Permit s
Page No. 1 CASE HISTORY FOR CASE NO.: MST97 -0393
BOWEN DEVELOPMENT
11378 SW PALM PL Unit: D3
12/01/97
Action Description Req/ Schd/ End/ Action Notes Disp By Update Upd
Code Sent Done Done Date By
MSTA700 Erosion Control Inep 844 -8444 / / / / / / 09/28/97 J *H
MSTB008 Permit created / / / / 09/28/97 ADMN JMH 09/28/97 J *H
MSTB092 (F) Issue combination permit / / / / 09/28/97 ADMN JMH 09/28/97 J *H
MSTB790 Fire Alarm Inep / / / / / / 09/28/97 J *H
MSTB796 Electrical Final / / / / 09/22/97 PASS BRP 09/28/97 J *H
MSTB797 Plumb Final / / / / 09/15/97 PASS RAB 09/28/97 J *H
MSTB798 Mechanical Final / / / / / / • 09/28/97 J *H
MSTB799 Building Final / / / / 09/29/97 Connect rain leader between units FAIL RB 09/29/97 J *H
D3 /C4, also front sidewalk.
2. Gas meter not installed.
3. Garage step > 8- inches in height.
4. Seal range vent connectors
w /3- screws.
5. Fireplace inoperative.
6. Drywall cover missed at garage side
wall.
7. Enclose soffit at exterior.
8. 6 -inch wood ground contact.
MSTB799 Building Final / / / / 10/10/97 Needs san sewer approval. FAIL RB 10/29/97 J *H
MSTB800 Final inspection 09/28/97. / / / / 09/28/97 J *H
MSTB950 (F) Issue Cert. of Occupancy / / / / 10/31/97 . 10/31/97 JT
•
. Jet 41 - 6-ad 5
. .
CITY OF TIGARD BUILDING SPECTION DIVISION
24 -Hour Inspection Line: 639 -4175 Business Phone: 639 -4171
Date Requested: 16 A.M. P.M. MST: 97-0 3?3
Location: I I'3 7 8 F ,,// -rY, Pi BUP:
Tenant: Suite: Bldg: D 3 MEC:
Contractor: C., / f 4 O , Al L. / Phone: 5 7 9- 3s 8 S PLM:
Owner: ' Phone: ELC:
ELR:
SIT:
BUILDING BLDG ("Pi 't) PLUMBING CHANI AL ELECTRICAL SITE
Site Post/Beam Post/Beam Po eam Cover /Service Sewer /Storm
Footing Roof UndFl/Slab Rough -In Ceiling Water Line
Slab Framing Top Out Gas Line Rough -In UG Sprinkler
Foundation Insulation Sewer Hood/Duct Reconnect Vault
Bsmt Damp Drywall Storm Furnace Temp Service = MLSC.
Masonry Ceiling Rain Drain A/C UG Slab
Shear /Sheath Fire Spklr /Alm Crawl/Found Dr Heat Pump Low Volt
Approv =• Approved • pprov -• Approved Approved
Appr /Sdwlk • • • • 'roved Not Approved 2 ved Not Approved Not Approved
FINAL 1 FINAL FINAL
7 .... 4 2-...R-- ..— \ C,CA-__Q9. 4" g 1-eie -.. - I-5 S - 1/4,4.--(t (. ..
Call for reinspection 0 Reinspection fee of $ required before next inspection 0 Unable to inspect
Inspector: Date: 1 b/ ( A� Page VG of
�I
i ezeir &�
CITY OF TIGARD INSPECTION DIVISION
24 -Hour Inspection Lme: 639 -4175 Business Phone: 639 -4171
• Date Requested: 9 — .P-a - 97 A.M. P.M. MST: 96 0//,'
Location: 5e& Lts`7"' BUP:
Tenant SUM ME?Z&C0D Suite: . Bldg 5 MEC:
Contractor. et) /frn esi4TE _ Phone: 393 —a a a3 PLM:
Owner Phone: ELC
(71-HS I6 GOuNTTD ,4S O/J e /CUSP E-77(, ELR:
/ GA) /T A- L,E?EA0 V F1�, 3 SIT:
BUILDING BLDG (con't) PLUMBING MECHANICAL LECTRIC SITE
Site Post/Beam Post/Beam Post/Beam ce Sewer /Storm
Footing Roof UndFl/Slab Rough -In Ceiling Water Line
Slab Framing Top Out Gas Line Rough -In UG Sprinkler
Foundation Insulation Sewer Hood/Duct Reconnect Vault
Bsmt Damp Drywall Storm Furnace Temp Service MISC.
