Correspondence January 8, 1997 Mr. Robert,Poskins, CBO Plans Examiner City of Tigard 13125 S.W. Hall Blvd. Tigard. Oregon 97223 Project: Portland Clinic Tenant Space Subject: Plan Review Response BUP# 96 -0625 Dear Robert, Please find listed below responses to your review comments dated December 17, 1996. Note that a number of issues have been addressed in the core and shell drawings associated with this project. I have indicated this in my replies. ENERGY COMPLIANCE 1. See attached forms as submitted by project Electrical Contractor. ACCESSIBILITY 1. Required exits as noted on table 10 -A, and illustrated on the drawings do provide accessible means of egress. 2. . Specified hardware for the doors meets accessibility requirements. 3. All wall mounted thermostats and light switches will be located not more than 44" above finish floor. FIRE AND LIFE SAFETY M A H L U M & N O R D F O R S 1. Hail 204, grid lines 3 -6 are to be constructed as a rated corridor per the core and shell SMITH drawings BUP# 96-0566. GORDON Architects PC 2. Area of rescue assistance has been identified within the stairwells as noted per the core SO SW and shell drawings BUP#96 -0566. Second Avenue Suite 600 3. A key box will be provided and will be issued as an addendum to the shell permit Portland. OR drawings. 4. Illuminated exit signs will be installed prior to final inspection of the tenant suite . 5. Five (5) fire extinguisher cabinets are located on the first floor and one (1) on the second floor. They are illustrated as FEC, and are located with travel distances of 75' or less. • 503 224 4032 503 224 0918 F Mr. Robert Poskins, CBO City of Tigard Portland Clinic Tenant Space Plan Review Response BUP# 96 -0625 January 8, 1997 Page 2 6. Signage stating "No storage permitted in this exit area will be installed in the required exit corridors. 7. The General Contractor, Andersen Construction, will submit evidence of elevator permits prior to requesting final inspection and occupancy of the building. 8. Addendum 3, detail of recessed equipment at 1 hour walls, copy attached, has been submitted to the general contractor. MECHANICAL/FIRE SPRINKLER 1. Mechanical and fire sprinkler plans and applications will be submitted by the appropriate subcontractors. Bob, I hope this meets with your approval, please contact me if I can offer further clarification. Si c- el , • athie C. -cob - Project an • 1 e MCJ /kmo end: 1 cc: Ken Zinsli, Providence Medical System Dave Williams, Group Mackenzie Joe Dinsdale, Andersen Construction 96215.00 L001.MCJ • %9�encd December 17, 1996 CITY OF TIGARD Mahlum & Nordfors, Smith, Gordon 50 S.W. Second Avenue, #600 OREGON Portland, OR 97204 RE: Tenant Improvement Building Plan Review 6640 Redwood PC #: 12 -15c BUP #: 96-0625 Type of Construction: 2N Group: "B" Stories: 3 Occupant Load for Proposed: 265 Submittal documents for the above referenced project have been reviewed for conformance with the applicable 1996 Oregon Specialty Codes and other applicable codes and standards. The following comments are noted: u 1 Provide lighting Forms 5a, b, and c, Oregon Non-Residential Energy Code. '� l ACCESSIBIL4T,1( w, '`'..', A ll required exits shall be constructed providing accessible means of in the egress � P 9 same number as required for exits by Chapter 10, Table 10-A for persons with disabilities. 0, All doors with controls and hardware shall be of the type providing accessibility to persons with disabilities [Section 1109.3]. Hardware on doors shall be lever or other shape not requiring tight grasping, pinching, or twisting to operate. Controls shall require a force no greater than 5 pounds —force to activate [Section 1109.3]. . The environmental control (thermostat) and lighting controls shall not be located more than 54° above finish floor for accessible side reach approach or 44° for forward approach [Section 1109.2.3.6]. 10#61 0 4i 1. It appears that in lieu of rated corridors (Drawing A2.1), you are exercising Exception #8, OSSC, 1005.7. However, Drawing A2.2 indicates the construction 01 of a one -hour corridor. This situation does not comply with 1003.5, exits through A 6 adjoining rooms. In order to comply, Hall 204, Line 3 -6, all doors within, the Pe Q` #' lobby, stairs, and lower lobby must be constructed as a corridor. 2. Depending on your approach to #1 above, keep in mind the requirement for areas of rescue assistance. i - 13125 SW Hall Blvd., Tigard, OR 97223 (503) 639 -4171 TDD (503) 684 -2772 0 Tenant Improvement Building Plan Review PC #: 12 -15c BUP #: 96 -0625 Page #2 3. Provide a key box (knox) mounted to the exterior wall 10' above finish grade and M , adj. conta to e gain acent necessa the ry a cc e ss right side as of r the main by the entry Fire door Chief The (U FC 902 shall .4]. If in you ke hav F . any questions regarding this matter, please contact the Fire Marshal at 526- 2502. 6 Clearly indicate all required exits, except the main entrance, with illuminated exit signs. [Section 1013]. 01 l Provide Type 2 -A fire extinguishers throughout so that the travel distance to a unit does not exceed 75 feet [NFPA 10 3.2.1]. O Post signage in the corridor. No Storage Permitted in this Exit Area °. A permit issued by the State of Oregon, Building Codes Division, is required for N et installation and operation of an elevator. Provide evidence of application for � b x a permits. All cabinets recessed into fire -rated wall assemblies, such as for portable fire c' extinguishers, shall be fire - blocked at top and bottom and have an additional layer of 518 GWB, Type X between the back of the cabinet and the - opposing �i " GWB. Provide a detail in the revised plans. Sr° I:: : 1 44 wtiii'w =Ti14 e.44m1%ivi 1 1. Provide separate mechanical and fire sprinkler plans and appropriate applications. Please submit three copies of revised submittal documents and a letter indicating your response to the above comments for review. Please call me at (503) 639 -4171 if you have any questions. Sincerely, , , i f • -6 ii(, Ro , ert Poskin, CBO P , NS EXAMINER • TAP P96_062SPC12- 15C.DOC