Permit - 1 , 1
CITY OF TIGARD
D i, a ,. DEVELOPMENT SERVICES BUILDING PERMIT
° PERMIT # • BUP97 -0288
= 13125 SW Hall Blvd., Tigard, OR 97223 (503) 6394171 DATE ISSUED: 06/03/97
PARCEL: 2S1O3DA -03900
SITE ADDRESS...: 10900 SW PARK ST
SUBDIVISION • ZONING:R -4.5
BLOCK • LOT • JURISDICTION:TIG
REISSUE: FLOOR AREAS EXTERIOR WALL CONSTRUCTION —
CLASS OF WORK.:DEM FIRST • 0 sf N: S: E: W:
TYPE OF USE...:SF SECOND...: 0 sf PROTECT OPENINGS?
TYPE OF CONST.:NONE .... 0 sf N: S: E: W:
OCCUPANCY GRP. :NONE TOTAL 0 sf ROOF CONST: FIRE RET ?:
OCCUPANCY LOAD: 0 BASEMENT.: 0 sf AREA SEP. RATED:
STOR.: 0 HT: 0 ft GARAGE...: 0 sf OCCU SEP. RATED:
BSMT ?: MEZZ ?: REQD SETBACKS REQUIRED
FLOOR LOAD • 0 psf LEFT: 0 ft RGHT: 0 ft FIR SPKL: SMOK DET..:
DWELLING UNITS: 0 FRNT: 0 ft REAR: 0 ft FIR ALRM: HNDICP ACC:
BEDRMS: 0 BATHS: 0 IMP SURFACE: 0 PRO CORR: PARKING: 0
VALUE. $ : _ 0
Remarks: t Demolition Pf garage, not attached to a sewer or septic system. All
debris to be removed: --
Owner: FEES
DENNIS WANLESS type amount by date recpt
10900 SW PARK PRMT $ 25.00 DRA 06/03/97 97- 295374
TIGARD OR 97223 5PCT $ 1.25 DRA 06/03/97 97- 295374
EROS $ 26.00 DRA 06/03/97 97- 295374
Phone #: ERPC $ 8.45 DRA 06/03/97 97 -295374
ERPC $ 8.45 DRA 06/03/97 97- 295374
Contractor:
OWNER
Phone #: 639 -4171 X370 $ 69.1.5 TOTAL
Reg #.. : 000131
REQUIRED INSPECTIONS
This permit is issued subject to the regulations contained in the ,c/,fj¢ C. /A15/
Tigard Municipal Code, State of Ore. Specialty Codes and all other
applicable laws. All work will be done in accordance with
approved plans. This permit will expire if work is not started
within 180 days of issuance, or if work is suspended for more
than 180 days.
Permittee S' . ■ -tore: ,�0,2 ,' 1,� 1 11/1;
Issued By A. .�
0. 44 _ ' .
Call for inspection — 639 -4175
rd
' Commercial Building Permit Application
•
City of Tigard 131:5 SW Hall 8Ivd. Tigard. OR 97223
5 639.4171
7 ,q�
Jobsite Address: /"9 ) h OFFICE USE ONLY
Tenant: Suite # Planck/Rec. # :" •
• Valuation:.:. ;` ;� . .
• Permit # "'at
Jt• 4 . •
J / Map A TL #- '? • a� a:z „ >,:;,.:,. $ . • - ....
Owner. / ,t-',i / /A . S .. ...... . . •
royals :...'''.'X' .: 's ' , ::.,:;: . ..
address• App
Required:.; ;`:: ° >: >: 's : :: ;; `:::: : `..` .
Planning tv aw : ... ■
- 7 - / 44 )4.-J--- G`ie.
.Eng , „ ', -. • :- < ; . ;: w , , > v; { •
elephone: 427-1-1 -q 3 07
•• Other ' ... ....; , .:.,..:.3',.? w .. > > ": ::. ?''`' : „' •;; »:' : ~::,:µ
contractor. d' iV, J 7 L
■ddress: -
Type of constr:
ilephone: Occupancy Class:
•
.:ontractor's License # • Sprinkler? Yes No
(attach copy of current Oregon license)
/ j i
Sq. Ft Of Project
':ontact name & telephone: 4../ l,& s$
�`�_/ X07 Story (1st, 2nd, etc.):
rchitect & Engineer:
Proposed Use:
.ddress:
Previous use:
Note: Plumbing & mechanical plans must
elephone: be submitted at time of building permit
application.
18 DESCRIPTION :: i.A -1 0 E). ► � )..) Lj r2 1+ 3 A LL - %i_ b t S TD
_`z. ��MoJ_,_ ,
ioi,i,, . /ZZ . (itc.P-.,,,c1.______ Zg :S 7
(Applicant Signature & Telephone Number)
;eived by: .,e Date Received: �-f - -C J
: • :. n.ccc ;CST . i
E RMITS Account Description Amount Amt Pd. Balance Oue
Building Permit (BUILD) 00
Plumbing Permit (PLUMB)
Mechanical Permit (MECH)
State Tax (TAX) 1' a
Bldg.
Plumb.
Mech.
Plan Check • • (PLANCK)
Bldg. - _
Plumb.
•
Mech.
