Loading...
Correspondence (638) City of Tigard, Oregon • 13125 SW Hall Blvd. • Tigard, OR 97223 April 2, 2008 RE: NEW 5,044 SQ FT BUILDING T I GARD Proiect Information Building Permit: BUP2008 -00055 Occupancy B Tenant Name: Pacific Crossroads Type. of Construction: 5 -B Address: 7910 SW Pfaffle St. Occupant Load: 51 Area: 5,044 Sq. Ft. Stories: 1 The plan review was performed under the State of Oregon Structural Specialty Code (OSSC) 2007 edition; and the State of Oregon Fire Code (OFC) 2007 edition. Please respond to the following conditions prior to issuance of this permit: 1) Provide planning and engineering, approval for this project. 2) Provide sign off from structural plan review comments from Miller Engineering. , • • 3) Provide conditions for site plan approval. 4.) Please provide one half the maximum overall diagonal distance for separation of exits. OSSC .1015.2. When responding, provide an itemized letter stating in what way each numbered issue has been addressed in the revision. When submitting revised drawings or additional information, please attach a copy of the enclosed City of Tigard, Letter of Transmittal. The letter of transmittal assists the City of Tigard in tracking and processing the documents. • Respectfully, • 'Dan Nelson, Senior Plans Examiner (503)718 -2436 • dann @tigard -or.gov • Phone: 503.639.4171 • Fax 503.684.7297 • www.tigard- or.gov • TTY Relay: 503.684.2772 &Aw8-5 JOB NAME: Pacific Crossroads Corp. Center Building "B" CITY OF TIGARD JOB ADDRESS: -t9.6W Pfaffle ST., Tigard, Oregon 13125 SW HALL BLVD. DATE: April 1, 2008 "N to TIGARD, OR 97223 SHEET 1 OF 1 BUP2008 -00055 Project No. 080242 STRUCTURAL PLAN REVIEW # 2 Plans Dated 12/13/07 Corr. Item Page No. Comments Code Section Made No. 1 Sheet A1.2 Submit calculations and details for method 1405.5 Detail 9/A1.2 used to attach brick veneer to CMU. (Deferred Submittal) 2 Sheet A3.1 Submit Calculations and details for method 1405.5 Elevations used to attach brick veneer to wood studs. (Deferred Submittal) 4/1/08 3 Sheet S1.1 Submit foundation report dated July 10, 1802.6 Geotechnical Criteria 2007. 4 Special Inspection Special inspection is required for concrete, 1704, 1705, 1707, reinforcing steel, miscellaneous steel, bolts in 1708 concrete, epoxy and mechanical anchors add per sheet S1.0. 5 Structural Observation Structural observation shall be as indicated 1709 on sheet S1.0. 6 General Submit one set of reinforcing steel shop (Shop Drawings) drawings, which have been reviewed and initialed by the project engineer, to be filed with the City of Tigard before placement 7 General. Submit one set of glulam beam shop (Shop Drawings) drawings, which have been reviewed and initialed by the project engineer, to be filed with the City of Tigard before placement. 8 General Submit one set of engineered wood joist (Shop Drawings) shop drawings, which have been reviewed and initialed by the project engineer, to be filed with the City of Tigard before placement. 9 General Submit one set of miscellaneous steel shop (Shop Drawings) drawings, which have been reviewed and initialed by the project engineer, to be filed with the City of Tigard before placement. 10 General Submit one set of glazing system deferred (Deferred Submittals) submittal, which have been reviewed and initialed by the project engineer, to be filed with the City of Tigard before placement.