Correspondence 1 p
1
l
f ;.
=- ,
ARMES AND
ASSOCIATES INC. GENERAL CONTRACTORS
' 8083 S.E. 13th Avenue, No. 3 • Portland, Oregon 97202 • (503) 232 -0817 • FAX (503) 232 -3227
February 13, 1996
Building Department
City of Tigard
13125 SW Hall Blvd
Tigard, OR 97223
Re: Permits #SIT94 -0039 & #BUF94 -0263
08540 SW Pfaffle St. /
We were surprised to receive the enclosed letters from the property owner at the above
address.
The above permits were taken out by AT & T Wireless Services (formerly Cellular One)
in 1994 for cellular phone cell site. We were the general contractor and completed
construction early in 1995.
Ms. Letha Thomas was the inspector on the project and was at the site (both at our
request and of her own volition) on numerous occasions for inspections.
If a "final" final inspection is required, I would be happy to meet your representative at
the site. Arrangements will need to be made in advance, however, with AT & T to get
access to the site, since it is a secure area. Please call me with a date and time and I
will make the necessary arrangements.
_ re y f // //i
k Armes
c s
cc: Lyn Carter /;AT & T Wireless, Don Schaeffer
FEE - S - 58 aRI 3:17 FYI COAST SERVI:ES FAX E. lE :3EH94 ?
•
• February 1, 1996
' CITY OF .TIGARD
OREGON
SCHAEFFER, DONALD M
MUNCH, MICHAEL T
PO BOX 23697
TIGARD, OR 97281
Re: PERMIT #BUP94 -0263 at 08540 SW PFAFFLE ST .
Inspection(s) have been conducted on this project. However, we have no record of any subsequent
or final inspections within the past 180 days.
Please note that permits become void if there has not been an inspection performed for over 180
days. In that cast, the Building Division !nay require a new application and fees to continue work
The City may also pursue civil enforcement if work has proceeded without inspections or if an
unfinished project is outstanding.
Please advise the Building Division, IN WRITING, within 15 days, regarding the status of this
project. You may request additional time to complete the project.
Respond, IN WRITING, to: Building Division, 13125 SW Hall Blvd., Tigard OR 97223. Be
sure to include the following information:
1. Permit #.
....... 2. Addsrss of property.
3. Your name.
4. Your day time phone number.
If you are ready to schedule your next inspection please call our 24 -hour Inspection Recorder
at 639 -4175. Please call the Building Division at 639 -4171 for information regarding the next
inspection you require.
13125 SW Holt Blvd., Tigard, OR 97223 (503). 639 -4171 TDD (503) 684 -2772
. . _,
FEE- c -Se aR! "2:17 ?'A ;CAS- SERV .,ES FAX . E 3 9 � { F O
l :,.�, JdT�.. P. 4
f
. .1 L ! ~•
,..4 :4a.
February 1, 1996 CITY OF TIGARD
OREGON
SCHAEFFER, DONALD M _
MUNCH, MICHAEL T
PO BOX 23697
TIGARD, OR 97281
_. .. RE: PERMIT #SIT94-0939.. at 08540 SW PF AFF.LE. ST _ .. . .
We issued a permit for this project on 10/24/94, however we have no record of any inspection being
performed.
Permits expire if there has not been an inspection performed for over 180 days. In that case, the
Building Division may require a new application and fees to commence or continue work. The
City may also pursue civil enforcement if work has proceeded without the required inspections.
Please advise the Building Division, IN WRITING, within 15 days regarding the status of this
project. You may request additional time to complete the project.
Respond, IN WRITING, to: Building Division, 13125 SW Hall Blvd., Tigard OR 97223. Be
sure to include the following information:
1. Permit #.
• 2. Address of property. •
3. V of r name • - - - -
4. Your day time phone number.
If you are ready to schedule an inspection, please call our 24 -hour Inspection Recorder at
639 -4175.
13125 SW HGII Blvd., Tigiard, 012 97223 (503) 639 -4171 TDD (503) 684 -2772
a s .
c..
•
e
3ta�
INC.
, 1 44 4 4
February 5, 1996
Paving
City of Tigard
13125 SW Hall Blvd.
Tigard, OR 97223 Seal
RE: Permit #SIT94 -0039 at 8540 SW Pfaffle Street Coating
RE: Permit #BUP94 -0263 at 8540 SW Pfaffle Street
Per your letter dated February 1, 1996 indicating no record of final inspection. Striping
You will have to contact Armes and Associates or A T & T since they are the
ones who filed the permits or asked for them. Mr. Schaefer or Mr. Munch have
no keys to either the gates or the building located at this site nor did we request
the permits.
