Loading...
Plans OFFICE COPY . REVISION a I �UP 1111111 FILES /LAN < I ' i 208 CONFERENCE 60-0. I I► �N !MINI 202 \ ,,,� i„ � � 111 OH INsi T ER C. DESK FROM I FULL HT GLASS II PTRI TOUCH UP AS I v f; NEE�JLAY P TILES N - III REVI FINISHES. I I Q I 3 111' ECIEPTION 1 I D � - plik FULL HT J _ I f 2011 -- •rte-. 1 GLASS , 1 1 � aye ' I 0 LITE KIT a 0 I I I I = .. ,,. Q..`72.) SEE NOTE _ ifig — ,1-1 I I / / / 1Lb 4' -I0• • Ili ; Auk _ ; _ - 1 1 1 _- � 41 i r'll "1 1 1 l II i 4,5 I ` � ■ ■ OFFICE ~ I COPYIWOR I 66 MICRO • O z70 I - 1I1 209 9 I REF II • I - -- a I 2 BREAK - - 1 I CD 7F1 Fl + , 111• 1 et v ' m illiMbi III 111 � 'e� CLOSI = I I / O I 5,_4. I � NIP I 1 I 1 . I 1 .11 O FFICE ; ► I , I 1 ® % I- r 1 r -' 1 - m I ,' I I I 1 I \ L J L J 1 ' % OPEN OFFICE EQ EQ `,. `� 111 ■11 » ; �u ' ■ i ` � OFFICE OFFICE t CTt orT ara ® - Approved Plans _ By 13513 Dates -7$41"' 11-- - ■ - 66ro -% Re, oop LnNC 1'' — '•! III •w DOOR 211 NOTES: 2 90 ■' , DOOR 211 ON MAG HOLD OPENS. CONTRACTOR TO ` awl= Imo mom mom — mit■ ' 0 PRIVE CONNECTION TO BUILDING SMOKE DETECTION SYSTEM USING VENDOR HONEYWELL AREA OF WORK (TOM RIGGERS 503 -968- o RECEPTION 201 NOTE: F - PRICE TO REPLACE MARBLE TILE ON TOP AND ,/9 AWA Y �jfir4 i6 �� , BASE UBMIT PRI�E TTO PTR BEFOPERIAL BROWN. � � � y � L% � y Co D P / //G �.�Pll°�r/f' MAY 2 (� l x /0A49 /... Iry .i�,e/� 161 BLDG. STRUCNI ABOVE p _W l CAULKING N V2' .SPACE Q � DEFLECTION CHANNEL ►� BA INSUL PARALLEL TO -' •ED CEILING CENTER LME OF S'NAPPLI D BASE LAYER 5/8' TYPE X GYPSUM WALLBOAR EACH SIDE CF 3 5/8 METAL STUDS SPACED 24' 0.C. WITH I' TYPE S DRYWALL SCREW 8' OC. TO EDGES e AND 12' O.C. TO INTERMEDIATE STUDS. FACE LAYER 5/8' TYPE X GYPSUM WALLBOARD APPLIED PARALLEL TO STUDS OVER BASE LAYERS. STAGGER hill JOINTS 24' OL. EACH LAYER AND SIDE WITH 15/8' TYPE S DRYWALL SCREW 8' CC. TO EDGES AND 12' O.C. TO INTERMEDIATE STUDS. II BATT INSUL 4' RUBBER BASE -TYP. Ir ATTACH BOTTOM TRACK TO FLOOR WITH �e POWDER DRIVEN ANCHORS AT 24' O.C. IICARPET �� AND PAD x..11 FINISH FLOOR -TOP CF SLAB 1 6 1/8' 1 0 4 TWO HOUR WALL SECTION W/ INS. A -4 SCALE 1" = 1' -0" • • BLDG. STRUCTURE ABOVE CAULKING N I/2' SPACE '° -- -T' EXISTING SUSPENDED CEILING II/ I' GYP SHAFT LINER 2 LAYERS OF 5/8' TYPE X GYP. BRD. EXISTING WALL WI BASE LAYER 1' GYP SHAFT LINER ATTACHED TO EXISTING WALL WITH '14' 3 5/8' METAL STUDS CHANNEL a 24' O.G. AND 5/8' GYP. BOARD. SECOND LAYER 5/8' TYPE X GYPSUM WALLBOARD APPLIED HORIZONTAL WITH TYPE S DRYWALL SCREW 8' O.C. in TO EDGES AND 12' O.C. TO INTERMEDIATE STUDS. FACE LAYER 5/8' TYPE X GYPSUM WALLBOARD APPLIED VERTICALLY TO ADJ. TENANT NEW STUDS OVER BASE LAYERS. STAGGER ' TENANT JOINTS 24' OL. EACH LAYER WITH TYPE S DRYWALL SCREW 8' OL. TO EDGES AND 12' O.C. TO INTERMEDIATE STUDS. 4' RUBBER BASE -TYP. 1 FINISH FLOOR -TOP OF SLAB . . 4 1/8' 9 TWO HOUR SHAFT WALL SECTION A -4 SCALE 1" = 1' -0"