Loading...
Permit CITY OF TIGARD BUILDING PERMIT s COMMUNITY DEVELOPMENT Permit #: BUP2012 -00021 T t G A R D 13125 SW Hall Blvd., Tigard OR 97223 503.718.2439 Date Issued: 04/18/2012 Parcel: 25101 DA00104 Jurisdiction: TIGARD Site address: 13333 SW 68TH PKWY Project: Clear Channel Radio Subdivision: VARNS ACRES Lot: 9 Project Description: TI: 3rd and 4th floor offices and radio broadcast facilities. Scope includes back -up generator, fenced parking and roof - mounted equipment. Contractor: SD DEACON CORP OF OREGON Owner: TRIANGLE POINTE LLC 901 NE GLISAN ST SUITE 100 901 NE GLISAN ST, #100 PORTLAND, OR 97232 PORTLAND, OR 97232 PHONE: 503 - 297 -8791 PHONE: FAX: 503 - 297 -8997 FEES Specifics: Description Date Amount Type of Use: COM Permit Fee - Additions, Alterations, 01/27/2012 $5,965.15 Class of Work: ALT Demolition Dwelling Units: 0 12% State Surcharge - Building 04 /18/2012 $715.82 Stories: 4 Height: 0 ft Plan Review 01/27/2012 $3,877.35 Bedrooms: 0 Bathrooms: 0 Plan Review - Fire Life Safety 01/27/2012 $2,386.06 Value: $980,000 DC Provision Review, COM TI - Ping 04/18/2012 $256.00 DC Provision Review, COM TI - LRP 04/18/2012 $38.00 Info Process /Archiving - Lg $2.00 (over 04/18/2012 $104.00 Floor Areas: 11x17) Info Process /Archiving - Sm $0.50 (up to 04/18/2012 $53.50 Total Area: 0 11x17) Accessory Struct: 0 Metro Const. Excise Tax - Commercial 04 /18/2012 $1,176.00 Basement: 0 Use Carport: 0 Covered Porch: 0 Deck: 0 Garage: 0 Mezzanine: 0 Total $14,571.88 Required: Required Items and Reports (Conditions) Fire Sprinkler: Yes Parapet: Fire Alarm: Yes Protected Corridors: Smoke Detectors: Yes Manual Pull Stations: Accessible Parking: 0 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days • issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility No 'on Center. Those rules are set forth in OAR 952- 001 -0010 through OAR 952- 001 -0090. You may obtain a copy •r the •ul- • • irect questions to OUNC by cal 13.232.1987 or 1.800.332.2344. Issued By: emit Signature: I J E •, Call 50 jetitt.y 7:00 a.m. for the next available Inspee on date. This permit card shall be kept in a conspicuous place on the Job site until co pietion of e project Approved plans are required on the Job site at the time of each ins. • - . Building Permit Application 8 Commercial FOR OFFICE USE ONLY City of Tigard RE cE / V Efl Received pe rmit No.. / — g Date /B : 1 � .�1 .� ° 13125 SW Hall Blvd., Tigard, OR 972 ht Plan Review )V °, Phone: 503.718.2439 Fax: 503.598..9 2012 D : �` '� � Other Permit: , I ,{ � (� T I G A RD Inspection Line: 503.639.4175 �/ Date Rea. 1 El See Page " for Internet: www.tigard-or.gov �' I I QF j''/� Notifie- e y i • , Figi, Supplemental Information TYPE OF WORK REQUIRED DATA: 1- AND 2- FAMILY DWELLING ❑ New construction ❑ Demolition Permit fees* are based on the value of the work performed. Indicate the value (rounded to the nearest dollar) of all ® Addition/alteration/replacement ❑ Other: equipment, materials, labor, overhead, and the profit for the CATEGORY OF CONSTRUCTION work indicated on this application ❑ 1- and 2- family dwelling Valuation: $ ® Commercial /industrial ❑ Accessory building ❑ Multi - family Number of bedrooms: / ❑ Master builder ❑ Other: Number of bathrooms: JOB SITE INFORMATION AND LOCATION Total number