Loading...
Correspondence ARMES AND ASSOCIATES, INC. GENERAL CONTRACTORS 8083 S.E. 13th Avenue, No. 3 • Portland, Oregon 97202 • (503) 232 -0817 • FAX (503) 232 -3227 February 13, 1996 Building Department City of Tigard 13125 SW Hall Blvd Tigard, OR 97223 Re: Permits #SIT94-0039 & #B1494-0263 08540 SW Pfaffle St. We were surprised to receive the enclosed letters from the property owner at the above address. The above permits were taken out by AT & T Wireless Services (formerly Cellular One) in 1994 for a cellular phone cell site. We were the general contractor and completed construction early in 1995. Ms. Letha Thomas was . the inspector on the project and was at the site (both at our request and of her own volition) on numerous occasions for inspections. If a "final" final inspection is required, I would be happy to meet your representative at the site. Arrangements will need to be made in advance, however, with AT & T to get access to the site, since it is a secure area. Please call me with a date and time and I will make the necessary arrangements. re y/ 40 P k Armes cc: Lyn Carter /;AT & T Wireless, Don Schaeffer ,' FEE- E -5E FRI 5:17 '/1 GcAs: SEFV1:ES FAX E. 1E EHS4C5 ? . • dP,,II fit_ : February 1, 1996 CITY OF .TIGARD OREGON SCHAEFFER, DONALD M . MUNCH, MICHAEL T PO BOX 23697 TIGARD, OR 97281 Re: PERMIT #BUP94 -0263 at 08540 SW PFAFFLE ST Inspection(s) have been conducted on this project. However, we have no record of any subsequent or final inspections within the past 180 days. Please note that permits become void if there has not been an inspection performed for over 180 days. In that cast, the Building Division may require a new application and fees to continue work_ The City may also pursue civil enforcement if work has proceeded without inspections or if an unfinished project is outstanding. Please advise the Building Division, IN WRITING, within 15 days, regarding the status of this project. You may request additional time to complete the project. Respond, IN WRITING, to: Building Division, 13125 SW Hall Blvd., Tigard OR 97223. Be sure to include the following information: 1. Permit #. . Addre of property. _.._ . _ .. _.. _. _ 3. Your name. 4. Your day time phone number. If you are ready to schedule your next inspection please call our 24 -hour Inspection Recorder at 639 - 4175. Please call the Building Division at 639 - 4171 for information regarding the next inspection you require. 13125 SW kcll Blvd., Tigard, OR 97223 (5033.639 -4171 TDD (503) 684 -2772 FEE .c-9c FR! 1=:17 3M - CAS: SER !,:ES Fq NO. [E:3E3S9 . • • J I L..,. .. 4 ,lisOf February 1, 1996 CITY OF TIGARD - OREGON SCHAEFFER, DONALD M — MUNCH, MICHAEL T PO BOX 23697 TIGARD, OR 97281 -_ ... —. .. RE: PERMIT #SIT94-0039: at 08540 SW PFAFFLE. ST _ • _ ... . We issued a permit for this project on 10/24/94, however we have no record of any inspection being performed. Permits expire if there has not been an inspection performed for over 180 days. In that case, the Building Division may require a new application and fees to commence or continue work. The City may also pursue civil enforcement if work has proceeded without the required inspections. Please advise the Building Division, IN WRITING, within 15 days regarding the status of this project. You may request additional time to complete the project. Respond, IN WRITING, to: Building Division, 13125 SW Hall Blvd., Tigard OR 97223. Be sure to include the following information: 1. Permit #, • 2. Address of property. - 3. our naive. V 4. Your day time phone number. If you are ready to schedule an inspection, please call our 24 -hour Inspection Recorder at 639 -4175. 13125 SW Hall Blvd., Tigard, OR 97223 (503) 639 -4171 TDD (5033 684 -2772 e:` {■� 4 `3 03 . ;; . x ,. �t � .