Loading...
Correspondence CONSULTING P 503.222.4453 E N G I N E E R S F 503.248.9263 E vlmk @vlmk.com 3933 SW Kelly Avenue • Portland • Oregon 97201 -4393 W www.vlmk.com 21,.4 X .Et,,, D FILE COPY City of Tigard Building Department 13125 SW Hall Blvd. Tigard, OR 97223 - Re: 8060 SW Pfaff le, Tigard, OR 97223 Permit No. BUP 2001 -00.45 Gentlemen: • In accordance with Section 1702 of the 1998 OSSC, this letter will serve as the final Engineer of Record Observation summary letter for the referenced project. VLMK Consulting Engineers has completed structural observations in accordance with thespecial inspection program as prepared by VLMK Consulting Engineers and submitted to the City of Tigard. VLMK Consulting Engineers has also reviewed the Special •lrispection Testing Reports as prepared by Carlson Testing. To the best of our knowledge, all work has been completed in accordance with permit approved drawings, specifications, and Engineer of Record directives. If you should have any questions, please do not hesitate to call. rely, 4 James E. Knauf, P.E. /S.E., Principal �`���� N Op i . VLMK Consulting Engineers �, . y ':/ . • •82PE . Cc: Michael Jones, LRS ,,/ - • -1/ • Eric Meeuwsen, Panattoni Const. / U :- "- 'Ceilson Tetirig.;..,`. .:. - 14 9 ,�0 0►. Q fi ' l:: °.M1 1 {: . t ` .l i _ .. . .t,t . .. 1 • • , .. P J , � . , 4 ' - . ` , !_::�; (: ') - . -•' .i? !, i,,; ••. :: ; :.�'. . �, • , rte .( C. :i.2ni1!L'_ E'. :-iii : I Structural Engineering • Civil Engineering • Industrial Engineering • Planning • Studies / Evaluations • Entitlement June 20, 2002 4 8 6 4,iph +\ CITY OF TIGARD Cameron Park Plaza OREGON 8060 SW Pfaffle St. Tigard, OR 97223 Cameron Property Development LLC 5665 SW Meadows Rd. . Suite 300 Lake Oswego, OR. 97035 Re: BUP2001- 00345, New 20,400 -sq. ft. office building (Shell Only) at 8060 SW Pfaffle To whom it may concern: This letter is to certify that all requirements of building permit #BUP2000- 00345, issued for a building shell, have been completed. The final inspection was performed and approved on 06- 10 -02, by inspectors from the City of Tigard. No tenant spaces are included in this permit, nor shall any tenant improvement be occupied until such time as each space is approved by final inspection of its specific permits, approved for the use intended and provided with a Certificate of Occupancy. The City neither guarantees nor warrants to the owner, occupant or any other person that this letter evidences strict and complete compliance with each and every ordinance or regulation of the City or the State of Oregon affecting the construction or use of said structure or the land upon which is situated. Such compliance is the responsibility of the owner and /or occupant of the premises. V This letter certifies only that the work covered under the permit number listed above has been completed. It is . not permission to occupy tenant spaces. Sincerely, 1 .7 0 4.\ Gary Lampella Building Official is Bldg /complltr 13125 SW Hall Blvd., Tigard, OR 97223 (503) 639 -4171 TDD (503) 684 -2772 09/27/01 THU 15:45 FAX 503 591 0986 TVWD ENGINEERING Iii] 001 • TualatinlValley District 1650 SW 170th Ave. • P.O. Box 745 • Beaverton, Oregon 97075.503/642 -1511 • FAX: 503/649.2733 Gregory , E DlLoreto General Manager Bernice Bagnall Chief Financial QBicer September 27, 2001 • Dale Fishback Manager, /vices ins & • Gary Lampella, Building Department Reid services '4 City of Tigard 13125 SW Hall Blvd • Brenda Lennox Tigard Or 97223 Manager. Customer g . .s. Support Services RE: Cameron Plaza, 8060 SW Pfaffle Street, Tigard, Or 9722 . Gary Pippin Manager, Engineering Services • The Tualatin Valley Water District has reviewed and approved the water service - to this development. Domestic service will be a 1 ' /2" meter and the fire. service will be a 6" service. 