Loading...
Electrical Construction Company ~ C110022 Contract# a� CITY OF TIGARD,OREGON A "`.s PUBLIC IMPROVEMENT CONTRACT—NON-PWR PROJECT SINGLE MODE FIBER OPTIC CABLING TO PUBLIC WORKS OFFICE THIS CONTRACT, made and entered into this 10th day of March, 2011, by and between the City of Tigard, a municipal corporation of the State of Oregon, hereinafter called "City," and Electrical Construction Company,hereinafter called"Contractor,"duly authorized to perform such services in Oregon. RECITALS WHEREAS,the City requires services which Contractor is capable of providing,under terms and conditions hereinafter described;and WHEREAS,time is of the essence in this contract and all work under this contract shall be completed within the tune period stated in the Scope of Work; THEREFORE,in consideration of the promises and covenants contained herein,the parties hereby agree as follows: TERMS OF AGREEMENT L Services Contractor's services under this Agreement shall consist of single mode fiber optic cabling to Public Works Office as detailed in Exhibit A,"Scope of Work." 2. Prevailing Wage While the City and Contractor enter into this Agreement with the understanding that the work to be completed does not initially exceed $50,000 and therefore does not initially require the provisions of ORS Chapters 2791 . and 279C or other Oregon and Federal provisions pertaining to minimum salaries and wages, the said provisions are incorporated herein by reference as if fully set forth in the event the contract is amended to exceed$50,000 at any point. The Contractor agrees that,in the event the contract ever exceeds$50,000, the workmen in each trade or occupation required for the work to be done pursuant to the contract, employed in the performance of the Contract, either by the Contractor or Subcontractor or other person doing or contracting to do any part of the work contemplated by the Contractor shall be paid not less than the prevailing,minimum hourly rate of wage specified by the Commissioner of the Bureau of Labor. This includes any requited back pay for work done while the contract was under$50,000. Once the project exceeds the$50,000 threshold, all employees shall be entitled to back pay equal to or greater than the wages required under BOLI laws. If the contract reaches $50,000 or greater through change orders, the City shall pay a fee equal to one- tenth of one percent(.001) of the price of the contract to the Bureau of Labor and Industries. The fee shall be paid on or before the first progress payment or 60 days from the date work first began on the contract,whichever comes first. The fee is payable to the Bureau of Labor and Industries and shall be mailed or otherwise delivered to the Bureau at the following address: Bureau of Labor and Industi ies Wage and Hour Division Prevailing Wage Unit 800 NE Oregon Street,# 32 Portland,Oregon 97232 Also in the event the contract reaches $50,000 through change orders or amendments, the Contractor shall provide proof to the City that the Contractor has filed a public works bond with a corporate surety in the amount of $30,000 with the Construction Contractors Board as required under Oregon PWR law. House Bill 2021 enacted during the 2007 Assembly of the Oregon Legislature makes a public agency liable for any wages, fringe benefits, and liquidated damages unpaid to workers as a result of the public agency failing to include information about prevailing wage rates in the specifications for public contracts. This law was effective January 1, 2008. 3. Contract Documents The Contractor is hereby bound to comply with any and all requirements of this agreement, including, but not limited to Exhibit A, Scope of Work. The Scope of Work, by this reference, is made a part hereof with the same legal force and effect as if set forth herein in full. 4. City's Representative For purposes hereof, the City's authorized representative will be the Nick Nissen,Facilities Supervisor who is available by email at nga ti rd-orgov or by phone at(503)718-2605. 5. Contractor's Representative For purpose hereof, the Contractor's authorized representative will be Electrical Construction Company who is available by email at GARYC@e-c-co.com or by phone at(503) 224-3511. 6. Contractor Identification Contractor shall furnish to the City the Contractor's employer identification number,as designated by the Internal Revenue Service,or Contractor's social security number,as City deems applicable. 