Sewer Connection (SWUSA)
Sewer Inspection (SWINSP)
Parks Dev Charge (PKSOC)
Residential TIF (TIF -R)
•
Mass Transit TIF (TIF -MT)
Commercial TIF (TIF -C)
Industrial TIF (TIF-1)
Institutional TIF (TIF-1S)
Office TIF (TIF -0)
Water Quality (WQUAL)
Water Quanity (WQUANT)
Fire Life Safety (FLS)
Od
Erosion Cntrl Permit (ERPRMT) a(p�
Erosion Planck/USA (ERPLAN) C �
Erosion Planck/COT (EROSN) O ' S
TOTALS: (.79'
I:'ccMTi.ccc (CS') 10/96
6/6/00 Activities for Case #: BUP97 -00288
2:50:53 PM •
•
Assigned Hold Updated
Activity Description Date 1 Date 2 Date 3 To Done By Disp. Level By Updated Notes
BUPA005 Application received 6/2/97 DRA RECD DRA 6/3/97 Computer was down, not able •
to issue over - the - counter. •
• Applicant requested that permit
• • be mailed when issued.
BUPA010 Permit created 6/3/97 DRA PASS DRA 6/3/97
BUPA870 Final Inspection . 7/2/97 TLP PASS J *H 7/6/97 •
•
BUPA085 (F) Issue building permit • 6/3/97 DRA PASS DRA 6/3/97
BUPA940 Permit Finaled (No CO.req'd.) 7/2/97 TLP PASS J`H 7/6/97 garage without plumbing
. approved
BUPA950 Case Finaled 7/2/97 TLP PASS J'H 8/18/97.
•
•
•
•
•
•
•
•
•
•
•
•
•
•
• Page 1 of 1 • • •
•
15 -4, oO t= i.. .
•
% CP : - in ' g
4 EN ERGY PATH 1 9/9\ C • . ��u A NEW ADDITION DWELLING AREA SHALL COMPLY WITH -- 0
ENERGY PATH 1 REQUIREMENTS. ALL GLASS IN co
WINDOWS AND DOORS SHALL MEET U.40 MINIMUM.
` INSULATION SHALL BE R -38 IN ATTIC, R -21 IN EXTERIOR Q. C N N
WALLS, AND R -25 IN RAISED FLOOR SPACE WITH CV r Oi cc,
a 00 E Q„ o
a CO EXTEROR EXPOSURE. .
o c� 4 1 c ),
:§ al N r
r
> > v4, z 8 � 6 ,
_ > �n 3v as cc
(� o Q ■ J
.2A u. a_. /A I c
713-CZ C
o
C a)
o � c �'� O R� � r
a o a ..ti c9' (A r
elm -o NG Q= il- U
o: • - • o
6
I
o
0 0
o
c-i Li
. 1-- -.,- -- E l 0-Di +
.. • • 1 , , ,
N 6�L1 a-�c� PEW
I I to J
£E-1 -*
. a
e-,4 15 - t i c>
HoU
• I
. 1 5 PT.
S li- 4— ---,
• !JEW IDEcK -
♦ -
0
. _ r
. . I . oo' I'. L.
.: 1 Q .
A ei
c t 10 9 oo . SW rArzK S-r.
• SITE PLAN 1"-- 20 d , 0.5;nti; 6.c/7Rei_ /k v
0 a
■� c
PROJECT INFORMATION co N
ROOM ADDITION FOR . g 6 c
Dennis Wanless a. CC L
' 10900 SW Park Street Z CO 65 c
Tigard, OR 97223 c
(503) 624 -9307
•
Q � c °-.,
LEGAL Q > o
Parcel 2S13DA -03900 Q = .. >
ZONING 1
R-7 Fs • c 0`
R g �, o
.:
RESIDENCE C Cl r F
•
Existing Floor Area 1,207 sq. ft.
New Addition Floor Area 390 sq. ft.
Total Floor Area 1,597 sq. ft.
- New Covered Deck Area 192 sq. ft. 1
• • New Garage 360 sq. ft.
. , \ •
CITY OF TIGARD BUILDING INSPECTION DIVISION
24 -Hour Inspection Line: 639 -4175 Business Phone: 639 -4171 I
Date Requested: 74 7 d -- I
eq I / [ 7 A.M. P.M. MST:
Location: /() ) Pa l JC„ v BUP: - 1 7- cD...
Tenant: . Suite: Bldg: MEC:
Contractor: MitAto nldt".6A...4j ( ?) Phone: _/ _j0 7 PLM:
Owner: Phone: ELC:
g /�� fll , _ .. .ai — i , I ' k r ( ELR:
/ / SIT:
BUILDING BLDG (can't) PLUMBING MECHANICAL ELECTRICAL SITE
Site Post/Beam Post/Beam Post/Beam Cover /Service Sewer /Storm
Footing Roof UndFUSlab Rough -In Ceiling Water Line
Slab Framing Top Out Gas Line Rough -In UG Sprinkler
Foundation Insulation Sewer Hood/Duct Reconnect Vault
Bsmt Damp Drywall Storm Furnace Temp Service MISC.
Masonry Ceiling Rain Drain A/C UG Slab
Shear /Sheath Fire Sed_r/Alm Crawl/Found Dr Heat Pump Low Volt
Approv Approved Approved Approved Approved
Appr /Sdwlk roved Not Approved Not Approved Not Approved Not Approved
FINAL FINAL FINAL FINAL
O Call for rein o / O Reinspection fee of $ required before next inspection O Unable to inspect
ed
Inspector: Date: 7 V 2 — ne / 7 Page of