Masonry Ceiling Rain Drain A/C UG Slab
Shear/Sheath Fire Spklr /Alm Crawl/Found Dr Heat Pump Low Volt
Approved Approved Approved • .,.,.. .. Approved
Appr/Sdwlk Not Approved Not Approved Not Approved • v Not Approved
FINAL FINAL FINAL 1 • FINAL
9 -A ,C,tT 43 - //369 /VDY- R EA.D
y
6/ 467'44 - 1/371 SG/J — /VD 7 A l=�4D —
� y
4 OT4L5 - /l
AL -
-`� M = .. di / 402,6 F/ , /�- I-- , - a vED —
c
1 %J)nir- - 3,70- 0
d e . . .--.4 ...a IV P1 -- / A4 L A PP(V UED - 04
70 -,ZL7
0 Call for reinspection pspection fee of $ uired before next inspection 0 Unable to inspect
--/7, ^�
Inspector. Date: 2 - 7 Page/ of rQ�
44 ._____ a
- cor y.- Clu,�t1 /T5 or - o elivi -
Co9 xO .eux—
CITY OF TIGA b BUILDING INSPECTION DIVISION
24 -Hour Inspection Line: 639 -4175 Business Phone: 639 -4171
Date Requested q cD-�' / 7 A.M. P.M. MST: FL - oll0
Location: BUP:
Tenant SUJ)I /Yl EJtl.CV OOD Suite: Bldg: �� MEC:
Contractor. Eb phone: "3 93 ^ca3 PLM:
Owner: Phone: ELC:
ELR:
SIT:
BUILDING BLDG (con't) PLUMBING MECHANICAL LECTRICAL SITE
Site Post/Beam Post/Beam Post/Beam Co Sewer /Storm
Footing Roof UndFl/Slab Rough -In Ceiling Water Line
Slab Framing Top Out Gas Line Rough-In UG Sprinkler
Foundation Insulation Sewer Hood/Duct Reconnect Vault
Bsmt Damp Drywall Storm Furnace Temp Service MISC.
Masonry Ceiling Rain Drain A/C UG Slab
Shear/Sheath Fire Spklr /Alm Crawl/Found Dr Heat Pump Low Volt
Approved Approved Approved ved Approved
Appr /Sdwlk Not Approved Not Approved Not Approved . • ed Not Approved
FINAL FINAL FINAL FINAL FINAL
'0 .-0r- / I /380 PaiA7 _ PJ F/A/A- L 130 Rave .6 PiEnzi AI C
4, i-i IR D /-= 2 - MA/K S41, DX- (J4s7 /A S
" O A 2 - 0 T 1q / 138/ A v e z , L P te , P 1 / /11- L 14,PAD & iY
P2 A/L )NG / AvST/i-L,L4-r /nA/ Dom' ,Qe Z T:=A402 A S
/ A/ A- L L / v rs 7 T n n A/07" Co,yI2/ 4iIrl/ - 370 d
C' r .5 // 3S 3 Pali_ Pi., A/v L- A-PPR a v,E
P A J . . L. off/ , , C 1' • — r
Ci r 3/ /085 pain- P.L. — F /109-L, /4PPRa l JE.O
(&'No / A/ G - Co if-t ,O )Y uJ/ ny . 57O - -- D
0 Call for reinspection einspection fee of $ required before next inspection 0 Unable to inspect
Inspector. Date: Page CZ of
•
/ � ' �,
CITY OF TIGARD BUILDING INSPECTION DIVISION
24 Hour Inspection Line: 639 -4175 Business Phone: 639 -4171
Date Requested: - 7 P.M MST:
96 1e
4
Location: / BUP:
—
Tenant: � Suite: Bldg: 5 MEC:
Contracto 4, All / _4 44 . LA --11 Phone: 5 / 9 - 355 PLM:
Owner. L ����. /Iie /'!�! Phone: ELC:
/
ELR:
SIT:
BUILDING BLDG (con't) PLUMBING MECHANICAL ELECTRICAL SITE
Site Post/Beam Post/Beam Post/Beam Cover /Service Sewer /Storm
Footing Roof UndFl/Slab Rough -In Ceiling Water Line
Slab Framing Top Out Gas Line Rough -In UG Sprinkler
Foundation Insulation Sewer Hood/Duct Reconnect Vault
Bsmt Damp Drywall Storm Furnace Temp Service MISC.