� ",a,.`� `` i. , / 0., V'' , , ,-,' ' ..' '$.,.,.":4, , '' V '''''''''% ' 4)1 yap, INC. . `macs ' ; � .� y, . February 5, 1996 Paving City of Tigard 13125 SW Hall Blvd. Tigard, OR 97223 Seal RE: Permit #SIT94 -0039 at 8540 SW Pfaffle Street Coating RE: Permit #BUP94 -0263 at 8540 SW Pfaffle Street Per your letter dated February 1, 1996 indicating no record of final inspection. Striping You will have to contact Armes and Associates or A T & T since they are the ones who filed the permits or asked for them. Mr. Schaefer or Mr. Munch have no keys to either the gates or the building located at this site nor did we request the permits. Sweeping Sincerely, Flushing ... L 77 4____ j)a)/144 g Donald M. Schaefer U-Cart 1 i \°4 n11( 1) " 1 � , �' , A14-11 Extruded -...., i ASA° Curbing Established 1970 P.O. BOX 23697 • TIGARD, OR 97281 • (503) 227 -4515 • FAX: 639 -9405 5 17 y - az1-o 39 PU►°ci y - vo,Z Cellular One Center 1600 SW 4th Avenue Portland, OR 97201 CELLULARONE® IMAGINE NO LIMITS® October 12, 1994 Mark Burrows City of Tigard 13125 SW Hall Blvd., Tigard, OR 97223 Project: Cellular One plan check #9 -5C 8540 SW Pfaffle Street Subject: Building Plan Review (1991 UBC with Oregon Amendments) Dear Mark, Please find enclosed with this letter the six items you asked for in your September 12 letter. 1) Stamped Calculations for 100 foot wood pole. 2) Three copies of erosion control plan submitted to United Sewerage agency. 3) Letter showing approval status of prefabricated building with Building Codes Division in Salem Oregon and BCD point of contact. 4) Completed form for Structural Special Inspections. 5) One hour fire protction rating letter from Omega Point Labratories. Parapet exemption explanation from Mildren Design Group. 6) Receipt for application of erosion control plan to USA. Anything that you can do to expedite the release of these permits would be greatly appreciated. If you have any questions about the attached materials please give me a call at 248 -7491. ;rte Georg- Ro• rtson (94.(_ a-e::, 2./ September 12, 1994 tr O Mildren Design Group CITY OF TIGARD 11830 SW Kerr Parkway, Suite 325 Lake Oswego, OR 97035 OREGON Project: Cellular One- plan check #9 -5C 8540 SW Pfaffle Street Subject: Building Plan Review (1991 UBC with Oregon Amendments) The plans for this project were reviewed for conformity with applicable codes. Please submit the following items for completion of the plan review process at your earliest convenience: 1. Submit Stamped caics for the 100 foot wood pole from an Oregon registered structural engineer. 2. Submit an erosion control plan which complies with all of the requirements from USA (Unified Sewage Agency)- location of silt fence, detail for silt fence, general notes, etc. 3. Submit a letter of approval for the pre -fab unit from the Building Codes Division in Salem Oregon. 4. Please complete the following form and return to the Building Division. 5. Per sheet SD2, the SW wall of the pre -fab unit is approximately 7 -8 feet from the property line. Table 5 -A (B2 occupancy) requires a one -hour fire - resistive wall less than 20 feet from property lines. 6. Please submit an extra copy of a site and erosion control plan for USA. Please make these corrections on the appropriate pages of the drawings and resubmit three copies of each page to the City of Tigard for review. This plan review does not include electrical or plumbing plan reviews. Electrical concerns can be directed to Washington County at 640 -3470 and plumbing concerns to Mike Sheehan at the City of Tigard at 639 -4171 extension 312. If you have any questions or concerns, please do not hesitate to call. Sincerely, Mark Burrows Plans Examiner 639 -4171 ext. 361 mb /pc#9 -5.doc 13125 SW Hall