Permit Page No. 1 CASE HISTORY FOR CASE NO.: MST97 -0399
BOWEN DEVELOPMENT
11374 SW PAL14 PL Unit: C5
12/01/97
•
Action Description Reg/ Schd/ End/ Action Notes Disp By Update Upd
Code Sent Done Done Date By
-- -- - -- -- - --- -- ---
MSTB008 Permit created / / / / 09/29/97 ADMN JMH 09/29/97 J *H
MSTB092 (F) Issue combination permit / / / / 09/29/97 ADMN JMH 09/29/97 J *H
MSTB700 Erosion Control Insp 844 -8444 / / / / / / 09/29/97 J *H
MSTB789 Smoke Detector / / / / / / 09/29/97 J *H
MSTB799 Building Final / / / / 09/29/97 1. Rain drain disconnected at front, FAIL RB 09/29/97 J *H
etc.
2. Wheatheretrip front door at garage.
3. Enclose soffit at front.
4. Seal joint of range vent.
5. Fireplace inoperative.
6. AC Unit not installed.
7. Tempered glazing required at master
bedroom adjacent to living room slider.
8. Enclose soffit at exterior.
9. 6 -inch wood /ground contact.
MSTB799 Building Final / / / / 10/07/97 Building issues as per 09/29/97 RB, FAIL RB 10/10/97 ROC
Issue incompleted, 2, 5, 6.
( #2- weatherstrip garage door,
#5- fireplace inoperative, #6- electrical
approved for AC and trap condensation
line.)
MSTB799 Building Final / / / / 10/10/97 needs san sewer approval FAIL RB 10/29/97 J *H
MSTB800 Final inspection 09/29/97 / / / / - 09/29/97 J *H
MSTB950 (F) Issue Cert.' of Occupancy / / / / 10/31/97 10/31/97 JT
•
•
i_st 7 Vc4.-- S
CITY OF TIGARD BUILDING INSPACTION DIVISION
24 -Hour Inspection Line: 639 -4175 Business Phone: 639 -4171
Date Requested: /0-1O-9'
equested: G 3 2 ( 0 -/O - 7 7 A.M. P.M. MST: q 7 -63 f 7
l �
Location: 37 / Pod rn / BUP:
Tenant: Suite: Bldg: C5 MEC:
Contractor: 4 . dli /_ I /_ A d _ j / Phone: 5 79— SOS PLM:
Owner: / Phone: ELC:
ELR:
_ SIT:
BUILDING BLDG co 1 ' PLUMBING ' AL ELECTRICAL SITE
Site Po r :earn Post/Beam '0 • : y Cover /Service Sewer /Storm
Footing Roof UndFl/Slab Rough -In Ceiling Water Line
Slab Framing Top Out Gas Line Rough -In UG Sprinkler
Foundation Insulation Sewer Hood/Duct Reconnect Vault
Bsmt Damp Drywall Storm Furnace Temp Service MISC.
Masonry Ceiling Rain Drain A/C UG Slab
Shear /Sheath Fire Spklr /Ahn Crawl/Found Dr Heat Pump Low Volt
Approv Approved Ap ro Approved Approved
Appr /Sdwlk ;, : _ Not Approved of • •,j •roved Not Approved Not Approved
FINAL FIN • FINAL FINAL
S-e•e_ L —\ `}- tom s . .'s s 1 .
11 for reinspection O Reinspection fee of $ required before next inspection O Unable to inspect
r ` !
Inspector: Date: l� 1 b / Page of /
1 CITY OF TIG,WBUILDING INSPECTION DIVISION
24 -Hour Inspection Line: 639 -4175 Business Phone: 639 -4171
•
Date Requested 9 -Q- 97 A.M. P.M MST: 96-0/11r
(}/I1r
Location: 5C—UST– BUP:
Tenant SLIMME12.&CCE) Suite: Bldg 5 MEC:
Contractor. iD ///t ST s i - t 6 Phone: 393 -..1. 03 PLM:
Ow ner Phone: ELC:
(TI-NS i 5 CO ad reD 4-5 ON e /AJSPEC- 77v ELR:
/ WO /T A-L.,E? E 4 f v E'1 SIT':
BUILDING BLDG (con't) PLUMBING MECHANICAL CT SITE
Site Post/Beam Post/Beam Post/Beam ce Sevier/Storm
Footing Roof UndFl/Slab Rough -In Ceiling Water Line
Slab Framing Top Out Gas Line Rough -In UG Sprinkler
Foundation Insulation Sewer Hood/Duct Reconnect Vault
Bsmt Damp Drywall Storm Furnace Temp Service MISC.