Masonry Ceiling Rain Drain A/C UG Slab 7
Shear /Sheath Fire Spkk /Alm Crawl/Found Dr Heat Pump Low Volt
Approved A to ov =. Approved Approved Approved
Appr /Sdwlk Not Approved - - • • ved Not Approved Not Approved Not Approved
FINAL FIN FINAL FINAL FINAL
.,3- _� �. / "A Ai " l JJ �/I
-� l ,� //37/ ...Ad / � / _ ii ,..1, -, / A-
i
----C.57 //3 36) /othx,- ! 4 -61--7 4-- Y'S
C :r l . • -LL .4./1i.A_LJ A I►
I 57 ; SW 1 TA A LMH / P r Iam
r s
- - I, . LL� i I •
- -" A V I g d I i r r —
JP 414-21,-rWA1013,11111C417111 t
C_ 7 - S
/ •
Cl Call - . pectin - phReinspecti • 2 of $ required newt inspection inspection O Unable to inspect
Inspector 1 44 dffir : ... . Date: l / Page of
CITY OF TIGARD BUILDING INSPECTION DIVISION
24 -Hour (Inspection Line: 639 -4175 Business Phone: 639 -4171
Date Requested: l D — /0 — 7 l A. M. P.M. MST: 4 / - 6 (Ai/ Location: 43 9 SbV ..574 4 f 4J QL-C BUP:
Tenant: Suite:: � - MEC:
Contractor _ S / , ,e4 Phone: 5— 3 F-s- PLM:
Owner: Phone: ELC:
ELR:
SIT:
BUILDING L iB n't) PLUMBING MECHANICAL ELECTRICAL SITE
Site eam Post/Beam Post/F3eam Cover /Service Sewer /Storm •
Footing Roof UndFl/Slab Rough -In Ceiling Water Line
Slab Framing Top Out Gas Line Rough -In UG Sprinkler
Foundation Insulation Sewer Hood/Duct . Reconnect Vault
Bsmt Damp Drywall Storm Furnace Temp Service MISC.
Masonry Ceiling Rain Drain A/C UG Slab
Shear /Sheath Fire Spklr /Alm Crawl/Found Dr Heat Pump ' Low Volt
pproveD Approved Approved Approved Approved
Appr /Sdwlk Not A p Not Approved Not Approved Not Approved Not Approved
FINAL FINAL FINAL FINAL
t 4 a Ste ��� L — 7 ?— ova i C- / K-SS
1 1 - S 2 s . 1 . 1/4-v. a. (9 -a 3 5,) C - Z PA_ S e
1 l " t7 t 1/4..A 1/4,-. PL, Cg) -o 39,) C_ 3 PA- SC
113cr I P .,..., C? l,. (_?-03”) b- / PASS
t I3 rc) Pte, s -. (g7 -a3q .k) 0 mss
1I, 3 - 1g Qom• el...... (M7 -03g3) D--3 PL
t V `"i (, () t.....A,". PL . (q7 - o Yoe) C - Pa.SS
1 1, 314 P-A,.� w• 2 1. C'7 -0 3°I q) c- s" Pis s
1 t 3l 1 sv J Li..y,r,,o,r (-D— 039 C - (p Pmss S
t t -pct S (— 0 / i g) ')— y Pots&
de
A .MPALIPIP.''..., - i&e:(7/11/- . .
owe" A "
Il Call for reinspection O Reinspection fee of $ required before next inspection 0 Unable to inspect
Inspector: `` R C Date: / 6/ d / / Page / / of / /