7. Compensation City agrees to compensate Contractor for goods or services supplied,including any applicable shipping and handling charges, as described in Exhibit A, Scope of Work. City shall not be responsible for payment of any materials,services,expense,or costs other than those which are specifically included in Exhibit A. Compensation over the life of this Contract is not to exceed Eight thousand seven hundred ninety dollars ($8,79_001. Payment may made with purchase card based on Contractor's invoice, subject to the approval of the Contract Manager or appropriate City representative,and not more frequently than monthly. Payment shall be made only for work actually completed as of date of invoice. Payment terms shall be net 30 days from date of invoice or payment processed with purchase card. Payment by the City shall release the City from any further obligation for payment to Contractor for . services performed or expenses incurred. Payment of installments shall not be considered acceptance or approval of any work or waiver of any defects therein. City certifies that sufficient funds are available and authorized for expenditure to finance costs of this contract. In the event the contract ever reaches $50,000, the Contractor shall include proof of payment to any and all subcontractors and suppliers with each statement submitted to the City. The initial statement at that junction must also contain proof of paid back wages. The City shall retain the right to withhold payments if required proof of payment to subcontractor and suppliers is not included with a statement in this event. Also, as required under State of Oregon Prevailing Wage Rate (PWR) Law, the City Page 2 shall withhold 25%of any progress payment amounts owed to Contractor if Contractor has failed to file certified payrolls sheets with the City in the event the contract reaches $50,000. The Contractor agrees to the "Completion Date" as listed in Exbibit A,Scope of Work, and agrees to complete all work by said date. The Contractor and City agree that the City will suffer damages each day the work remains uncompleted after the Completion Date and that the amount of those damages is difficult to calculate. Contractor and City agree that a reasonable amount of damages for late completion is $50.00 per day and Contractor agrees to pay damages in that amount if the work is not completed by the Completion Date. The Contractor shall notify the City in writing when the Contractor considers the project complete, and the City shall,within 15 days after receiving the written notice,either accept the work or notify the Contractor of work yet to be performed on the contract. Upon acceptance by the City, the entire balance due to the Contractor shall be paid to the Contractor, by the City within 30 days after the date of said final acceptance or payment processed with purchase card. As a further condition of final acceptance, the City may require the Contractor to submit evidence, satisfactory to the City's Representative, that all payrolls, material bills, and other indebtedness connected with the project have been paid, except that in case of any disputed indebtedness or liens, the Contractor may submit in lieu of evidence of payment, a surety bond satisfactory to the City guaranteeing payment of all such disputed amounts when adjudicated in cases where such payment has not already been guaranteed by surety bond. 8. Status Of Contractor As Independent Contractor Contractor certifies that: A. Contractor acknowledges that for all purposes related to this Agreement, Contractor is and shall be deemed to be an independent Contractor as defined by ORS 670.600 and not an employee of City, shall not be entitled to benefits of any kind to which an employee of City is entitled and shall be solely responsible for all payments and taxes required by law. Furthermore, in the event that Contractor is found by a court of law or any administrative agency to be an employee of City for any purpose, City shall be entitled to offset compensation due, or to demand repayment of any amounts paid to Contractor under the terms of this Agreement, to the full extent of any benefits or other remuneration Contractor receives (from City or third party) as a result of said finding and to the full extent of any payments that City is required to make (to Contractor or to a third party) as a result of said finding. B. The undersigned Contractor hereby represents that no employee of the City, or any partnership or corporation in which a City employee has an interest, has or will receive any remuneration of any description from Contractor, either directly or indirectly, in connection with the letting or performance of this Agreement,except as specifically declared in writing. C. If this payment is to be charged against Federal funds,Contractor certifies that he or she is not currently employed by the Federal Government and the amount charged does not exceed his or her normal charge for the type of service provided. Page 3 D. Contractor and its employees,if any,are not active members of the Oregon Public Employees Retirement System and are not employed for a total of 600 hours or more in the calendar year by any public employer participating in the Retirement System. E. Contractor certifies that it currently has a City business license or will obtain one prior to delivering services under this Agreement. F. Contractor is not an officer, employee, or agent of the City as those terms are used in ORS 30.265. 