Loading...
Plans p g 0- oo5 . Fa, FROELICH CONSULTING 969 SW Hamptdn Street CENTRAL OREGON EN GINEERS e Loop, Suite 101 ,INC 503.624-7005/503.624-9770 FAX 541 383-1828/541.383 -7696 FAX STRUCTURAL OBSERVATION REPORT Date: March 29, 2001 Project name: Kell Residence 12010 SW Queen Elizabeth St. RECCEN D Portland, OR 97224 Weather: Sunny, 60 F APR ®G Z ® ®1 FCE Project #: 01 -T050 COMMUNITY DEVELOPMENT BLDG #BUP96 -0503 To: Mike Kell From: Timothy T. Terich, P. Froelich Consulting Engineers was contacted to investigate the as -built capacity of the enclosed patio area roof. It is our understanding that the patio was to be enclosed under permit # #BUP96- 0503. The work was inspected and completed, however a final inspection was never performed. Five years later, the new owner was made aware of the un- inspected items. FCE was contacted to verify the capacity of the installed 6x12 beam supporting the added roof. A Existing 6x12 beam ff ,- sr , ' over west window ,...il...,„;:iri., tt 1 New addition (1996) '(� .' lJ �: t,1 a� • rS .. b Attached a structu calcula fo r the beam. the beam is sufficient to carry 1998 OSSC roof wind and snow loading. :nit 'fl : , Existing double 6x6 I . Existing 6x12 beam x ' °, 4 ` \\ SERVER\ ENGINEERING \01Jobs \01- t050 \032901.doc Page 1 of 2 The west end of the 6x12 is supported by a header over a new window. The sheetrock was removed from this area to visually verify the header size. Two 6x6 headers stack on top of each other support the 6x12. This header is sufficient to carry the 6x12 load. Structural Observation by: Timothy T. Terich, P.E. 7 (Z9/a/ PR UR _ \lt I N 51411 $ " LP k 4 OREGON S& 22. \ V` Oh V T.NI - EXPIRES 06 -30-02 \\ SERVER\ ENGINEERING \01 Jobs \01 t050 \032901.doc Page 2 of 2 L in 6969 SW Hampt Street CLIENT ' V ` 1 1,41;m,- ��_ .--.�. , PAGE 1 / 4 • �j Tiga Ore t9 r! �l�l fcetigrd @teleport.com PROJECT: tROtuch FA X.503.624.9770 ... -- - - — - -- __ - - -- PROJECT -- - _ `!�`^� tom . _ .— 503.624.7005 ❑ 431 SW Scaleh Loop • Suite 101 PROJECT NUMBER: ®1 " dim CONSULTING Bend. Oregon 97 704 ENGINEERS,II L 5383.828 696 om DATE: Si.f(®j ■ BY: .. ..... T G.-1 ✓ G4 4-c-t 1"...-7 e9G E i S^T c nl 4 6. - / Z. 1 • 4 ik " 4111111111 1 'dc+r.�' (s1 4.2"...'.........'..' wk+ Z u r . :„ .-- ,_ oae 4.-C--r-isteta e.-darn-Z.- 4 ( 9-n ^( 47 (p /2 t0 t� ' 1.. Z4' - - - - - - -- — Roof Beamf - 97 - UBC NDS) - - - -- By: Tim Terich , Froelich Consulting Engineers on: 03 -13 -2001 Protect: KELL - Location: existing 6x12 Summary: /\ 5.50 IN x 11.50 IN x 23.0 FT / Dense #1 - DOUGLAS FIR -LARCH - Dry Use Section Adequate By: 7.2% Controlling Factor: Section Modulus / Depth Required 11.10 In Deflections: Dead Load: DLD= 0.44 IN Live Load: LLD= 0.86 IN = U320 Total Load: TLD= 1.30 IN = U212 Reactions (Each End): Live Load: RL= 1869 LB Dead Load: RD= 947 LB Total Load: RT= 2816 LB Bearing Length Reqd.: BL= 0.70 IN Beam Data: Span: L= 23.0 FT Maximum Unbraced Span: Lu= 23.0 FT Pitch Of Roof: RP= 3.00 : 12 Live Load Deflect. Criteria: U 240 Total Load Deflect. Criteria: U 180 Beam Loading: Live Load: LL= 25 PSF Side One: Roof Dead Load: DL1= 10 PSF Roof Rafter Tributary Width: TW1= 2.0 FT Side Two: Roof Dead Load: DL2= 10 PSF Roof Rafter Tributary Width: TW2= 4.5 FT Roof Duration Factor: Cd= 1.15 Slope Adjusted Lengths and Loads: Adjusted Beam Length: Ladi= 23.0 FT Beam Live Load W/ Slope