• Masonry Ceiling Rain Drain A/C UG Slab
Shear/Sheath Fire Spklr /Alm ' Crawl/Found Dr Heat Pump Low Volt
Approved Approved Approved A Approved
Appr/Sdwlk Not Approved Not Approved Not Approved 1'7a Not Approved
FINAL FINAL FINAL 1 • . FINAL
9 -'k , ibr 43 — 113 6 9 S•60 S /V0 A E/3D
y
•
OD 1 r4/ - 1/37/ - )VC 7 Ar-4D y -
IX L T 4L5 - 1137 51. s t A) Pan. /L r'rn t -- 13.4Px a vc.)
CA „ / P i F , /) A " PAD VE2) -
0 ti 4 '_ I PJ - / AM- L A WAIVED-- Q
70- zD
D Call for reinspection pspection fee of $ uired before next inspection 0 Unable to inspect
Z --q I ns p ector. Date: 9 sp
/ ` Page of :
qUNIT5 Or /0 ebti/r
-
Cm D y 1:3410-
CITY OF TIGAI'21 BUILDING INSPECTION DIVISION
24 -Hour Inspection Line: 639-4175 Business Phone: 639 -4171
Date Requested: 6 7 — 4aQ—. 6 17 A.M. P.M MST: 96-OHS'
Location: BUP:
Tenant SUJfl/r1 E/CuJC Suite: Bldg: - MEC:
Contractor. ED Phone: -3 93 ^ca3 PLM:
Owner Phone: ELC:
ELR:
`�� _ SIT:
BUILDING BLDG (con't) PLUMBING MECHANICAL - SITE
Site Post/Beam Post/Beam Post/Beam Co ' : '. - Sewer /Storm
Footing Roof UndFI/Slab Rough -In Ceiling Water Line
Slab Framing Top Out Gas Line Rough-In UG Sprinkler
Foundation Insulation Sewer Hood/Duct Reconnect Vault
Bsmt Damp Drywall Storm Furnace Temp Service MISC.
Masonry Ceiling Rain Drain A/C UG Slab
Shear /Sheath Fire Spklr /Alm Crawl/Found Dr Heat Pump Low Volt
Approved Approved Approved roved Approved
Appr /Sdwlk Not Approved Not Approved Not Approved Yed Not Approved
FINAL FINAL FINAL FINAL l FINAL
4 0 / . c.ar g I /3d 4 P Fi tiA -L t�-dP na L/ .0 Prn,r A/4
Li -, - k G .t- 2 - . , S' , 4 0 X- ,o i S
V 2-Or i/9 1/38 4,1_47L. 19�. F t A719 -L ti,,GAZ v,1'
1 . 0 4 - 1 . : A / 0 ) NG /iV ST/3 -L.1 L -T / /%/ D/ AD )t r cT.5 -7 /0!_...As'
N A. L L A U r L TS' Ttfol- r ,o n A/07 Co.1D2/ Lif irEf - 326' d
01--6 r 50 // 35 &.'i_. 1"� Al1// -1- L 1)-ePR a vEn
) EL' J . dL/ C /' • — r
C' r 5/ UU 385 pa.Q p.- - Ff,VR L f440Ra (E
( Ds'ND/ - co it- Mr ' w /7`tl . 370- -D
o Call for reinspection einspection fee of $ required before next inspection O Unable to inspect
Inspector. Date: Page of
5-a.//14.h. .