9. Subcontracts -Assignment&Delegation Contractor shall submit a list of Subcontractors for approval by the City,and Contractor shall be fully responsible for the acts or omissions of any Subcontractors and of all persons employed by them, and neither the approval by City of any Subcontractor nor anything contained herein shall be deemed to create any contractual relation between the Subcontractor and City. This agreement, and all of the covenants and conditions hereof, shallinure to the benefit of and be binding upon the City and the Contractor respectively and their legal representatives. Contractor shall not assign any rights nor delegate any duties incurred by this contract, or any part hereof without the written consent of City,and any assignment or delegation in violation hereof shall be void. Any and all subcontracts issued by the Contractor shall contain a provision that workers shall be paid not less that the PWR Law specified rr nimum wage if this contract ever exceeds $50,000 as outlined ars Section 2. 10. Contractor- Payment of Benefits.- Hours of Work A. The Contractor shall: 1) Make payment promptly, as due, to all persons supplying to such Contractor labor or material for the prosecution of the work provided for in this contract; 2) Pay all contributions or amounts due the under the Industrial Accident Fund form the Contractor or subcontractor incurred in the performance of this Agreement; 3) Pay to the Department of Revenue all sums withheld from employees pursuant to ORS 316.167; 4) Not permit any lien or claim to be filed or prosecuted against the City of Tigard, on account of any labor or material furnished. B. If this contract ever exceeds $50,000 as outlined in Section 2, the Contractor or the Contractor's Surety and every Subcontractor or the Subcontractor's Surety shall file certified statements with the City in writing in form prescribed by the Commissioner of the Bureau of Labor and Industries, certifying the hourly rate of wage paid each worker which the Contractor or the Subcontractor has employed upon such public work, and further certifying that no worker employed upon such public work has been paid less than the prevailing rate of wage, which certificate and statement shall be verified by the oath of the Contractor or the Contractor's Surety or Subcontractor or the Subcontractor's Surety that the Contractor or Subcontractor has read such statement and certificate and knows the contents thereof and that the same is true to the Contractor's or Subcontractor's knowledge. Page 4 1) The certified statements shall set out accurately and completely the payroll records for the prior week, including the same and address of each worker, the worker's correct classification,rate of pay, daily and weekly number of hours worked, deductions made and actual wages paid. 2) Each certified statement required herein shall be delivered or mailed by the Contractor or Subcontractor to the City. A true copy of the certified statements shall also be filed at the same time with the Commissioner of the Bureau of Labor and Industries. Certified statements shall be submitted as follows: a) For any project 90 days or less from the date of the award of the contract to the date of completion of work under the contract, the statements shall be submitted once before the first payment is made, and once before final payment is made of any sum due on account of the contract. b) For any project exceeding 90 days from the date of the award of the contract to the date of completion of work under contract, the statements shall be submitted once before the first payment is made,at 90 day intervals thereafter, and once before final payment is made of any sum due on account of the contract. e) Each Contractor or Subcontractor shall preserve certified statements for a period of three years from the date of completion of the contract. C. The Contractor agrees that if the Contractor fails,neglects or refuses to make prompt payment of any claim for labor or services finished to the Contractor or a Subcontractor by any person in connection with this contract as such claim becomes due, the proper office of the City of Tigard may pay such Blain-i to the person furnishing the labor or services and charge the amount of the payment against funds due or to become due to the Contractor by reason of such contract. Payment of a claim in this manner shall not relieve the Contractor or the Contractor's Surety from obligation with respect to any unpaid claims. D. Contractor agrees that no person shall be employed for more than ten (10) hours in any one day,or 40 hours in any one week,except in cases of necessity or emergency or when the City deems it in the best interest of the public or policy absolutely requires it, in which event, the person so employed for excessive hours shall receive at least time and a half pay for the following: 