of floors: Job site address: 13333 SW 68 Parkway New dwelling area: square feet City /State /ZIP: Portland, OR 97223 Garage/carport area: square feet Suite/bldg. /apt. no.: 300/420 Project name: Clear Channel Radio Covered porch area: square feet Cross street/directions to job site: at intersection of 1 -5 & 217 Deck area: square feet From 217, exit onto SW 72 Ave - north, turn right onto SW Hampton St., then Other structure area: square feet turn right on SW 68'" Parkway, turn right into parking lot at 13333 SW 68 Pkwy REQUIRED DATA: COMMERCIAL -USE CHECKLIST Subdivision: I Lot no.: 00104 Permit fees* are based on the value of the work performed. Tax map /parcel no.: Map2S101DA/Lot 00104 Indicate the value (rounded to the nearest dollar) of all equipment, materials, labor, overhead, and the profit for the DESCRIPTION OF WORK work indicated on this application. Interior tenant improvements on 3 & 4'" floors for offices and radio broadcast Valuation: $980,000.00 facilities. Related exterior scope includes new fenced back -up generator; Existing building area: I 07 y 01 $ square feet fenced secured parking; roof - mounted dishes, antennas & mech units New building area: 0 square feet ❑ PROPERTY OWNER N TENANT Number of stories: 5 Name: Clear Channel Radio Type of construction: 1B Address: 2625 South Memorial Drive Occupancy groups: City /State /ZIP: Tulsa, OK 74129 Existing: B g� Phone: ( ) Fax: ( ) New: B ® APPLICANT N CONTACT PERSON BUILDING PERMIT FEES* (Please refer to fee schedule) Business name: Luc ett- &- FaFley —�,. _ Structural plan review fee (or deposit): Contact name: Michael Mazeika, ALA Address: 737 South Third Street FLS plan review fee (if applicable): City /State /ZIP: Louisville, KY 40202 Total fees due upon application: 0(, 15-41. &I I Amount received: Phone: (502) 585 -4181 Fax: : (502) 587 -0488 E -mail: MMazeika @luckett- farley.com PHOTOVOLTAIC SOLAR PANEL SYSTEM FEES* CONTRACTOR • Commercial and residential prescriptive installation of roof -top mounted PhotoVoltaic Solar Panel System. Business name: to be determined 5 0 , p.. Submit two (2) sets of roof plan with connection details q and fire department access, along with the 2010 Oregon Address: / 0 ` N ,1. G' l dkbA.A1 S .- c - . Solar Installation Specialty Code checklist. City /State /ZIP: 1� ur oiL 91 L3 L Permit fee (includes plan review $180.00 `7 and administrative fees): Phone: ( ) Z.. g7 _ ^ ` , I Fax (� ?) 2_93 - �q s t State surcharge (12% of permit fee): $21.60 CCB lic.: `4 Pi Total fee due upon application: $201.60 Authorized signatur✓ T his permit application expires if a permit is not obtained within 180 days after it has been accepted as complete. Print name: Michael Mazeika Date: X2 VA • Fee methodology set by Tri -County Building Industry Service Board. I: \Building\Permits\BUP -COM PermitApp.doc 02/24/2011 440- 4613T(l 1 /02 /COM/WEB) 1 1 11 1 e ° Building Division Development Code Provision Review TIGARD Commercial Projects with Approved Land Use Building Permit No.: 814 X Land Use Casefile No.: P101 10J0 (1 l r Routed Plans: Submittal Date: I //-7/J. e •T Submittal Date: Submittal Date: To the Applicant: Each review type must be approved. If the plan is not approved, please revise and resubmit three (3) copies to the Building