1 The developer's contractor has been given the District's standards for these improvements. All work will be done per the'Tualatin Valley Water District's standards. --1-3c-1-)-4-1 . . ' ,_ . Gary Pippin P.E. - . . Manager Engineering Services Post -Ir Fax Note 7671 D17 / l 8a°' / . To �p�g��� t F r. d- i • Phone # - - - Phone 903 . :r/2 `5 // • Fax # .0 0 .3 6,,_-7297 Fax #S,3 - S9/ c',96`. • Post -It Fax Note 7671 Date I re .. • • ' • • • To r.. 7 ,4 J From �/,�1 . Co./Dept . ' . Co: �v / vv. L) Phone # / i, v 2 5 o l - Phoneme #. /5. t/ • . Fax # L3 . z7i _ : Fa x 85 f03 - 2I 0986 0 . • . . . C of Tigard Bldg Dept.docJl:My Documents -Gary Pippin/'rSperry /0927/01 ' WATER - not to be taken for granted _ • — comp \ — i � v 2,0 -co3115 El CITY OF TIGARD OREGON November 15, 2001 Encompass Mechanical 5711 SW Hood Portland, OR 97201 Re: " Cameron Plaza — Permit # MEC2001 -00343 8060 SW Pfaffle Tigard, OR The City of Tigard has completed the review of the submitted plans for the mechanical installation at the above referenced address. This review was performed under the provisions of the State of Oregon Mechanical Specialty Code (OMSC), 1999 edition. The plans are approved subject to the following conditions. 1. Smoke detection shall be provided in the return-air duct of this system. OMSC Section 606. 2. The plans appear to show the ceiling as a return-air plenum. All materials installed in this return-air plenum shall meet the requirements of OMSC Section 602 or be plenum rated by testing. 3. The gas piping shall be tested to ensure that it is gas tight in accordance with OMSC Section 1304.18. 4. A copy of the approved plans shall be on the job site and available to the inspector for inspection purposes at all times. Sincerely, 1„.... Gary Lampella Building Official c. File 13125 SW Hall Blvd., Tigard, OR 97223 (503) 639 -4171 TDD (503) 684 -2772 RECEIVED Panattoni APR 03 2002 J I CO NSTRUCTION CITY OF TIGARD PLANNING/ENGINEERING April 3, 2002 Mr. Gary Lampella City of Tigard 13125 SW Hall Blvd Tigard, OR 97223 Re: Cameron Plaza Office Building BUP2001 -00345 Dear Gary, Attached is a copy of a February 13, 2002 letter regarding the Cameron Plaza Office Building and related tenant improvement. Darrel Jones has asked for the value of the second floor tenant improvement that was not completed, so the City could refund a portion of the permit and be able to provide a Certificate of Occupancy for the Building/Core work only. The value of the 2 floor tenant improvement work was $270,170. Please let me know if you need any more information. If you have any questions, please give me a call at 503- 345 -0647. Sincerely, Panattoni Construction Inc. nc Meeuwsen Project Manager cc: Kirk Cameron Panattoni Construction, Inc. 1400 SW Fifth Avenue, Suite 810, Portland, OR 97201 TEL 503/274 -4442 FAX 503/274 -5485 OR Lic #140755 Panattoni JI CON STRUCTION February 13, 2002 Mr. Gary Lampella City of Tigard 13125 SW Hall Blvd Tigard, OR 97223 Re: Cameron Plaza Office Building BUP2001 -00345 Dear Gary, I met with Darrel Jones regarding the above permit and discussed the revision to the 2 floor tenant improvements. The tenant that was originally taking the entire second floor has now decided to take one half of the first floor. The permit for the project includes both the Shell/Core and Tenant Improvement for the second floor. We are requesting that the City of Tigard take out the 2n floor tenant improvement from the permit, as we will only be completing the Shell/Core work and would want a certificate of occupancy for this work only. The Owner requests a credit for this 2 floor tenant improvement permit and understand they will not be reimbursed for the plan review fees and approximately 80% of the remaining fees. In addition we have submitted to the City of Tigard the plans for the first floor Tenant Improvement and request this work be permitted as a separate space. If you have any questions, please give me a call at 503- 345 -0647. Sincerely, Panattoni Construction Inc. nuwsen Project Manager cc: Kirk Cameron Panattoni Construction, Inc. 1400 SW Fifth Avenue, Suite 810, Portland, OR 97201 TEL 503/274 -4442 FAX 503/274-5485 OR Lic# 140755 CITY OF TIGARD • F ILE COPY R November 8, 2001 O EGON Michael Jones LRS Architects, Inc. 1121 SW Salmon, Suite 100 Portland, OR 97205 RE: CAMERON PLAZA PROJECT INFORMATION Address: 8060 SW Pfaffle Street Number of Stories: 2 Permit Number: BUP2001 -00345 Sprinklered: Yes Occupancy Group: B Fire Alarm: Yes Type of Construction: VN Rated Corridors: No Floor Area: 20,400 Sq. Ft. Rated Stairways: Stairway 110 — 1 -Hour Other Ratings: South & Part of West Wall See Sheet A0.2 The City of Tigard Building Division has reviewed the submitted building plans for the above referenced address in accordance with the Oregon Structural Specialty Code (OSSC), 1998 edition and the Uniform Fire Code, 1997 edition as amended by Tualatin Valley Fire & Rescue. The plans are approved subject to the following conditions. 