1) For all overtime in excess of eight hours in any one day or 40 hours in any one week when the work week is five consecutive days,Monday through Friday;or 2) For all overtime in excess of 10 hours in any one day or 40 hours in any one week when the work week is four consecutive days,Monday through Friday;and 3) For all work performed on Saturday and on the legal holidays specified in ORS 279C.540. E. No City employee shall be required to work overtime or on a Saturday, Sunday or holiday in the fulfillment of this contract except where the Contractor agrees to reimburse the City in the amount of money paid the employee for such work as determined by state law, the City's personnel rules or union agreement. The Contractor shall require every Subcontractor to comply with this requirement. Page 5 F. If Contractor or any first-tier subcontractor fails to pay a person furnishing labor or material within 30 days after receipt of payment form the City or from the Contractor to a subcontractor, the Contractor or first-tier subcontractor shall owe the person the amount due plus interest commending at the end of the 10 day period that the payment is due under ORS 279C.580, unless payment is subject to a good-faith dispute. The interest rate shall be as specified in ORS 279C.505(2). If the Contractor or any subcontractor fails,neglects,or refuses to pay a person furnishing labor or material, the person may file a complaint with the Construction Contractors Board, unless the payment is subject to a good faith dispute as defined in ORS 279C.580. G. Contractor shall include a clause in each contact with a subcontractor a requirement that the contractor pay the subcontractor for satisfactory performance within 10 days of receipt of payment from the City for the work. Contractor shall include in contracts with subcontractors an interest provision for such payments in compliance with ORS 279C.580. Contractor shall include a clause in each contract with a subcontractor requiring the subcontractor to meet the same payment and interest standards as required by ORS 279C.580 (4). 11. Dmg Testing Program ORS 279C.505 requires that all public improvement contracts contain a provision requiring contractors to demonstrate that an employee drug-testing program is in place. The Contractor demonstrates that a drug-testing program is in place by signing of the contact. The drug testing program will apply to all employees and will be maintained for the duration of the Contract awarded. Failure to maintain a program shall constitute a material breach of contract. 12. Contractor's E=19ye�, a Medical Payments Contractor agrees to pay promptly as due, to any person, co-partnership, association or corporation furnishing medical, surgical,and hospital care or other needed care and attention incident to sickness or injury to the Contractor's employees,all sums which the Contractor agreed to pay for such services and all money and sutras which the Contractor collected or deducted from employee wages pursuant to any law,contract or agreement for providing or paying for such service. 13. Early Termination A. This agreement may be terminated without cause prior to the expiration of the agreed upon term by mutual written consent of the parties and for the following reasons: 1) If work under the Contract,is suspended by an order of a public agency for any reason considered to be in the public interest other than by a labor dispute or by reason of any third party judicial proceeding relating to the work other than a suit or action filed in regard to a labor dispute;or 2) If the circumstances or conditions are such that it is impracticable within a reasonable time to proceed with a substantial portion of the Contract. B. Payment of Contractor shall be as provided by ORS 279C.660 and, shall be prorated to and include the day of termination and shall be in full satisfaction of all claims by Contractor against City under this Agreement. C. Termination under any provision of this paragraph shall not affect any right, obligation, or liability of Contractor or City which accrued prior to such termination. Page 6 14. Cancellation with Cause A. City may terminate this Agreement effective upon delivery of written notice to Contractor, or at such later date as may be established by City,under any of the following conditions: 1) If City funding from federal, state, local, or other sources is not obtained and continued at levels sufficient to allow for the purchase of the indicated quantity of services. This Agreement may be modified to accommodate a reduction in fiends, 2) If Federal or State regulations or guidelines are modified, changed, or interpreted in such a way that the services are no longer allowable or appropriate for purchase under this Agreement, 3) If any license or certificate required by law or regulation to be held by Contractor, its subcontractors, agents, and employees to provide the services required by