Division. Only checked ( items are approved. Items not approved and those listed in the notes must be revised prior to re- submittal. For questions please contact the appropriate staff person(s) listed above each section. STAFF: please only mark those items on the left side that are approved. / v Planning Review (contact h ' / r / at 503 - 718- or J 0 �I 7 @ti or. L9' Land Use Approval / —/ ❑ Building Plans Match Approved Plan: Yes L� No ❑ ❑ Maximum Building Height B'Conditions Met / , / ,J / d / ,(. Notes: E or Ge.te.uJ f,i ft1 1 T d'i ik A/lo (1t. coo do 1 041../". Original Plan: Approved Er Not Approved ❑ Date: 1 30-n. • Revision 1: Approved ❑ Not Approved ❑ Date: Revision 2: Approved ❑ Not Approved ❑ Date: Engineering Review con ct Mike White at 503 - 718 -2464 or MikeW @tigard - or.gov) ❑ Actual Slope: ❑ PFI Permit # -19 ❑ Conditions Met Notes: Original Plan: Approved Not Approved ❑ Date: / 3 ( //2- Revision 1: Approved ❑ Not Approved ❑ Date: Revision 2: Approved ❑ Not Approved ❑ Date: (Review Continues on Page 2) Page 1 of 2 This form is recognized by most Building Departments in the Tri- County area for transmitting information. Please complete this form when submitting information for plan review responses and revisions. This form and the information it provides helps the review process and response to your project. 11 q City of Tigard a Buildin g Division TIGARD TRANSMITTAL LETTER TO: �C DA _ �'�� WED DEPT: BUILDING DIVISION FEB 21 2012 CITY OF TIGA ^D FROM 5 • BUILDING DIVISION COMPANY t �,t, PHONE: -585-4// By: RE: (�j�� a O Cog Piscy P 60o� - ( Site Address) (Permit Number) (Project name or subdivisi n name and lot number) ATTACHED ARE THE FOLLOWING ITEMS: Copies: I Description: I Copies: Description: Additional set(s) of plans. Revisions: Cross section(s) and details. Wall bracing and/or lateral analysis. Floor /roof framing. Basement and retaining walls. Beam calculations. Engineer's calculations. Other (explain): REMARKS: _ j , • V • d 1 lt., FORpFFIcE USE ONLY � I Initials .` Routed to Permit Technician: Date: 2 2� 1'Z ;>.- Fees Due: ❑ Yes LJ'No Fee Description: Amount I ue: Special Instructions: Reprint Permit (per PE): ❑ Yes I ❑ N o ❑ Done Applicant Notified: Date: Initials: 1:\ Building \Forms \TransmittalLetter - Revisions.doc 02/08!2011 City borist Review (contact Todd Prager at 503- 718 -2700 or todd @tigard- or:gov) treet Trees LY Protected Trees Notes: No tt -...•' :1 ro �• I I Original Plan: Approved El Not Approved ❑ Date: 2 / /a. • Revision 1: Approved ❑ Not Approved ❑ Date: // Revision 2: Approved ❑ Not Approved U Date: .. • ' ' Permit Coordinator Review (contact Albert Shields at 503- 718 -2426 or albert @ tigard- or.gov) `'■ • ❑ Planning Okay to Issue Permit ❑ Arborist Okay to Issue Permit • . ❑ Engineering Okay to Issue Permit . . Notes: , • .Original Plan: Date Sent to Applicant: ' Revision 1: • • Date Sent to Applicant • • Revision 2: Date Sent to Applicant . Okay to Issue Permit:. Yes No Date Routed to Building l /01..._ • • . , Q `- i i ' o . `. a ,� v , • , , .r;.. . - 9 / ' • l ‘, . Page 1; ° of 2 I 4, - Z� Commercial Application Checklist City of Tigard REC EI VE ° 13125 SW Hall Blvd., Ti g ard, OR 97223 � Phone: 503.718.2439, Fax: 503.598.1960 JA NO 2012 r I G A R D Internet address: www.tigard - or.gov - CITY OF T. PRO.IECT INFORMATION Project name: Clear Channel Radio - Tenant Improvements Date: 1/23/2012 Address: 13333 SW 68 Parkway City: Portland State: OR ZIP: 97223 Scope of work: Interior tenant improvements, related mechanical, electrical & plumbing Reference no.: Map and tax -lot no.: 2S101 DA - 00104 Contact person name: Michael Mazeika Company: Luckett & Farley Phone: (502) 585 -4181 Fax: (502) 587 -0488 Cellular phone: (502) 744 -7232 E -mail: MMazeika ©luckett - farley.com NOTES AND INSTRUCTIONS • The purpose of this checklist is to help define a complete submittal package for the scope of work. Plan review will not take place until a complete package is submitted. • This checklist can be used for all commercial construction projects, including new construction, additions, alterations and tenant improvements. • For complex projects, applicants should use the "location" space to note the item's location and page number from the plans or the specification book. • It is not necessary to duplicate submittal information, even if it is asked for in multiple sections. • In the checklist, "Required" means that the applicant must provide this information for plan review. • In the checklist, "P" means — • if checked by the applicant — the information is provided for the plan review. • if checked by the plans reviewer — this information is required for the plan review. • In the checklist, "NA" means that the information does not apply. • Choose only those sections of the checklist that apply to your scope of work. Section 1.0, "General Project Data," must be included with each .roject submitted. PRE - SUBMITTAL PROCESS An applicant may request a pre - submittal meeting with representatives of the jurisdiction in which the project will be built. The meeting may take place during the conceptual, schematic, or in- progress phase, or when the applicant has completed plans. INDEX OF CHECKLIST SECTIONS 1.0 General project data Page 2 7.0 Mechanical data (Types I and II 2.0 Civil data Page 2 kitchen -hood permits) Page 6 3.0 Architectural data Page 3 8.0 Plumbing data Page 7 4.0 Structural data Page 4 9.0 Electrical data Page 8 5.0 Mechanical data (new construction, tenant 10.0 Fire - suppression data Page 9 improvement, gas - piping permits) Page 5 11.0 Fire - detection and fire -alarm data Page 9 6.0 Mechanical data (additional or replacement 12.0 Re -roof installation data Page 10 rooftop- equipment installation permits) Page 6 13.0 Jurisdictional requirements Page 10 This checklist is for building department jurisdictions in Clackamas, Multnomah, and Washington counties. 440 -2734 (8 /01/WEB /COM) 1: \Building \Forms \COM- Checklist.doc 01/24/12 SECTION 1.0 - GENERAL PROJECT DATA Construction documents Location (sheet number or spec section) 1.1 ® Required No. of sets of plans: New: 1 TI: 2 2 1.2 ® Required Cover sheet title block X 1.1 1.3 ® Required Cover sheet vicinity map X 1.1 1.4 ® Required Cover sheet plan index X 1.1 1.5 ® P ❑ NA Code summary X 1.1 1.6 ® P ❑ NA Deferred submittal summary X 1.1 1.7 ® P ❑ NA Professional stamp and signature 1.8 ® P ❑ NA Fire and life - safety plan LS1.3 & LS1.4 1.9 ❑ P ® NA Landscape plan 1.10 ❑ P ® NA Landscape specifications Supporting documents Notes 1.20 ❑ P ® NA Land -use or planning