Red'n: wL= 163 PLF Beam Self Weight: BSW= 15 PLF Beam Total Dead Load: wD= 82 PLF Total Maximum Load: wT= 245 PLF Controlling Total Design Load: wTcont= 245 PLF Properties For: Dense #1- DOUGLAS FIR -LARCH Bending Stress: Fb= 1550 PSI Shear Stress: Fv= 85 PSI Modulus of Elasticity: E= 1700000 PSI Stress Perpendicular to Grain: Fc_perp= 730 PSI Adjusted Properties: Fb' (Tension): Fb'= 1719 PSI Adjustment Factors: Cd =1.15 CI =0.96 Cf =1.00 Fv': Fv'= 98 PSI Adjustment Factors: Cd =1.15 Design Requirements: Maximum Moment: M= 16192 FT -LB Shear ((a7 d from beam end): V= 2581 LB Comparisons With Required Sections: Section Modulus: Sreq= 113.1 N3 S= 121.2 N3 Area: Areq= 39.7 N2 A= 63.2 N2 Moment of Inertia: lreq= 591.5 N4 I= 697.0 N4 ftt .— o- f._ - 74 .0% i l ia, . , - 16325 S.W. BOONES Ml V ROAD Job # LAKE OSWEGO. ORES• JN 97616 By ., • . PROJECT y SD31636 0786 (�w. I�, _ Date__ /___/ Component weights Range Actual Remarks ERIN membrane i 1.5 PSFI H 5 -ply built up roofing ' 2.5 PSFI W Tapered styrofoam instil. .25 PSF /INI • Rigid insulation 1.5 PSF /INI Closed call insulation .5 PSF/IN I co z Asphalt shingles 2 PSF 2 H o Shake shingles light -heavy I 1.5 -3 PSF ¢ Cement tile I 11 PSFI Ballast c -10 PSFI I Plywood 3 PSF /INI l.4; Metal deck I 1.5 -3 PSFI U o i • I I • . I • Q Wood roof trusses -I 3 -5 PSF ?> Steel bar joists I 2.5 -4 PSFI u Timber rafters (1.6-3.2 PSFI 1- I I N m T - grid plus tiles I 2 PSF o w SheOtrock (1/2 ") 2. PSF Z J Wood ceiling joists I 1 PSF • w -Resilient furring channels 0.7 PSF • u H _Sprinkler system ' .5 -1.5 PSF HVAC ductwork . lights .5 -2.5 PSF i Batt or blow - in insulation j .5 PSF /IN /.5i ' , u� _ TOTAL /0 USE /0 p$ L . I -- — Multi= Loaded - Beam( - 97 UBf v4052746 -- By: Tim Terich , Froelich Consulting Engineers on: 04 -02 -2001 Proiect: KELL - Location: (2) 6X6 HEADER Summary: (2 ) 5.50 IN x 7.50 IN x 4.0 FT / #2 - DOUGLAS FIR -LARCH - Dry Use Section Adequate By: 142.2% Controlling Factor: Section Modulus / Depth Required 4.82 In Deflections: Dead Load: DLD= 0.00 IN Live Load: LLD= 0.01 IN = U5604 Total Load: TLD= 0.01 IN = L/3654 End Reactions(Left Side): Live Load: RL1= 935 LB Dead Load: RD1= 514 LB Total Load: RT1= 1448 LB End Reactions(Right Side): Live Load: RL2= 935 LB Dead Load: RD2= 514 LB Total Load: RT2= 1448 LB Bearing Length Regd.(Left) : BL1= 0.21 IN Bearing Length Reqd.(Right): BL2= 0.21 IN Beam Data: Span: L= 4.0 FT Maximum Unbraced Span: Lu= 2.0 FT Live Load Duration Factor: Cd= 1.15 Live Load Deflect. Criteria: U 360 Total Load Deflect. Criteria: U 240 Uniform Load: Live Load: wL= 0 PLF Dead Load: wD= 0 PLF Beam Self Weight: BSW= 20 PLF Total Load: wT= 20 PLF Concentrated Load P1: Live Load: PL1= 1869 LB Dead Load: PD1= 947 LB Total Load: PT1= 2816 LB Location: X1= 2.0 FT Properties For: #2- DOUGLAS FIR -LARCH Bending Stress: Fb= 700 PSI Shear Stress: Fv= 85 PSI j Modulus of Elasticity: E= 1300000 PSI Stress Perpendicular to Grain: Fc_perp= 625 PSI Adjusted Properties: Fb' (Tension): Fb'= 805 PSI Adjustment Factors: Cd =1.15 CI =1.00 Cf =1.00 Fv': Fv'= 98 PSI Adjustment Factors: Cd =1.15 Design Requirements: Maximum Moment: M= 2856 FT -LB 2.0 FT From Left Support Shear (A d from beam end): V= 1436 LB Comparisons With Required Sections: Section Modulus: Sreq= 42.6 N3 S= 103.1 N3 Area: Area= 22.1 N2 A= 82.5 N2 Moment of Inertia: Ireq= 25.4 N4 1= 386.7 N4 L