CITY OF TIGARD BUILDING INSPECTION DIVISION
24 -Hour Inspection Line: 639 -4175 Business Phone: 639 -4171
Date Requested
i ' ' �� � P.M. MST: 9('�
Location _�.t�. BUP:
Tenant: Suite: 1 Bldg: 5 MEC:
Contract° 4, JjI / _I 4:. 1.L J l Phone: 5 / 9 - >SOS - PLM:
Owner. : /� / / . l e ✓ Phone: ELC:
ELR:
SIT:
BUILDING BLDG (con't) < PLUMBING ' MECHANICAL ELECTRICAL SITE
Site Post/Beam Post/Beam Post/Beam Cover /Service Sewer /Storm
Footing Roof UndFl/Slab Rough -In Ceiling Water Line
Slab Framing Top Out Gas Line Rough -In UG Sprinkler
Foundation Insulation Sewer Hood/Duct Reconnect Vault
Bsmt Damp Drywall Storm Furnace Temp Service MISC.
Masonry Ceiling Rain Drain A/C UG Slab 7
Shear /Sheath Fire Spklr /Alm Crawl/Found Dr Heat Pump Low Volt
Approved Approve Approved Approved Approved
Appr /Sdwlk Not Approved - . - •• . ved Not Approved Not Approved Not Approved
FINAL FIN • FINAL FINAL FINAL
/'!/ T , ' ✓Z7 , _ �A / LL Ad ! /I /II 3
�/ Wri
r•0 //37. i. J/ _ -- .
5 — i 3 : 7 _ _ _ _ 3 ( . 0 — _ _ , P , - , P , ;-
-C //1371 c .7 Y
e, y115 78' SW ff j j/ L/ 7
4 _1.11.11,1"11r,Arr.e....-41111111FL., .
, I , ..... AiM A - --' ' ••`" " '''''
_ / 0. 'ma . 1 ANA _.■1.! i . 7 1 49‘° ' k . Ctr
l
1
. p , ., - l
/
O Call : r,'. pectio - = Reinspecti. f of $ required before newt inspection O Unable to inspect
ji
Inspector -L . _ _ ate: �� / Page of
CITY OF TIGARD BUILDING INSPECTION DIVISION
24 -Hour (Inspection Line: 639 -4175 Business Phone: 639 -4171
Date Requested: l D — /0 — 7 l A. M. P.M. MST: 4 / - 6 (Ai/ Location: 43 9 SbV ..574 4 f 4J QL-C BUP:
Tenant: Suite:: � - MEC:
Contractor _ S / , ,e4 Phone: 5— 3 F-s- PLM:
Owner: Phone: ELC:
ELR:
SIT:
BUILDING L iB n't) PLUMBING MECHANICAL ELECTRICAL SITE
Site eam Post/Beam Post/F3eam Cover /Service Sewer /Storm •
Footing Roof UndFl/Slab Rough -In Ceiling Water Line
Slab Framing Top Out Gas Line Rough -In UG Sprinkler
Foundation Insulation Sewer Hood/Duct . Reconnect Vault
Bsmt Damp Drywall Storm Furnace Temp Service MISC.
Masonry Ceiling Rain Drain A/C UG Slab
Shear /Sheath Fire Spklr /Alm Crawl/Found Dr Heat Pump ' Low Volt
pproveD Approved Approved Approved Approved
Appr /Sdwlk Not A p Not Approved Not Approved Not Approved Not Approved
FINAL FINAL FINAL FINAL
t 4 a Ste ��� L — 7 ?— ova i C- / K-SS
1 1 - S 2 s . 1 . 1/4-v. a. (9 -a 3 5,) C - Z PA_ S e
1 l " t7 t 1/4..A 1/4,-. PL, Cg) -o 39,) C_ 3 PA- SC
113cr I P .,..., C? l,. (_?-03”) b- / PASS
t I3 rc) Pte, s -. (g7 -a3q .k) 0 mss
1I, 3 - 1g Qom• el...... (M7 -03g3) D--3 PL
t V `"i (, () t.....A,". PL . (q7 - o Yoe) C - Pa.SS
1 1, 314 P-A,.� w• 2 1. C'7 -0 3°I q) c- s" Pis s
1 t 3l 1 sv J Li..y,r,,o,r (-D— 039 C - (p Pmss S
t t -pct S (— 0 / i g) ')— y Pots&
de
A .MPALIPIP.''..., - i&e:(7/11/- . .
owe" A "
Il Call for reinspection O Reinspection fee of $ required before next inspection 0 Unable to inspect
Inspector: `` R C Date: / 6/ d / / Page / / of / /