actions 1.21 ❑ P ❑ NA Required fire -flow calculations by Sprinkler Contractor 1.22 ❑ P ® NA Fire - hydrant flow -test report 1.23 ❑ P ® NA Fire department or fire district building survey report 1.24 ❑ P ® NA Material safety data sheets (MSDS) SECTION 2.0 - CIVIL DATA Construction documents Location (sheet number or spec section) 2.1 ® Required Site plan AS0.1 2.2 ® Required Site utility plan No change 2.3 ® Required Grading plan No change 2.4 ® Required Erosion - control plan No change 2.5 ❑ P ❑ NA Utility -vault location and details No change Supporting documents Notes 2.20 ❑ P ® NA Geotechnical /soil engineer report 2.21 ❑ P ® NA Storm -water calculations 2.22 ❑ P ® NA Site retaining -wall structural calculations 2.23 ❑ P ® NA "Assurance of Compliance" with environmental rules .... 440 - 2734 (8 /01/WEB /COM) Tri- County Commercial Application Checklist 2 For use in building department jurisdictions in Clackamas, Multnomah, and Washington Counties I: Bu ilding \Forms \CO M -C h e c k l i st. doc SECTION 3M — ARCHITECTURAL DATA Construction documents Location (sheet number or spec section) 3.1 ® Required Floor plan(s) A1.3 & A1.4 3.2 ® Required Transverse and longitudinal cross sections A4.1 3.3 ® Required OSSC Chapter 11 accessibility requirements No change in existing 3.4 ❑ P ® NA Interior elevations 3.5 ❑ P ® NA Exterior elevations 3.6 ® P ❑ NA Roof plans A1.5 3.7 ❑ P ® NA Exterior wall sections and details 3.8 ® P ❑ NA Reflected ceiling plan(s) A3.3 & A3.4 3.9 ❑ P ® NA Fire -rated construction details 3.10 ❑ P ® NA Energy code compliant construction details and specifications 3.11 ® P ❑ NA Door schedule A6.1 3.12 ® P ❑ NA Glazing schedule A6.1 3.13 ® P ❑ NA Furniture plan LS1.3 & LS1.4 Supporting documents Notes 3.20 ❑ P ® NA Energy code compliance forms /calculations 3.21 ❑ P ® NA Material safety data sheets (MSDS) 3.22 ❑ P ® NA Hazardous materials inventory statement (HMIS) 3.23 ❑ P ® NA Hazardous materials management plan (HMMP) 3.24 ❑ P ® NA Written fire and life - safety evacuation plan for area of rescue assistance 3.25 ❑ P ® NA Active and passive smoke - control information 440 - 2734 (8 /01/WEB /COM) Tri- County Commercial Application Checklist 3 For use in building department jurisdictions in Clackamas, Multnomah, and Washington Counties i:\Bu i Idi ng \F orms \COM- Checkl ist.doc SECTION 4.0 — STRUCTURAL DATA Construction documents Location (sheet number or spec section) 4.1 ® Required Structural cover sheet no change in bldg structure 4.2 ❑ P ® NA Foundation plan 4.3 ❑ P ® NA Under -slab mechanical plan 4.4 ❑ P ® NA Under -slab electrical plan 4.5 ❑ P ® NA Under -slab plumbing plan 4.6 ❑ P ® NA Floor framing plan 4.7 ❑ P ® NA Roof framing plan 4.8 ❑ P ® NA Structural elevations 4.9 ❑ P ® NA Structural details and cross sections 4.10 ❑ P ® NA Standpipe information 4.11 ❑ P ® NA Special inspector /structural observation matrix Supporting documents Notes 4.20 ❑ P ® NA Geotechnical /soil engineer report 4.21 ❑ P ® NA Site - specific seismic hazard report 4.22 ❑ P ® NA Design narrative separate attachment - caics / 4.23 ® P ❑ NA Structural calculations memo for equip loads 440 - 2734 (8 /01/WEB /COM) Tri- County Commercial Application Checklist 4 For use in building department jurisdictions in Clackamas, Multnomah, and