this Agreement is for any reason denied,revoked,or not renewed,or 4) If Contractor becomes insolvent, if voluntary or involuntary petition in bankruptcy is filedd by or against Contractor,if a receiver or trustee is appointed for Contractor, or if there is an assignment for the benefit of creditors of Contractor. Any such termination of this agreement under paragraph (a) shall be without prejudice to any obligations or liabilities of either party already accrued prior to such termination. B. City, by written notice of default (including breach of contract) to Contractor, may terminate the whole or any part of this Agreement: 1) If Contractor fails to provide services called for by this agreement within the time specified herein or any extension thereof,or 2) If Contractor fails to perform any of the other provisions of this Agreement,or so fails to pursue the work as to endanger performance of this agreement in accordance with its terms, and after receipt of written notice from City, fails to correct such failures within ten (10) days or such other period as City may authorize. The rights and remedies of City provided in the above clause related to defaults (including breach of contract) by Contractor shall not be exclusive and are in addition to any other rights and remedies provided by law or under this Agreement. If City terminates this Agreement under paragraph (b), Contractor shall be entitled to receive as fall payment for all services satisfactorily rendered and expenses incurred,an amount which bears the same ratio to the total fees specified in this Agreement as the services satisfactorily rendered by Contractor bear to the total services otherwise required to be performed for such total fee;provided, that there shall be deducted from such amount the amount of damages,if any, sustained by City due to breach of contract by Contractor. Damages for breach of contract shall be those allowed by Oregon law, reasonable and necessary attorney fees, and other costs of litigation at trial and upon appeal-3 15. Access to Records City shall have access to such book, documents, papers and records of Contractor as axe directly pertinent to this Agreement for the purpose of making audit,examination,excerpts,and transcripts. 16. Work is Property of Cfty All work performed by Contractor under this Agreement shall be the property of the City. Page 7 17. Adherence to Law A. Contractor shall adhere to all applicable laws governing its relationship with its employees, including but not limited to laws, rules, regulations, and policies concerning workers' compensation,and minimum and prevailing wage requirements. B. To the extent applicable, the Contractor represents that it will comply with Executive Order 11246 as amended, Executive Order 11141, Section 503 of the Vocational Rehabilitation Act of 1973 as amended and the Age Discrimination Act of 1975, and all rules and regulations issued pursuant to the Acts. C. As provided by ORS 279C.525, all applicable provisions of federal, state or local statutes, ordinances and regulations dealing with the prevention of environmental pollution and the preservation of natural resources that affect the work under this contract are by reference incorporated herein to the same force and affect as if set forth herein in full. If the Contractor must undertake additional work due to the enactment of new or the amendment of existing statutes, ordinances or regulations occurring after the submission of the successful bid, the City shall issue a Change Order setting forth the additional work that must be undertaken. The Change Order shall not invalidate the Contract and there shall be, in addition to a reasonable extension,if necessary,of the contract time,a reasonable adjustment in the contract price,if necessary,to compensate the Contractor for all costs and expenses incurred,including overhead and profits,as a result of the delay or additional work. 18. Ch&nges City may at any time, and without notice, issue a written Change Order requiring additional work within the general scope of this Contract, or any amendment thereto, or directing the omission of or variation in work. If such Change Order results in a material change in the amount or character of the work, an equitable adjustment in the Contract price and other provisions of this Contract as may be affected may be made. Any claim by Contractor for and adjustment under this section shall be asserted in writing within thirty (30) days from the date of receipt by Contractor of the notification of change or the claim will not be allowed. Whether made pursuant to this section or by mutual agreement,no change shall be binding upon City until a Change Order is executed by the Authorized Representative of City,which expressly states that it constitutes a Change Order to this Contract. The issuance of information, advice, approvals, or instructions by City's Representative or other City personnel shall not constitute an authorized change pursuant to this section. Nothing contained in this section shall excuse the Contractor from proceeding with the prosecution of the work in accordance with the Contract,as changed. 