Blvd., Tigard, OR 97223 (503) 639 -4171 TDD (503) 684 -2772 dam 7 q - oa.21.0 3 -\ 5 179 1 -1 - &E no 3/ RECEIVED OCT 4 0 61994 COMMUNITY DEVELOPMENT \ (( 1 J IFAIIB1RlE-4BI0 ID. October 3, 1994 -k! Mr. Mark Burrows City of Tigard 13125 S.W. Hall Blvd. Tigard, OR 97223 RE: Cellular One Plan 9 -5C, Project at 8540 S.W. Pfaffle St. Dear Mr. Burrows: This letter with enclosures is to certify that the equipment shelter being furnished to Cellular One for : the referenced site has been plan checked and approved by the Building Codes Agency. A plan approval number of M115-93-0798D was assigned by (your) state plan reviewer. An application for insignia and inspection has been filed with the state officials. An inspection should be as soon performed as possible after receipt at the Cellular One warehouse on or about October 4, 1994. Upon completion of a satisfactory inspection, an official insignia will be affixed to the exterior wall near the door by the inspector. If you have any additional thoughts or questions in regard to this unit, please feel free to call me at 1 -800- 824 -2614. I will answer any concerns you might have. Also, Chuck . Monschein with the Building Codes Agency is quite familiar with our shelters and the approval process. He can be reached at 503- 378 -3080. Once again, please feel free to call if you have any questions. Yours truly,,/ , _ 4 , d Romano State Certification Administrator cc: George Robertson, Cellular One Chuck Monschein, Building Codes Agency OR7 FIBREBOND CORPORATION 1300 DAVENPORT DRIVE • MINDEN, LOUISIANA 71055 • (318) 377 -1030 • FAX (318) 377 -5756 . • APPLICATION _ JR OFFICIAL INSIGNIA OR , TAMP OF APPROVAL • • ,f,. FOR PREFABRICATED STRUCTURE r State of Oregon � '44- > � Building Codes Agency INSTRUCTIONS Manufactured Structures and Parks Section Submit applications in triplicate. All fees must be submit - 1535 Edgewater NW, Salem, Oregon 97310 ted in full with this application. Make all payments by (503) 373 -1235 FAX (503) 373 -1014 check or money order made payable to the Building Codes Agency. Do not send cash. Replacement requests must be accompanied by a letter of explanation and proof of origi- Applicant: /ti ( 7 iz) L�r Mfr. No: ,(4//5 al Agency approval. Fees are not refundable. Mailing Address: /3CV 44, ' t4" ,1 '• City: / N State: l� Zip Code:7 /0,S j USE A SEPARATE FORM FOR EACH INDIVIDUAL STRUCTURE OR GROUP OF MODULES OR COMPO- Phone: g//3. fi17 /c Fax: ,....,7/ e -37/- 92O NENTS MAKING UP ONE STRUCTURE. DESIGN CRITERIA,- - . INSIGNIA \STAMP APPLICATION- . TYPE OF STRUCTURE: ❑ PERMANENT APPLICATION FOR: INSIGNIA ❑ STAMP I3 (See OSSC Chapter 50) 'RELOCATABLE V+ O COMPONENT APPLICABLE CODES: O 1 & 2 FAMILY MANUFACTURERS USE • AGENCY USE RrOSSC • ❑ OMSC SERIAL NO. FEE AGENCY NO: DATE BY ❑ OESC Mc -2 /M:6f ,5 . ❑ OPSC PLAN APPROVAL NUMBER Mika - 93 PLAN APPROVAL EXPIRATION 6,- - /7 - ►' NO. OF MODULES OR COMPONENTS / TYPE OF CONSTRUCTION (See OSSC Chapter 17 through 22) OCCUPANCY GROUP / - (See OSSC Chapter 5 through 12) n-`71 . DESIGN TEMPERATURE - (See OSSC Chapter 53) 40 °F • ELECTRICAL SERVICE LOAD .CO AMPS • FLOOR LOAD (Live Load) / 4 P.S.F. ROOF LOAD (Live Load) ,./C P.S.F. \t' WIND LOAD (Horizontal Wind Load) /GO M.P.H. WIND EXPOSURE: C3--"EXPOSURE B ,' (See OSSC Section 2311(c)) 0 EXPOSURE C . - ` t GAS TYPE: ❑ LP GAS ❑ NATURAL GAS . - I \ SEISMIC ZONE: 01 ❑ 2 ❑ 2b ❑ 3 GYM'- e„ Q N SIZE OF STRUCTURE: % , „ 2 7 Y . ' USE OF STRUCTURE: ESuI,4t1e7'7 d 7 INCOMPLETE SYSTEMS: 0 ELECTRICAL Nt)R "A(:N:N(Y litiF: ONLY (Submit a "Notification to O PLUMBING kkTi tk i Local Enforcement Agency" 0 MECHANICAL .INSIGNIA (831 - 244) • • >S %::: :- •• - .,,< <... :., ❑ STRUCTURAL STAMP (831 242) :':< `. • . $ � ^ ” `:' .., .'