Washington Counties 1:\B uilding \Fortes \COM -Check I ist.doc • • • • • SECTION 5.0 - MECHANICAL DATA (New construction, tenant improvement, has piping permits) Construction documents • Location (sheet number or spec section) 5.1 Z Required Floor plan M1.3, M1.4 5.2 (X) Required Equipment schedule M4.1 5.3 0 P Z NA Site plan 5.4 El P NA Under-slab mechanical plan 5.5 - P 0 NA - Roof-plan - - - M1.5 • 5.6 P NA 'Fuel gas piping plan 5.7 P 0 NA HVAC equipment and duct plan(s) M1.3 M1.4 . • 5.8 0 P (X) NA Roof access details existing • 5.9 0 P NA Duct smoke detector plans existing, see M3.1 5.10 0 P (X) NA Fire/smoke damper locations 5.11 D P (X) NA Smoke control plan 5.12 0 P [E] NA Outside air (OSA) table existing system, no change 5.13 D P (X) NA Refrigeration equipment and piping plan 5.14 D P IX) NA Kitchen equipment plan 5.15 D P IX) NA Type I and/or Type II kitchen hood plan • ' • (see Section 7.0 - Mechanical Data) 5.16 0 P NA Fume/vapor hood plan • 5.17 0 P Z NA Process piping/product and/or exhaust-conveying. duct plan 5.18 0 P Ej NA Fire-rated construction details • 5.19 (X) P 0 NA Equipment hanger/fastener details M1.4, M1.5 Supporting documents • Notes 5.20 Z Required Structural calculations for vertical loads and lateral loads for equipment weighing over 400 pounds no mech equip over 400 lbs 5.21 0 P 0 NA Equipment manufacturers' catalog "cut 'sheets" or' specifications 5.22 0 P 0 NA Outside air (OSA) calculation 5.23 0 P El NA Smoke-control calculations 5.24 0 P Z NA Combustion air calculations 5.25 P .0 NA Fuel gas piping sizing calculations 5.26 0 P 0 NA Make-up air calculations 5.27 (X) P 0 NA Energy code compliance forms separate attachment 5.28 0 P [X] NA Boiler information • 440 (8/01/WEB/COM) Tri-County Commercial Application Checklist 5 For use in building department jurisdictions in Clackamas, Multnomah, and Washington Counties , i:kBuilding\Forms\COM-Checklist.doc SECTION 6.0 — MECHANICAL DATA (Additional or replacement rooftop installation permits) Construction documents Location (sheet number or spec section) 6.1 ® Required Roof plan M1.5 6.2 El P ® NA Roof framing plan 6.3 ❑ P ® NA Fuel gas piping plan 6.4 ❑ P ® NA Roof access details Supporting documents Notes 6.20 ❑ Required Structural calculations for vertical loads and lateral loads for equipment weighing over 400 pounds no meth equip over 400 lbs 6.21 ❑ P El NA Equipment manufacturers' catalog "cut sheets" or specifications 6.22 ❑ P ® NA Fuel gas piping sizing calculations 6.23 ❑ P ❑ NA Energy code compliance forms separate attachment SECTION 7.0 — MECHANICAL DATA (Type I and Type II kitchen hood permits) Construction documents Location (sheet number or spec section) 7.1 ❑ Required Site plan 7.2 ❑ Required Floor plan(s) 7.3 ❑ Required Kitchen equipment plan 7.4 ❑ Required Kitchen equipment and hood elevations 7.5 ❑ P ® NA Roof plan 7.6 ❑ P ® NA Cross sections through hoods, ducts and shafts 7.7 ❑ P ® NA Fire -rated construction details 7.8 ❑ P ® NA Fire suppression details Supporting documents Notes 7.20 ❑ Required Structural calculations for vertical loads and lateral loads for equipment weighing over 400 pounds 7.21 ❑ Required Make -up air calculations 7.22 ❑ P ® NA Equipment manufacturers' catalog "cut sheets" or specifications 7.23 ❑ P ® NA