Plans OFFICE COPY
. REVISION
a I �UP 1111111 FILES /LAN <
I ' i 208
CONFERENCE 60-0. I I►
�N !MINI
202 \ ,,,� i„
� � 111 OH INsi T ER C. DESK FROM I FULL HT GLASS
II PTRI TOUCH UP AS
I v f; NEE�JLAY P TILES N -
III REVI FINISHES. I I Q
I 3 111' ECIEPTION 1 I D � - plik
FULL HT J _ I f 2011 -- •rte-. 1
GLASS , 1 1 � aye '
I 0 LITE KIT a 0 I I I I = .. ,,.
Q..`72.) SEE NOTE _ ifig — ,1-1 I I
/ / /
1Lb 4' -I0• •
Ili ; Auk _ ; _ - 1 1 1 _- � 41 i r'll "1 1 1 l II i 4,5 I ` �
■
■
OFFICE ~ I COPYIWOR I 66 MICRO
• O z70 I - 1I1
209 9 I REF II
• I
- -- a I 2 BREAK - -
1 I CD 7F1
Fl + , 111• 1 et
v '
m illiMbi III 111 � 'e� CLOSI = I I / O I 5,_4. I � NIP I 1 I
1 . I 1
.11 O FFICE ; ► I
, I
1 ® % I- r 1 r -' 1
- m I ,' I I I
1 I
\ L J L J
1
' % OPEN OFFICE EQ EQ
`,. `� 111 ■11 » ; �u
'
■
i
` � OFFICE OFFICE t
CTt orT ara ® -
Approved Plans _
By 13513 Dates -7$41"' 11-- -
■ - 66ro -% Re, oop LnNC 1'' — '•! III •w
DOOR 211 NOTES: 2 90 ■' ,
DOOR 211 ON MAG HOLD OPENS. CONTRACTOR TO ` awl= Imo mom mom — mit■ '
0 PRIVE CONNECTION TO BUILDING SMOKE
DETECTION SYSTEM USING VENDOR HONEYWELL AREA OF WORK
(TOM RIGGERS 503 -968- o
RECEPTION 201 NOTE: F -
PRICE TO REPLACE MARBLE TILE ON TOP AND ,/9 AWA Y �jfir4 i6 �� ,
BASE
UBMIT PRI�E TTO PTR BEFOPERIAL BROWN. � � � y � L% � y
Co D P / //G �.�Pll°�r/f'
MAY 2 (� l x /0A49 /... Iry .i�,e/�
161 BLDG. STRUCNI ABOVE p _W l CAULKING N V2' .SPACE
Q �
DEFLECTION CHANNEL
►� BA INSUL PARALLEL TO
-' •ED CEILING
CENTER LME OF S'NAPPLI D
BASE LAYER 5/8' TYPE X GYPSUM
WALLBOAR
EACH SIDE CF 3 5/8 METAL STUDS
SPACED 24' 0.C. WITH I' TYPE S
DRYWALL SCREW 8' OC. TO EDGES
e AND 12' O.C. TO INTERMEDIATE STUDS.
FACE LAYER 5/8' TYPE X GYPSUM
WALLBOARD APPLIED PARALLEL TO
STUDS OVER BASE LAYERS. STAGGER
hill JOINTS 24' OL. EACH LAYER AND SIDE
WITH 15/8' TYPE S DRYWALL SCREW 8'
CC. TO EDGES AND 12' O.C. TO
INTERMEDIATE STUDS.
II BATT INSUL
4' RUBBER BASE -TYP.
Ir ATTACH BOTTOM TRACK TO FLOOR WITH
�e POWDER DRIVEN ANCHORS AT 24' O.C.
IICARPET �� AND PAD
x..11 FINISH FLOOR -TOP CF SLAB
1 6 1/8' 1
0 4 TWO HOUR WALL SECTION W/ INS.
A -4 SCALE 1" = 1' -0"
•
•
BLDG. STRUCTURE ABOVE
CAULKING N I/2' SPACE
'° -- -T' EXISTING SUSPENDED CEILING
II/ I' GYP SHAFT LINER
2 LAYERS OF 5/8' TYPE X GYP. BRD.
EXISTING WALL WI BASE LAYER 1' GYP SHAFT LINER
ATTACHED TO EXISTING WALL WITH '14'
3 5/8' METAL STUDS CHANNEL a 24' O.G.
AND 5/8' GYP. BOARD.
SECOND LAYER 5/8' TYPE X GYPSUM
WALLBOARD APPLIED HORIZONTAL
WITH TYPE S DRYWALL SCREW 8' O.C.
in TO EDGES AND 12' O.C. TO
INTERMEDIATE STUDS.
FACE LAYER 5/8' TYPE X GYPSUM
WALLBOARD APPLIED VERTICALLY TO
ADJ. TENANT NEW STUDS OVER BASE LAYERS. STAGGER '
TENANT JOINTS 24' OL. EACH LAYER WITH TYPE
S DRYWALL SCREW 8' OL. TO EDGES
AND 12' O.C. TO INTERMEDIATE STUDS.
4' RUBBER BASE -TYP.
1 FINISH FLOOR -TOP OF SLAB
. . 4 1/8'
9 TWO HOUR SHAFT WALL SECTION
A -4 SCALE 1" = 1' -0"