III AS . EA e . r el ✓ AZczssis-4 F /xTu.4S TA/Mg ,np NOT CDU,ER 114.4 DA• — A/M/ $ QI✓ Q LA( . SUR F-1-C E. »v AAoir / DA/IA L /lE s'hLA v&, et /4 WET ,t3A./Q t RP1AOvA -L. is A4 .9..0 wiTN RFsEAv.9t /oNs' AS To J/(/ - G. AI T/ OF Coit Mi. ETA J d a, Al IVd ACcEAThJVCE CA A/A 4 / L . / TX 8 j y �� my E'... ECTAl C Co /TA/� c7 `i-1 �}'t S. O Call for reinspection Reinspection fee of $ required before next inspection 0 Unable to inspect Inspector: Date: - 0 3 — f Page of CITY OF TIGARD BUILDING INSPECTION DIVISION 24 -Hour Inspection Line: 639 -4175 Business Phone: 639 -4171 Date Requested: 9 -2. - 9 7 A.M. PM MST: / C — b 3 G7 � S ■ �% Location: � � 7BNI / BUP: Tenant: I / Suite: Bldg: MEC: /' Contractor: l 1ath,Q Jj Phone: 8'16-77/7 PLM: Owner: Phone: ELC: 6:5 P/VI ELR: SIT: BUILDING BLDG (con't) LUMBING MECHANICAL ELECTRICAL SITE Site Post/Beam Po Post/Beam Cover /Service Sewer /Storm Footing Roof UndFl/Slab Rough -In Ceiling Water Line Slab Framing Top Out Gas Line Rough -In UG Sprinkler Foundation Insulation Sewer Hood/Duct Reconnect Vault Bsmt Damp Drywall Storm Furnace Temp Service MISC. Masonry Ceiling Rain Drain A/C UG Slab Shear /Sheath Fire Spklr/Ahn Crawl/Found Dr Heat Pump Low Volt Approved 4(a : ;..,c.► Approved Approved Approved Appr /Sdwlk Not Approved : .� ..,.. ed Not Approved Not Approved Not Approved FINAL INAL • �i FINAL FINAL FINAL I i / / //`` / / / , / ev / a , / O Call for reinspection O Reinspection fee of $ ) 7 t' 7 I7 i for next inspection O Unable to inspect Inspector: ��� �����` Q � Date: d Ji Paged_ of • • CITY OF TIGARD BUILDING INSPECTION NOTICE Inspection Line: 639 -4175 Business Phone: 639 -4171 Footing Rain Drain Cover /Service FINAL: Foundation Water Line Ceiling -Plum . Post/Beam Mech. C.lr /Sheath Framing -Mech. PIbg.Und /Flr /Slab Plbg. Top Out Insulation - Elect. Post/Beam Struct. Mech. Rough -in Gyp. Bd. -Bldg. San. Sewer Gas Line Appr /Sdwlk Reins. Other: �} Date: 3J I / 7 A.M. P.M. Entry: Address: a . • O r — •■ • Tenant: Ste: MST: ?6 0 367 BUP: Con /Own: , g1 6 -/ � ^] � MEC: PLM: ELC: THE FOLLOWING CORRECTIONS ARE REQUIRED: ELR: S7�uc�li/l�¢ -(- .exir. itid.�es Inspector: Date: 3 Z--A ct ROVED _ DISAPPROVED /CALL FOR REINSP. CF CO J . A • i .CSA CUMMINGS, SENKEL & ASSOCIATES 5 3 (p 7 CONSULTING ENGINEERS March 10, 1997 Mr. Bob Thompson City of Tigard 13125 S.W. Hall Blvd. Tigard, OR 97223 RE: Placement of hold downs, CSA Job #693, Mountain Highlands - #2, Lot 16, This letter is to address concerns regarding the apparent lack and placement of hold down anchors on specified shear walls for the subject structure. 1. Anchorage of walls to the foundation stemwall: A "during construction" design change relocated the garage main door such that there is no hold down at the end of the shear wall nearest the relocated door. The relocation resulted in two anchors at the opposite end. For lateral loads in the direction which usually requires a hold down at the end nearest the door, the hold downs at the opposite end will resist the shear load at the stemwall. The anchor bolts, which are normally designed to resist shear, are able to resist the uplifting effect. For lateral loads in the opposite directions, no hold downs arc required at the end nearest the door. The design change does not require a relocation or addition of hold downs. We understand that everywhere else, the pony wall of the main floor wall is anchored according to the original design. 2. Anchorage of pony wall to the main floor walls: The design was based on plans that did not show pony walls so that the connection of pony walls to main floor walls was left unspecified. We understand that the sheathing panels were installed such that there are no horizontal panel joints between the top of the pony wall and the bottom of the main floor wall. If this condition exists, then Simpson MST 72 or MST60 straps may be used at the locations shown on the enclosed main floor plan drawing to make this connection. 3. Anchorage of main floor walls to upper level walls: If the sheathing is installed between these walls as described above, Simpson MST72 or MST60 straps may be substituted for the designated hold downs as shown on the enclosed upper level floor plan drawing. The drawing also shows a modification of the upper level shear walls with the appropriate hold down noted. We trust that this will address all the concerns related to this oversight and appreciate your willingness to help resolve it. I f we can be of further help, please do not hesitate to call. Sincerely, Ga D. Falk, P.E. , PR Oft s tx GIN4 g, Enclosure �' 17 cc: Charles l.,ee O E c- GON��, 11 �FY S • 1Q -36 . ?t Floor • Portland, Oregon 97204 FAX (503) 228 -0475