Hood /grease extractor listing documentation 7.24 ❑ P ® NA Hood/grease duct sizing calculations 7.25 ❑ P ® NA Fire suppression information 440 -2734 (8 /01/WEB /COM) Tri- County Commercial Application Checklist 6 For use in building department jurisdictions in Clackamas, Multnomah, and Washington Counties I:\B u ild ing \Forms \COM- Checkl ist.doc SECTION 8.0 — PLUMBING DATA Construction documents Location (sheet number or spec section) 8.1 ® Required Floor plan(s) P3.1, P4.1 8.2 ® Required Piping and material schedule P5.1 8.3 ® Required Equipment layout plan P4.1 8.4 ® Required Fixture schedule P5.1 8.5 ❑ P ® NA Site utility plan 8.6 ❑ P ® NA Building cross section 8.7 ® P ❑ NA Rise diagram P6.1 8.8 ❑ P ® NA Roof plan 8.9 ❑ P ® NA Back flow prevention location 8.10 ❑ P ® NA Irrigation plan 8.11 ❑ P ® NA Fire -rated construction details 8.12 ❑ P ® NA Under -slab plumbing plan Supporting documents Notes 8.20 ❑ Required Structural calculations for vertical loads and lateral loads for equipment weighing over 400 pounds no plumb equip over 400 lbs 8.21 ❑ P Z NA Equipment manufacturers' catalog "cut sheets" or specifications 8.22 ❑ P ® NA Utility maintenance agreements 8.23 ❑ P ® NA Water supply calculations 8.24 ❑ P ® NA Sanitary system calculations 8.25 ❑ P ® NA Irrigation demand calculations 8.26 ❑ P ® NA Roof drain and storm water calculations • 440 -2734 (8 /01/WEB /COM) Tri -County Commercial Application Checklist 7 For use in building department jurisdictions in Clackamas, Multnomah, and Washington Counties i:\Building\Forms\COM-Checklist.doc SECTION 9.0 — ELECTRICAL DATA Construction documents Location(sheet number or spec section) • 9.1 ® Required No. of sets of'plan s: 2 E2.3, E2.4 • - 9.2 ,® Required Floor plan(s) E1.3, E1.4, E2.3, E2.4 • 9.3 ® Required Electrical load calculations E6.1 E6.2 9.4 ® Required One line diagram E4.1, E4.2 9.5 ® Required Feeder - riser diagram - E4.1, E4.2 9.6 ® Required Available fault current information 9.7 ® Required Panel schedule(s) E6.1 E6.2 9.8 ® P ❑ NA Site electrical plan ES.1 9.9 ❑ P ® NA Fire -rated construction details 9.10 ® P ❑ NA Lighting plan E1.3, E1.4 9.11 ® P ❑ NA Emergency power system and emergency lighting plan E4.1, E1.3, E1.4 9.12 ❑ P ® NA Under -slab electrical plan • Supporting documents Notes 9.20 ® Required Structural calculations for vertical loads and lateral loads for equipment weighing over 400 pounds _ - separate attachment • 9.21 ® P ❑ NA Energy code compliance forms and calculations for lighting separate attachment 9.22 ® P ❑ NA 'Emergency power system specifications separate attachment 9.23 ® P ❑ NA Feeder riser information E4.1 9.24 ® P ❑ NA Lighting equipment manufacturers' catalog • "cut sheets" or specifications EL.O • • • • 440 - 2734 (8 /01/WEB /COM) Tri- County Commercial Application Checklist 8 For use in building department jurisdictions in Clackamas, Multnomah, and Washington Counties I: \Bu ilding \Fortes \COM- Checkl ist.doc • SECTION 10.0 - FIRE SUPPRESSION DATA Construction documents Location (sheet number or spec section) 10.1 ® Required Floor plan(s) P3.1, P4.1 10.2 ® Required Sprinkler piping plan(s) to be submitted by contractor 10.3 ❑ P ® NA Site plan 10.4 ❑ P ❑ NA Standpipe information to be submitted by contractor 10.5 ❑ P ® NA Back - flow