Sweeping
Sincerely, Flushing
4911)/144 U -Cart
Donald M. Schaefer Concrete
2A C t \cl(c)
Extruded
Curbing
•
Established
1970
P.O. BOX 23697 • TIGARD, OR 97281 • (503) 227 -4515 • FAX: 639 -9405
1 7 - 9 1 1- croo31
&/ect y -c z63
Cellular One Center
1600 SW 4th Avenue
Portland, OR 97201
CELLULARONE
IMAGINE NO LIMITS®
October 12, 1994
Mark Burrows
City of Tigard
13125 SW Hall Blvd.,
Tigard, OR 97223
Project: Cellular One plan check #9 -5C
8540 SW Pfaffle Street
Subject: Building Plan Review
(1991 UBC with Oregon Amendments)
Dear Mark,
Please find enclosed with this letter the six items you asked for in
your September 12 letter.
1) Stamped Calculations for 100 foot wood pole.
2) Three copies of erosion control plan submitted to United Sewerage
agency.
3) Letter showing approval status of prefabricated building with
Building Codes Division in Salem Oregon and BCD point of contact.
4) Completed form for Structural Special Inspections.
5) One hour fire protction rating letter from Omega Point
Labratories. Parapet exemption explanation from Mildren Design
Group.
6) Receipt for application of erosion control plan to USA.
Anything that you can do to expedite the release of these permits would
be greatly appreciated. If you have any questions about the attached
materials please give me a call at 248 -7491.
Aalrds,
Georg Ro.-rt
u `f ze.,„3
September 12, 1994 4nr,i A ""IC
Mildren Design Group CITY OF TIGARD
11830 SW Kerr Parkway, Suite 325
Lake Oswego, OR 97035 OREGON
Project: Cellular One- plan check #9 -5C
8540 SW Pfaffle Street
Subject: Building Plan Review
(1991 UBC with Oregon Amendments)
The plans for this project were reviewed for conformity with applicable
codes. Please submit the following items for completion of the plan
review process at your earliest convenience:
1. Submit Stamped calcs for the 100 foot wood pole from an Oregon
registered structural engineer.
2. Submit an erosion control plan which complies with all of the
requirements from USA (Unified Sewage Agency)- location of
silt fence, detail for silt fence, general notes, etc.
3. Submit a letter of approval for the pre -fab unit from the
Building Codes Division in Salem Oregon.
4. Please complete the following form and return to the Building
Division.
5. Per sheet SD2, the SW wall of the pre -fab unit is
approximately 7 -8 feet from the property line. Table 5 -A (B2
occupancy) requires a one -hour fire - resistive wall less than
20 feet from property lines.
6. Please submit an extra copy of a site and erosion control plan
for USA.
Please make these corrections on the appropriate pages of the drawings
and resubmit three copies of each page to the City of Tigard for review.
This plan review does not include electrical or plumbing plan reviews.
Electrical concerns can be directed to Washington County at 640 -3470 and
plumbing concerns to Mike Sheehan at the City of Tigard at 639 -4171
extension 312.
If you have any questions or concerns, please do not hesitate to call.
Sincerely,
Mark Burrows
Plans Examiner
639 -4171 ext. 361
mb /pc #9 -5.doc
13125 SW Hall Blvd., Tigard, OR 97223 (503) 639 -4171 TDD (503) 684 -2772
,\
7 y - 002-e_p 3
S IT�� - duo 3q
RECEIVED
1 ' OCT 0 6 1994
COMMUNITY DEVELOPMENT
((•
IIFAIIB]R1E4BIO]NII?
October 3, 1994
Mr. Mark Burrows
City of Tigard
13125 S.W. Hall Blvd.
Tigard, OR 97223
RE: Cellular One Plan 9 -5C, Project at 8540 S.W. Pfaffle St.
Dear Mr. Burrows:
This letter with enclosures is to certify that the equipment shelter being furnished to
Cellular One . for ; the referenced site has .been plan checked and approved by the
Building Codes Agency. A plan approval number of M115- 93 -0798D was assigned by
(your) state plan reviewer.
An application for insignia and inspection has been filed with the state officials. An
inspection should be as soon performed as possible after receipt at the Cellular One
warehouse on or about October 4, 1994. Upon completion of a satisfactory inspection,
an official insignia will be affixed to the exterior wall near the door by the inspector.
If you have any additional thoughts or questions in regard to this unit, please feel free
to call me at 1 -800- 824 -2614. I will answer any concerns you might have. Also, Chuck
Monschein with the Building Codes Agency is quite familiar with our shelters and the
approval process. He can be reached at 503- 378 -3080.
Once again, please feel free to call if you have any questions.
