Permit BUILDING PERMIT
CITY OF TIGARD DERMIT # ° UP96 -0171
DATE ISSUED: 04/15/96
COMMUNITY DEVELOPMENT DEPARTMENT 1
13125 SW Hall Blvd. Tigard, Oregon 97223.8199 (503) 839 -4171 PARCEL: 291 1 2DA -00700
SITE ADDRESS...: 06650 SW REDWOOD LN #390
SUBDIVISION • ZONING:I —P
BLOCK • LOT • .
REISSUE: FLOOR AREAS EXTERIOR WALL CONSTRUCTION —
CLASS OF WORK.:ALT FIRST • 0 sf N: S: E: W:
TYPE OF USE...:COM SECOND...: 0 sf PROTECT OPENINGS?
TYPE OF CONST.:3 -1HR ...: 0 sf N: S: E: W: 1
OCCUPANCY GRP.:B2 TOTAL 0 sf ROOF CONST: FIRE RET ?:
OCCUPANCY LOAD: 0 BASEMENT.: 0 sf AREA SEP. RATED:
STOR.: 3 HT: 0 ft GARAGE...: 0 sf OCCU SEP. RATED:
BSMT ?: MEZZ ?: REQD SETBACKS REQUIRED
FLOOR LOAD • 0 psf LEFT: 0 ft RGHT: 0 ft FIR SPKL:Y SMOK DET..:
DWELLING UNITS: 0 FRNT: 0 ft REAR: 0 ft FIR ALRM: HNDICP ACC:
BEDRMS: 0 BATHS: 0 IMP SURFACE: 0 PRO CORR: PARKING: 0
VALUE.$: 2000
Remarks: Fire suppression system.
I
Owner: FEES
PACTRUST type amount by date recpt
15350 SW SEQUOIA PKWY STE 300 PRMT $ 32.50 B 04/02/96 96- 277867
FIRE $ 13.00 B 04/02/96 96- 277867
PORTLAND OR 97224 5PCT $ 1.63 B 04/02/96 96- 277867
Phone #: 503 -624 -6300
Contractor:
DELTA FIRE, INC
14795 SW 72ND AVENUE
TIGARD OR 97224
Phone #: 620 -4020 $ 47.13 TOTAL
Reg #.. : 64174
REQUIRED INSPECTIONS
This permit is issued subject to the regulations contained in the Sprinkler F i n a l
Tigard Municipal Code, State of Ore. Specialty Codes and all other Mi sc. Inspection
applicable laws. All work will be done in accordance with Final Inspection
approved plans. This permit will expire if work is not started
within 180 days of issuance, or if work is suspended for more
than 180 days.
Permittee Si ature: 4?,41. 4v, , A
Issued By: 40 1 / `'�� Ill
Call for inspection — 639 -4175
T ; P E. -5 -`l - � a
•
`1 PLANCK# 4 35 Date: 4 Jz " (ib
APPLICATION FOR PERMIT TO INSTALL FIRE SUPPRESSION SYSTEM
BUILDING DIVISION, CITY OF TIGARD
639 -4171
(�, Q �l�
DATE: I �c � gee PERMIT # U 1 I l0 - o t -7 (
Valuation: &OQ2 OD
Amt. Paid: i - 7 13 Permit Fee: 3g. 50
40% Plan Check Fee: ] 30
Balance Due: L--E=_ 5% State Tax: /, 6 3
Plans must be submitted to the Building Division before installation. Thr sets of the plot
plan, showing the layout and the location of the nearest hydrant is required.
New Installation: Addition: K. Repair: Alteration: K -
Complete: Partial: Exitway: Basement: Hood & Vent:
Spray Booth: IN EXISTING BUILDING: )( IN NEW BUILDING:
NUMBER & STREET: (0160 51x Redwood L//•
NAME OF BUILDING or BUSINESS: P2.ehiJ? rf4"D - /rne 8 u»a'er j- 3
•
NO. OF STORIES: SIZE OF BUILDING: OCCUPIED AS:
TYPE OF SYSTEMS: Wet: Dry: Combination:
STANDPIPES: OCC.HAZARD: Light ORD.GRP.HAZARD 1 2 3 4
DENSITY GPM/Ft2 DESIGN AREA ft2 SPRINKLER AREA ft2
SPRINKLER ORIFICE SIZE: l ig II "K" FACTOR ; . tL2 TEMP. RATING l (05
OWNER:Pa frt. /6 " I $ I) I la- ADDRESS:
CONTRACTOR: k L 6 real d PLANS DRAWN BY: D( I ?7 Fre I nC, ADDRESS: 1 1185 5[14 ` � 2)1 a f 1 L t PA
REMARKS:
APPROVED permits includes only work described above and/or on plans and specification bearing the same
permit number and will comply with all applicable codes and ordinances of the 40
City of Tigard.
SPRINKLER SPRINKLER COMPANY: Dd+k Pre I I IC, PHONE: t ty OO — 9-0
SIGNATURE OF APPLICANT: JJJ(
BUILDING DIVISION:
PERMIT VALID FOR 180 DAYS
h; !ogin\dstAJireperm
05/26/2000 Activities for Case #: BUP96 -00171
•
1:21:09 PM
Assigned Hold Updated '
Activity Description Date 1 Date 2 Date 3 To Done By Disp. Level By Updated Notes
BUPC007 Application received 04/02/1996 MAI RECD BON 04/05/1996
BUPC008 Permit created 04/05/1996 B PEND BON 04/05/1996
BUPC015 Plans routed to Plans Examiner 04 /05/1996 B PEND BON 04/05/1996
BUPCO24 Plans Approved /Routed to DSTs 04/09/1996 JHF APPR JHF 04/10/1996
BUPC799 Final Inspection 04/18/1996 TLP PASS TLP 04/24/1996
BUPC090 (F) Ready to issue 04/15/1996 B PASS BON 04/15/1996
BUPC100 (F) Issue permit 04/15/1996 B PASS BON 04/15/1996
BUPC960 Case Fineled 04/18/1996 TLP PASS TLP 04/24/1996
•
Page 1 of 1
— fx gr.91j C...-
CITY OF TIGARD BUILDING INSPECTION Nwir
Inspection Line: 639 -4175 Business Phone: 6 s
J
Footing Rain Drain Cover /Service FINAL:
Foundation Water Line Ceiling - Plumb.
Post/Beam Mech. Shear /Sheath Framing -Mech.
' PIbg.Und /Flr /Slab Plbg. Top Out Insulation - Elect.
Post/Beam Struct. Mech. Rough -in Gyp. Bd. -Bldg.
San. Sewer Gas Line Appr /Sdwlk Reins.
�f
.
Other: 1/
Date: A. i
P.M. Entry:
Address: • • Z � a L • _�. . 1�e� ..m Ak
Tenant: �C,C.I �r - .) 39 _.1A �
0 St: • � B MST: � /A/'�i
fct
Con /Own: r
2 2-C 4O 2C) MEC: 7
PLM:
ELC:
THE FOLLOWING CORRECTIONS ARE REQUIRED: ELR:
.
,W, ,„ a 1 -/Arg i
9 aZ7/
94-017/ 5,0e/4/4/I', ,vQ
r C (Lc 0.
Inspector: Date: 7
PROVED DISAPPROVED /CALL FOR REIN CF O