prevention information 10.6 ❑ P ® NA Reflected ceiling plan(s) 10.7 ❑ P ® NA Transverse and longitudinal cross sections 10.8 ❑ P ® NA Fire -rated construction details 10.9 ❑ P ❑ NA Specialty fire suppression system plans and list of systems to be submitted by contractor Supporting documents Notes 10.20 ® Required Structural calculations for vertical loads and lateral loads for equipment weighing over 400 pounds 10.21 ® Required Equipment manufacturers' catalog "cut sheets" 10.22 ❑ P ❑ NA Hydraulic calculations to be submitted by contractor 10.23 ❑ P ❑ NA Specialty fire suppression system information to be submitted by contractor SECTION 11.0 - FIRE DETECTION AND ALARM DATA Construction documents Location (sheet number or spec section) 11.1 ZRequired Floor plan(s) to be submitted by contractor . 11.2 ❑ P ® NA Site plan 11.3 ❑ P ® NA Reflected ceiling plan(s) • 11.4 ❑ P ® NA Transverse and longitudinal cross sections 11.5 ❑ P ❑ NA Wiring schematic to be submitted by contractor 11.6 ❑ P ® NA Elevator recall information 11.7 ❑ P ❑ NA Operational matrix to be submitted by contractor 11.8 ❑ P ® NA Fire -rated construction details • 11.9 ❑ P ® NA Standard electrical notes Supporting documents Notes 11.20 ® Required Structural calculations for vertical loads and lateral loads for equipment weighing over 400 pounds no equip over 400 lbs 11.21 ® Required Equipment manufacturers' catalog "cut sheets" 11.22 ® Required Installer certification information to be submitted by contractor 11.23 ❑ P ❑ NA Battery calculations to be submitted by contractor 11.24 El P El NA Sample fire alarm log book 11.25 ❑ P ❑ NA Emergency power system specifications 11.26 ❑ P ❑ NA Monitoring station information to be submitted by contractor 11.27 ❑ P ❑ NA Voltage drop calculations 440 - 2734 (8 /01/WEB /COM) Tri- County Commercial Application Checklist 9 For use in building department jurisdictions in Clackamas, Multnomah, and Washington Counties i:\Building\Forms \COM- Checkl ist.doc SECTION 12.0 — RE -ROOF INSTALLATION DATA • Construction documents Location'(sheet number or spec section) 12.1 ® Required Site plan or building location map Not Applicable 12.2 Required Occupancy classification 12.3 ® Required Type of construction 12.4 ® Required Minimum roof class required 12.5 - ET- Required Class of roofing to be 'installed" T - - - 12.6 ® Required • Roof plan • 12.7 ❑ P ❑" NA Parapet and scupper cross section(s) Supporting documents Notes 12.20 ® Required Pre -re -roof inspection report 12.21 ® Required Roofing system listing ,information 12.22 ® Required Roofing manufacturer's catalog "cut sheets" 12.23 ❑ P ❑ NA Structural calculations 12.25 ❑ P ❑ NA Structural engineer's report" SECTION 13.0 — JURISDICTIONAL – SPECIFIC REQUIREMENTS Construction documents Item Location (sheet number or spec section 13.1 ❑ P ❑ NA ❑ Required 13.2 ❑ P ❑ NA ❑ Required 13.3 ❑ P ❑ NA ❑ Required 13.4 ❑ P ❑ NA ❑ Required 13.5 ❑ P ❑ NA ❑ Required • 13.6 ❑ P 0 NA ❑ Required 13.7 ❑ P ❑: NA ❑ Required 13.8 ❑ P ❑ NA ❑ Required 13.9 ❑ P ❑ NA ❑ Required _ 13.10 ❑ P ❑ NA ❑ Required • • 440 - 2734 (8 /01/WEB /COM) Tri- County Commercial Application Checklist 10 For use in building department jurisdictions in Clackamas, Multnomah, and Washington Counties l:\ Building \Fortes \COM- Checklist.doc •