Yours truly,,
e7! <Oxa
Romano
State Certification Administrator
cc: George Robertson, Cellular One
•
Chuck Monschein, Building Codes Agency oR7
FIBREBOND CORPORATION
1300 DAVENPORT DRIVE • MINDEN, LOUISIANA 71055 • (318) 377 -1030 • FAX (318) 377 -5756
•
0
APPLICATION _ JR OFFICIAL INSIGNIA OR TAMP OF APPROVAL
• i f , FOR PREFABRICATED STRUCTURE
G , '4, r „ r State of Oregon
�' }'� Building Codes Agency INSTRUCTIONS
Manufactured Structures and Parks Section Submit applications in triplicate. All fees must be submit -
1535 Edgewater NW, Salem, Oregon 97310 ted in full with this application. Make all payments by
(503) 373 -1235 FAX (503) 373 -1014 check or money order made payable to the Building Codes
. Agency. Do not send cash. Replacement requests must be
accompanied by a letter of explanation and proof of origi-
Applicant: /i'&2•t) ('x4' Mfr. No: ,C1 //5 al Agency approval. Fees are not refundable.
Mailing Address: /,. 4, 4.e.
City: a State: LA Zip Coder /00 j USE A SEPARATE FORM FOR EACH INDIVIDUAL
STRUCTURE OR GROUP OF MODULES OR COMPO-
Phone:./3.�77 /0 Fax: '/ e -37 /- 9Zc 5 NTS MAKING UP ONE STRUCTURE.
. . . DESIGN:CRITEREA : INSIGNIAISTAMP'APPLICATION- .
TYPE OF STRUCTURE: 0 PERMANENT APPLICATION FOR:NSIGNIA 0 STAMP
(See OSSC Chapter 50) Gi Lu..1
O COMPONENT
APPLICABLE CODES: 0 1 & 2 FAMILY MANUFACTURERS USE AGENCY USE
Q
❑ OMSC SERIAL NO. FEE AGENCY NO DATE BY
❑ OESC fACe-- 2lC76 -Sc �c .
❑- OPSC '
PLAN APPROVAL NUMBER , 7 j ' - 573-czol D : .. .. ..
PLAN APPROVAL EXPIRATION 6,- -/7 - /V "
NO. OF MODULES OR COMPONENTS / .
TYPE OF CONSTRUCTION •
(See OSSC Chapter 17 through 22) . .
OCCUPANCY GROUP �►�
(See OSSC Chapter 5 through 12) . . . .
DESIGN TEMPERATURE
(See OSSC Chapter 53) 40 °F
ELECTRICAL SERVICE LOAD CQ AMPS
FLOOR LOAD (Live Load) //S P.S.F.
ROOF LOAD (Live Load) ,y9 P.S.F.
�i WIND LOAD (Horizontal Wind Load) /c0 M.P.H.
WIND EXPOSURE: al B
,' (See OSSC Section 2311(c)) ❑ EXPOSURE C
-4, GAS TYPE: 0 LP GAS 0 NATURAL GAS
L \ SEISMIC ZONE: 01 0 2 0 2b 0 3 G' t4 ..
T-.; SIZE OF STRUCTURE: // "S "1.) xa27'f7 <. / 8 '/1 " ff . •
USE OF STRUCTURE: (6. cd lep4O ? - .Crnve4 e"
11 * , ) _ N INCOMPLETE SYSTEMS: 0 ELECTRICAL
t Z (Submit a "Notification to 0 PLUMBING FOR AGENCY IiSE ONLY
v ❑ MECHANICAL : INSIGNIA (831 :':: 5 ; r: ;:;,. ; >.:
Local Enforcement Agency"
ST 24-1):::i!:': . 5:.,:;z,.
k form with this application) ❑ S TR U CTURAL DATA PLATE (831 243) :.` ::,i :' 'S;
r• LOCATION OV FIRST. INSTALLATION:
•
v OWNER/LEASEE: CEL.[.Lail- L 0,16" � k x• RM
PEIT APPLICATION APPROVED: = .: ::
ADDRESS: i &OD SLJ, 5� /¢✓E
YES' NO BY:
City yLr4bru) County State C Le Zip 9 7Z / ❑ : ❑
AGREEMENT: Applic• • agrees that Oregon Insignias or Stamps will be affixed to all structures built, converted, sold, shipped to or installed in
', Oregd c ti ih structural, plumbing, mnical, an, fi saf equipmento
, cnons or llains of each ua ng
an Oregon on an In serignia fy or that st. p will be manufactured or echa installed ele in accor and w ith Oregon approved p lans necti , statutes, an insta d rul Applic str c onsents cturebe t o ri all
necessary inspcc .' is d fees incurred incidental to the issuance of Oregon Plan Approvals, Insigni or Stamps of Approval.
Authorized Si : • • re Title or Postuon / Date /
■.... �/ "G -- - F/ -, ,. j ; /r) • ...,,61 chr 9/
Applications will not be processed without an authorized signature. .
yr. ACu.`94 /17 /„ .
