Loading...
Permit . CITY OF TIGARD SEWER CONNECTION PERMIT PERMIT #: SWR2000 -00062 ;•1 � DEVELOPMENT SERVICES DATE ISSUED: 04/14/2000 13125 SW Hall Blvd., Tigard, OR 97223 (503) 639 -4171 SITE ADDRESS; 08900 SW PIPPEN LN PARCEL: 2S111 DA -15200 SUBDIVISION: APPLEWOOD PARK NO. 3 ZONING: R -7 BLOCK: LOT: 145 JURISDICTION: TIG TENANT NAME: LEGEND HOMES . USA NO: FIXTURE UNITS: CLASS OF WORK: NEW DWELLING UNITS: 1 TYPE OF USE: SF NO. OF BUILDINGS: 1 INSTALL TYPE: LTPSWR IMPERV SURFACE: Remarks: Sewer connection for new SF • Owner: FEES Type By Date Amount Receipt PRMT BON 04/14/200C $2,300.00 0001427 INSP BON 04/14/200C $35.00 0001427 Phone: Total $2,335.00 Contractor: • Phone: Reg #: • • Required Inspections Sewer Inspection ORIGINAL • This Applicant agrees to comply with all the rules and regulations of the Unified Sewage Agency. The permit expires 180 days from the date issued. The total amount paid will be forfeited if the permit expires. The Agency does guarantee the accuracy of the side sewer laterals. If the sewer is not located at the measurement given, the installer shall prospect 3 feet in all directions from the distance given. If not so located, the installer shall purchase a "Tap and Side Sewer" Permit and the Agency will install a lateral. ATTENTION: Oregon law requires you to follow rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952 - 001 -0010 through OAR 952 - 001 -0080. You may obtain copies of these rules or direct questions to OUNC by calling (503) 246 -1987. _ ' // Issued by: L ( , t,. ' • at • Permittee Sig • ture: . Call (503) 639 -4175 by 7:00 P.M. for an inspection needed the next .,siness day CITY OF TIGARD BUILDING INSPECTION DIVISION MST 2Z ' e A 04'07 24 -Hour Inspection Line: 639 -4175 Business Line: 639 -4171 . a � �� �� BUP ✓ 1, 4 u Date Requested AM PM BLD c /� Location ? 900 gccl /,0��) v"i Suite MEC Contact Person G / p Ph 7 0 9 PLM Contractor Ph SWR ' 1.000 - "tOZo f Z® BUILDING Tenant/Owner ELC Retaining Wall ELR Footing Access: Foundation FPS Ft SGN ravel Drain Inspection Notes: SI b SIT Post & Beam Ext Sheath /Shear Int Sheath /Shear Framing Insulation Drywall Nailing Firewall Fire Sprinkler Fire Alarm Susp'd Ceiling Roof ' Misc: Fina PART FAIL • ' :1 t Post & Beam Under Slab Top Out ate' anita Se ain rai Final pAso PART FAIL MECHANICAL Post & Beam Rough In Gas Line Smoke Dampers Final PASS PART FAIL ELECTRICAL Service Rough In UG /Slab Low Voltage Fire Alarm Final PASS PART FAIL SITE Backfill /Grading Sanitary Sewer Storm Drain [ ] Reinspection fee of $ required before next inspection. Pay at City Hall, 13125 SW Hall Blvd Catch Basin [ ] Please call for reinspection RE: [ ] Unable to inspect - no access Fire Supply Line ADA 1 /2 roach /Sidewalk 6 D Inspector // /� Other Ext Final • PASS PART FAIL 0 NO REMOVE this inspection record from the job site.