. form with this application) LOCATION OF !HST INSTALLATION: AGENCY ADJUSTMENT S • TOTAL FEE i S .... . V k OWNER/LEASEE: Ct- ZLUU•P'L. CelE PERMIT APPLICATION APPROVED:. ADDRESS: i&a.) SLi), 4 41/E . ' NO BY: C ity .) County State Q4' Zip 9 / 0 YES : ❑ • AGREEMENT: Applic • agrees that Oregon Insignias or Stamps will be affixed to all structures built, converted, sold, shipped to or installed in Oregd c th nict plumbing, mechanical, electrical, fire safety equipment. connections or installations of each structre bin an Oregon on an Insigertnia fy or that st- st p wil l be manufactured or installed in accordanc e with Oregon approv plans, st and rules. Appli consents ear to all necessary inspcc . +ins d fees incurred incidental to tlnissuance of Oregon Plan Approvals, Insignias or Stamps of Approval. Authonzed Si: . • re " ale or Position — Date _ ice • 6G -- - . 1 4 A. /OW. Oa& - 9i - Applications will not be processed without an authorized signature. • OCT -11 -94 TUE 10:00 5 rr 1- o '1 P.01 .- i3vPay -07) 2 3 MAR 12 '92 17:54 FROM OMEGA POINT LABS PAGE.002 • A O RAT March 12, 1992 Post -It"" brand l fax transmittal memo 767V*' ofpages ► / 1 To L /`C /C , ; / / From I�,a`filrfl�' James Romano co. , a co. 411Mr l ibrebond Corporation i Dept. Phone Minden, av port Drive [ J� � o / . "31 8 3 77 - 1y1[ LA 71055 Fax N w3 - d 6 - 1180 Fa # 34 371— e e2O p Re: Project No. 93059 AST! E119 Fire Test of Building Construction and Materials F ibrebond Precast Wall System Dear Mr. Raman: This letter will serve as an interim report of the E119 fire resistance test which we performed recently on your precast wall system, - consisting of a nominally 314° layer of epoxy - concrete over 2 inches of polyurethane foam, with a nominally 1- 114' thick layer of epoxy-concrete (with embedded aggregate) on the exterior and • with reinforced, cast columns and beams on the inside of the panel. The wall was received as a 10' x 10' assembly and was directly mounted into a masonry lied, restraining test frame. After being allowed to dry to equilibrium (lees than 75% r.h. within the wall), the wall was placed in front of our large scale E119 fire resistance wall furnace (with the interior side towards the flame, since that was the weakest side), instrumented with thermocouples and exposed to the • E119 time • temperature curve until failure by heat transmission. The wall was then removed from the furnace and exposed to the standard hose stream test, . which was successfully met. The test wall achieved a fire resistance rating of 102 minutes. A full report of this project will be issued following receipt of the final drawings of the wall interior. If you or anyone else has any questions concerning this or any other projects, . , please contact me at 1-500- 966 -5253. Sincerely, • . Deggary N. Priest President • 6888 /demo Dorms Parkway San Antonb, Texas 78238 • 61216476253 TELEX: 9102400828 SNOB UQ FAX: 5121 647.0815 From: Jack Kriz To: George Robertson Date: 10/10/94 Time: 17:46:20 Page 1 of 1 MILDREN DESIGN GROUP, P.C. ARCHITECTURE • SPACE PLANNING 11830 SW Kerr Parkway, Suite 325 Lake Oswego, OR 97035 503/244 -0552 Fax 244-0417 FAX TRANSMITTAL To: Cellular One Date 10/10/94 Cellular One Center Portland, Oregon FAX 248-7486 Attention: George Robertson Pro Name: Pfaffel Road Cell Site Project Number. 93085 Attached: _ calculation change order copy of letter details plans specifications X other Number of Pages: Description: Total pages sent 1 (including this transmittal) Remarks: Wanted to catch you in case my voice mail didn't. The UBC, section 1710 has exceptions to parapet requirements. Exception C, fits our situation, stating that when a building is less than 1000 sf per floor, no parapet is required Copy to: Signed Jack Kriz Hard copy to follow in mail