1. Plumbing, electrical, mechanical, fire alarm and fire sprinklers will be by separate permit. Plumbing, fire alarm and fire sprinkler permits will be deferred submittals. Deferred submittals shall be reviewed by the engineer or architect of record prior to submittal to the City of Tigard to ensure that the plans are in general conformance with the design of the building. OSSC 106.3.4.2. 2. Deferred submittals identified on Sheet S0.0 shall be reviewed by the engineer of record prior to submittal to the City of Tigard for review. OSSC 104.3.4.2. 3. Special inspection as identified on Sheet S0.0 will be by Carlson Testing and structural observation will be performed by the engineer of record. Reports shall be sent to Hap Watkins, Inspection Supervisor at 13125 SW Hall Blvd., Tigard, OR 97223. Any discrepancies shall be brought to the immediate attention of LRS Architecture. Final signed reports shall be submitted to the City of Tigard Building Division in accordance with OSSC 1701.3 13125 SW Hall Blvd., Tigard, OR 97223 (503) 639 -4171 TDD (503) 684 -2772 • • • 4. Special inspection required by OSSC Chapter 17 is in addition to the inspection required by OSSC 108. Special inspectors shall leave field copies at the site for review by the. City of Tigard inspectors. Any discrepancies shall be brought to the immediate attention of the contractor for correction, then, if uncorrected, to the proper design authority and to the building official. OSSC 1701.3. • 5. Fire - resistive assemblies shall be maintained and all penetrations through such assemblies shall be protected'with penetration firestops in accordance with OSSC 709.6 through 709.7 and 714. 6. The fire -rated doors into Stairway 110 shall have closing actuation in accordance,with OSSC 713.6.1. • 7. Exits signs shall be internally or externally illuminated at all times and shall have an • emergency power source. OSSC 1003.2.8.4 and 1003.2.8.5. 8. The means of egress shall be illuminated at an intensity of not less that 1 foot -candle at the floor level. This lighting shall have backup power from an automatic emergency system in the event of a power failure. OSSC 1003.2.9.2. 9. Exit doors shall be openable from the inside, without the•use of a key or any special knowledge or effort. OSSC 1003.3.1.8. 10. Stairways and handrails shall comply with the provisions of OSSC 1003.3.3.1 through 1003.3.3.7. - 11. Accessible parking shall be installed and signed in accordance with OSSC 1104.1 and ORS 447.233. 12. Handles, pulls, latches, locks and other operating devices on doors, cabinets, plumbing fixtures and storage facilities shall have level or other shape permitting operation by wrist or arm pressure and not require tight grasping; pinching or twisting to operate. OSSC 1109.3.1. 13. Mounting heights for environmental and other controls, dispensers, electrical and communication equipment system receptacles on walls and other operable equipment shall be within at least one of the reach ranges specified in Section 1109.2, and not less than 36 . inches above the floor. OSSC 1109.3.2. 14. Floor coverings and surfaces shall comply with OSSC 1109.6 for accessibility. . 15. Stairways shall comply with OSSC 1 -109.8 for accessibility. • y . 16. Doors shall comply with the requirements of 1109.9 for width, maneuvering clearances, thresholds, closers, hardware and opening force. The opening force for exterior doors shall not exceed 8 V2 pounds and interior door 5 pounds. 17. Minimum 2A,10BC fire extinguishers shall be provided throughout the building so the travel distance between extinguishers does not exceed 75 feet. UFC Standard 10 -1. 18. A copy of the approved plans shall be on the job site at all times and available to the City of Tigard inspectors for inspection purposes. OSSC Section 106.4.2. 19. A final inspection and Certificate of Occupancy is required prior to occupying for the intended use of this building or parts thereof. OSSC Section 109.1. If you have any questions regarding this review, please contact me at (503) 369 -4171 ext. . Sincerely, 1 Gary Lampella Building Official c. Kirk Cameron, eei Solutions — Fax (503) 297 -9166 Jeanne Neimer, P.E., Carlson Geotechnical — Fax (503) 670 -9147 Eic Meeuwsen, Panattoni Construction — Fax (503) 274- 5485 Hap Watkins, Supervising Inspector Building Inspectors File