Inspection vie-;6 (3,5— k....„
CITY OF TIGARD BUILDING INSPECTION DIVISION
24 -Hour Inspection Line: 639 -4175 Business Phone: 639 -4171
g 7. 0 .c[3 9
Date Requested: I - - I3/7 A.M. P.M. Aks MST:
Location: / j 34 I f 2 & /')'1 7—je./l/L) BUP:
Tenant: Suite: C- ' Bldg: MEC:
Contractor: Phone: PLM:
Owner: Phone: ELC:
ELR:
SIT:
•
BUILDING BLD (con't PLUMBING MECHANICAL ELECTRICAL SITE
Site m "Post/Beam Post/Beam Cover /Service Sewer /Stone
Footing Roof UndFl/Slab Rough -In Ceiling Water Line
Slab Framing Top Out Gas Line Rough -In UG Sprinkler
Foundation Insulation Sewer Hood/Duct Reconnect Vault
Bsmt Damp Drywall Storm Furnace Temp Service MISC.
Masonry Ceiling Rain Drain A/C UG Slab
Shear /Sheath Fire Spklr /Alm Crawl/Found Dr Heat Pump Low Volt
pprov Approved e• . .rovrI. Approved Approved
Appr /Sdwlk o A. 'roved Not Approved Not AO .roved Not Approved Not Approved
_ , l `.L FINAL L j/ 1 \ . ' - 1,
FINAL i FINAL
ter. - I 2 _
_`
O Call for reinspection 0 Reinspection fee of $ 99 required before next inspection 0 Unable to inspect
Inspector: 4L/e Date: ) 2L-3 /' [ Page of