19. Force Majeure Neither City nor Contractor shall be considered in default because of any delays in completion of responsibilities hereunder due to causes beyond the control and without fault or negligence on the part of the party so disenabled, including, but not restrictedto, an act of God or of a public enemy, volcano, earthquake, fire, flood, epidermic, quarantine, restriction, area-wide strike, freight embargo, unusually severe weather or delay of Subcontractor or suppliers due to such cause; provided that the party so disenabl.ed shall within ten (10) days from the beginning of such delay, notify the other party in writing of the causes of delay and its probable extent. Such notification shall not be the basis for a claim for additional compensation. Each party shall, however, make all reasonable efforts to remove or eliminate such a cause of delay or default and shall, upon cessation of the cause, diligently pursue performance of its obligation under Contract. Page 8 20. Nonwaiver The failure of the City to insist upon or enforce strict performance by Contractor of any of the terms of this contract or to exercise any rights hereunder shall not be construed as a waiver or relinquishment to any extent of its right to assert or rely upon such terms or rights on any future occasion. 21. W_ arranties All work shall be guaranteed by the.Contractor for a period of one year after the date of final acceptance of the work by the City. Contractor warrants that all practices and procedures, workmanship, and materials shall be the best available unless otherwise specified in the profession. Neither acceptance of the work nor payment therefore shall relieve Contractor from liability under warranties contained in or implied by this contract. 22. Attorneys Fees In case suit or action is instituted to enforce the provisions of this contract, the parties agree that the losing party shall pay such sum as the Court may adjudge reasonable attorney's fees and court costs including attorney's fees and court costs on appeal. 23. Governing Law The provisions of this Agreement shall be construed in accordance with the provisions of the laws of the State of Oregon. Any action or suits involving any questions arising under this Agreement must be brought in the appropriate court of the State of Oregon. 24. Conflict Between Terms It is further expressly agreed by and between the parties hereto that should there be any conflict between the terms of this instrument and the proposal of the Contractor,this instrument shall control and nothing herein shall be considered as an acceptance of the said terms of said proposal conflicting herewith. 25. Indemnification Contractor warrants that all its work will be performed in accordance with generally accepted professional practices and standards as well as the requirements of applicable federal, state and local laws,it being understood that acceptance of a contractor's work by City shall not operate as a waiver or release. Contractor agrees to indemnify and defend the City,its officers, agents and employees and hold them harmless from any and all liability, causes of action, claims, losses, damages, judgments or other costs or expenses including attorney's fees and witness costs and (at both trial and appeal level,whether or not a trial or appeal ever takes place) that may be asserted by any person or entity which in any way arise from, during or in connection with the performance of the work described in this contract, except liability arising out of the negligence of the City and its employees. If any aspect of this indemnity shall be found to be illegal or invalid for any reason whatsoever, such illegality or invalidity shall not affect the validity of the remainder of this indemnification. 26. Insurance Contractor and its subcontractors shall maintain insurance acceptable to City in fitll force and effect throughout the term of this contract. Such insurance shall cover all risks arising directly or indirectly out of Contractor's activities or work hereunder, including the operations of its subcontractors of any tier. Such insurance shall include provisions that such insurance is primary insurance with respect to Page 9 the interests of City and that any other insurance maintained by City is excess and not contributory insurance with the insurance required hereunder. The policy or policies of insurance maintained by the Contractor and its subcontractor shall provide at least the following limits and coverages: A. Commercial General Liability Insurance: Contractor shall obtain,at contractor's expense, and keep in effect during the term of this contract, Comprehensive General Liability Insurance covering Bodily Injury and Property Damage on