OCT -11 -94 TUE 10:00 5 fTor y ez1 P. 01
- •- 130Pay —ov7-ta3
MAR 12 '92 17:54 FROM OMEGA POINT LABS PAGE.002
•
• I
. AT March 12, 1992 Post -It'' brand fax transmittal memo 767j # of pages ■ /
To
'/`'e J i m � From , I!�:�ifili�Il'
James Ramano Co. Co. ,t r
Fibrebond Corporation �r� ���
� 'oeo. Phone #
11R3�0�0�Dave�n Drive [� �y p - 71/S6 .31 p 8 3 71 -10,�a
Minden, LA / 10.'� I Fa: #.sZ/� d 6 7 O Fa: 3/C 7 3 7 , - q er
Re: Project No. 93059
ASTM E119 Fire Test of Building Construction and Materials
Fibrebond Precast Well System •
Dear Mr. Raman:
This letter will serve as an interim report of the E119 fire resistance test which we
performed recently on your precast wall system,.consisting of a nominally 3/4°
layer of epoxy - concrete over 2 inches of polyurethane foam, with a nominally 1-
114' thick layer of epoxy- concrete (with embedded aggregate) on the exterior and •
with reinforced, cast columns and beams on the inside of the panel.
'The wall was received as a 10' x 10' assembly and was directly mounted into a
masonry lined, restraining test frame. After being allowed to dry to equilibrium
(less than 75% r.h. within the wall), the wall was placed in front of our large scale
E119 fire resistance wall furnace (with the interior side towards the flame, since
that was the weakest side), instrumented with thermocouples and exposed to the •
E119 time• temperature curve until failure by heat transmission. The wall was
then removed from the furnace and exposed to the standard hose stream teat,
• which was successfully met. •
The test wall achieved a fire resistance rating of 102 minutes. A full report of this
project will be issued following receipt of the final drawings of the wall interior.
If you or anyone else has any questions concerning this or any other projects,
. , please contact me at 1-800-966-5253.
Sincerely,
Deggary N. Priest
President
•
6898 Alamo Deans Parkway
San Antonb, 1ba1 78238
• 612 / 647.5253
TELEX: 9102400828 SWCS UQ
FAX: 512 / 647.0815
From: Jack Kriz To: George Robertson Date: 10/10/94 Time: 17:46:20 Page 1 of 1
MILDREN DESIGN GROUP, P.C.
ARCHITECTURE SPACE PLANNING
11830 SW Kerr Parkway, Suite 325
Lake Oswego, OR 97035
503/244.0552 Fax 244-0417
FAX TRANSMITTAL
To: Cellular One Date 10/10/94
Cellular One Center FAX 248 -7486
Portland, Oregon
Attention: George Robertson
Pro iect Name: Pfaffel Road Cell Site Project Number. 93085
Attached: _ calculation
change order
copy of letter
details
plans
specifications
X other
Number of Pages: Description:
Total pages sent: 1 (including this transmittal)
Remarks: Wanted to catch you in case my voice mail didn't. The UBC, section 1710 has exceptions to parapet
requirements. Exception C, fits our situation, stating that when a building is less than 1000 sf per
floor, no parapet is required
Copy to:
Signed: Jack Kriz
Hard copy to follow in mail
October 14, 1994
kRosoi
CITY OF TIGARD
O REGON
Carlson Testing Company Inc.
PO Box 23814
Tigard, OR 97223
Dear Lauri O'Conner.
The owner has notified us that he/she will retain your services to perform Special Inspections in
accordance with the provisions of the State Building Code, permit documents, and special inspection
requirements.
The owner or the owner's agent must also confirm with you that they have authorized you to do the special
inspection work.
As the regulatory agency, the City requires that you do the following:
1. Submit copies of all inspection reports promptly to the Building Division, architect,
engineer, and the contractor.
2. Maintain one copy of each field report at the job site.
3. Submit a final report at the completion of each category of work that you inspect. (See
U.B.C. 7015 for soils special inspection final report requirements).
If you fail to comply with the above requirements, there may be cause for the City to revoke your authority
as special inspector for this job.
Should you have any questions, please call the Building Division at (503) 639 -4171.
PERMIT NO: Bup94-0263
OWNER: Cellular One
PROJECT ADDRESS: 8540 SW Pfaffle Street
PROJECT DESCRIPTION: New Cell Site
TYPES OF SPECIAL INSPECTION: Reinforced Concrete
Sincerely,
.444,
Mark Burrows
Building Division
c:
notifisi.doe
13125 SW Hall Blvd., Tigard, OR 97223 (503) 639 -4171 TDD (503) 684 -2772