Correspondence (9) NOV -19 -96 TUE 04:09 PM CEI /MCH /TOUCHSTONENSTR.2 244 1308 P.02
5 n 9[0 — c/� / — / 1 0
• 8`3 7LP /'� 54-
R. G. NAFF, Designer
18641 SW. Bonfield Ave, Lake Oswego, Oregon 97035: 639.8045 Fax 639 -5377
November 16, 1996
Jim Funk, Plans Examiner
• City of Tigard
13125 SW. Hall Blvd.
Tigard, Oregon 97223
RE: Plan review dated November 15, 1996.
Dear Jim,
I have provided the revisions and details per your request in the above referenced plan review
and have listed them in the order of your review as follows:
ACCESSIBILITY
.Se the revised ramp railing detail on sheet S2 for added railing.
FIRE AND LIFE SAFTEY
ee new eaves detail on sheet D2.
2. of plans have always been shown on the second level floor plans for all apartment buildings
and main floor for the recreation building and garages. It is understood the truss plans, details
• and specifications will be a deferred application and will be reviewed and approved by Payton
Rowell, P.E. prior to submitting to the City for permit.
3. Seer _ • • : survey previously submitted.
•
NOV -19 -96 TUE 04:09 PM CEI'MCH'TOUCHSTONENSTR.2 244 1308 P.03
I '
STRUCTURAL
1. See revised section on sheet Dl.
I hope the above revisions and clarifications are of help to you in finalizing the review of this
project.
Should you have any questions regarding this matter please feel free to contact me at your
convenience.
Sincerely,
R. G. NO(.?-; igner
v5 `t ?7
�� Y- ?