an "occurrence" form (1996 ISO or equivalent). This coverage shall include Contractual Liability insurance for the indemnity provided under this contract. The following insurance will be carried: Coverage Lirn > General Aggregate $2,000,000 Products-Completed Operations Aggregate $1,000,000 Personal&Advertising Injury $1,000,000 Each Occurrence $1,000,000 Fire Damage(Any one fire) $50,000 Medical Expense(Any one person) $5,000 B. Commercial Automobile Insurance: Contractor shall also obtain, at contractor's expense, and keep in effect during the term of the contract, Commercial Automobile Liability coverage including coverage for all owned, hired, and non-owned vehicles. The Combined Single Limit per occurrence shall not be less than$1,000,000. C. Workers' Compensation Insurance: The Contractor, its subcontractors, if any, and all employers providing work, labor or materials under this Contract are subject employers under the Oregon Workers' Compensation Law and shall comply with ORS 656.017,which requires them to provide workers' compensation coverage that satisfies Oregon law for all their subject workers. Out-of-state employers must provide Oregon workers' compensation coverage for their workers who work at a single location within Oregon for more than 30 days in a calendar year. Contractors who perform work without the assistance or labor of any employee need not to obtain such coverage. This shall include Employer's Liability Insurance with coverage limits of not less than$100,000 each accident. D. .Additional Insured Provision: The' City of Tigard, Oregon, its officers, directors, and employees shall be added as additional insureds with respect to this contract. All Liability Insurance policies will be endorsed to show this additional coverage. E. Notice of Cancellation: There shall be no cancellation, material change, exhaustion of aggregate limits or intent not to renew insurance coverage without 30 days written notice to the City. Any failure to comply with this provision will not affect the insurance coverage provided to the City. The 30 days notice of cancellation provision shall be physically endorsed on to the policy. F. Insurance Carrier Rating: Coverage provided by the Contractor must be underwritten by an insurance company deemed acceptable by the City. The City reserves the right to reject all or any insurance carrier(s)with an unacceptable financial rating. Page 10 G. Certificates of Insurance: As evidence of the insurance coverage required by the contract, the contractor shall furnish a Certificate of Insurance to the City. No contract shall be effected until.the required certificates have been received and approved by the City. The certificate will specify and document all provisions within this contract. A renewal certificate will be sent to the above address 10 days prior to coverage expiration. H. Independent Contractor Status: The service or services to be rendered under this contract are those of an independent contractor. Contractor is not aaa officer, employee or agent of the City as those terms are used in ORS 30.265. I. Primary Coverage Clarification: All parties to this contract hereby agree that the contractor's coverage will be primary in the event of a loss. J. Cross-I..iability.Clause: A cross-liability clause or separation of insureds clause will be included in all general liability,professional liability,pollution and errors and omissions policies required by this contract. A copy of each insurance policy, certified as a true copy by an authorized representative of the issuing insurance company, or at the discretion of City,in lieu thereof,a certificate in form satisfactory to City certifying to the issuance of such insurance shall be forwarded to: City of Tigard Attn: Michelle Wright,Business Manager 13125 SW Hall Blvd Tigard, Oregon 97223 Such policies or certificates must be delivered prior to commencement of the work. Ten days cancellation notice shall be provided City by certified mail to the name at the address listed above in event of cancellation or non-renewal of the insurance. The procuring of suchh required insurance shall not be construed to limit contractor's liability hereunder. Notwithstanding said insurance, Contractor shall be obligated for the total amount of any damage, injury, or loss caused by negligence or neglect connected with this contract. 27. _Method and Place of Giving Notice,Submitting Bills and Making Payments All notices, bills and payments shall be made in writing and may be given by personal delivery or by mail. Notices,bills and payments sent by mail should be addressed as follows: Attu:Nicklas Nissen Attn: Gaa Cawle Address: 13125 SW Hall Blvd. Address: 2121 NW Thurman Street Tigard, Oregon 97223 Portland,OR 97210 Phone: 503 718-2605 Phone: 503 224-3511 Fax: (503).684-8840 Fax: 503 242-0953 Email Address: ngn@tigard-or.gov Email Address: GARY Pe-c-eo.com and when so addressed, shall be deemed given upon deposit in the United States mail,postage prepaid. In all other instances, notices, bills and payments shall be deemed given at the time of actual delivery. Changes may be made in the names and addresses of the person to whom notices, bills and payments are to be given by giving written notice pursuant to this paragraph. Page 11 28. Hazardous Materials Contractor shall supply City with a list of any and all hazardous substances used in performance of this Agreement. That list shall identify the location of storage and use of all such hazardous substances and identify the amounts stored and used at each location. Contractor shall provide City with material safety data sheets for all hazardous substances brought onto City property,created on City property or delivered to City pursuant to this Agreement. For the purpose of this section, "hazardous substance" means hazardous substance as defined by ORS 453.307(4). Contractor shall complete the State Fire Marshall's hazardous substance survey as requited by ORS 453.317 and shall assist City to complete any such survey that it may be required to complete because of substances used in the performance of this Agreement. 29. Hazardous Waste If, as a result of performance of this Agreement, Contractor generates any hazardous wastes, Contractor shall be responsible for disposal of any such hazardous wastes in compliance with all applicable federal and state requirements. Contractors shall.provide City with documentation, including all required manifests, demonstrating proper transportation and disposal of any such hazardous wastes. Contractor shall defend, indemnify, and hold harmless City for any disposal or storage of hazardous wastes generated pursuant to this Contract and any releases or discharges of hazardous materials. 30. Severabiliti In the event any provision or portion of this Agreement is held to be unenforceable or invalid by any court of competent jurisdiction, the remainder of this Agreement shall remain in full force and effect and shall in no way be affected or invalidated thereby. 31. Demolition—Salvage and Rede_ng As required by ORS 279C.510, Contractor shall salvage or recycle any construction and demolition debris if feasible and cost-effective. 32. Complete Agreement This Agreement and attached e)chibits constitute the entire Agreement between the parties. No waiver, consent, modification, or change of terms of this Agreement shall bind either party unless in wfiting and signed by both parties. Such waiver, consent, modification, or change if made, shall be effective only in specific instances and for the specific purpose given. There are no understandings, agreements, or representations, oral or written, not specified herein regarding this Agreement. Contractor,by the signature of its authorized representative,hereby acknowledges that he has read this Agreement,understands it and agrees to be bound by its terms and conditions. Page 12 IN WITNESS WHEREOF, City has caused this Agreement to be executed by its duly authorized undersigned officer and Contractor has executed diis Agreement on the date hereinabove first written. Approved by Tigard's Local Contract Review Hoard: Not required for this Project CITY F TIGARD ELECVUCAL CONSTRUCTION COMPANY signature . / Sig�natur Printed Name&Title Printed Name&Title 13 Date Date Page 13 EXHIBIT A SCOPE OF WORK Single Mode Fiber Optic Cabling to Public Works Office The City of Tigard is seeking a firm or individual "Service Provider" to provide single mode fiber optic cabling to Public Works Office, Service Description The Service Provider will: I. Furnish all supervision,labor,materials, transportation and equipment necessary to install single mode fiber optic cabling to Public Works Tuber House. 2. Be licensed in the State of Oregon to perform the tasks required under this Scope of Work and will furnish the City with proof of current licensing. Furthermore, the Service Provider will comply with all federal and state requirements and regulations. Services: Examples of Essential Functions • Provide and.install one (1) 12-strand single mode fiber optic cable between information Niche Building Niche (8720 S.W. Burnham St.,Tigard OR 97223) and Public Works Zuber House (9025 S.W. Burnham St.,Tigard, OR 97223). • Bore underground from Niche box to corner of NE corner of building. Hand dig trench to southside communication box outside of Niche building, Installation Testitg_ • AlI testing shall be performed according to TIA/EIA standards and all the fiber optic strands shall be tested with our Fluke DTA 1800 tester. Test Equipment Calibrations: Test Mfg. Equipment Equipment Model# Serial# Description Fluke Multimode/Single Mode DTX-1800 Fiber Optic Test N/A Adap ter Assumptions & Clarifications: EC Company assumes that all work shall be done during normal business hours of 7:00 a.m. and 5:00 p.m. Monday through Friday. Time of Completion:June 30, 2011. Total cost: $8,790 Page 14