Permit Support Document . • _ • i_o r 4/-3 / 6,29. 6'
CITY OF TIGARD BUILDING INSPECTION DIVISION
24 -Hour Inspection Line: 639 -4175 Business Phone: 639 -4171
Date Requested: /0 - /C ^ q 7 A.M. P.M. MST: q6--d/l?
Location: - // 3 (P ! BUP:
Tenant: Suite: Bldg: P- T MEC:
Contractor: ,i 0 4 %IY.1 A i Phone: 57?-35 PLM:
Owner: / 11,1,i Phone: ELC:
ELR:
SIT:
BUIL B LDG (co ) PLUMBING 1- 41M CAL ELECTRICAL SITE
Site Po eam Post/Beam Post/Beam Cover /Service Sewer /Storm
Footing Roof UndFl/Slab Rough -In Ceiling Water Line
Slab Framing Top Out Gas Line Rough -In UG Sprinkler
Foundation Insulation Sewer Hood/Duct Reconnect Vault
Bsmt Damp Drywall Storm Furnace Temp Service MISC.
Masonry Ceiling Rain Drain A/C UG Slab
Shear /Sheath Fire Spklr /Alm Crawl/Found Dr Heat Pump Low Volt
Approved Approved tigiliCVA Approved Approved
Appr /Sdwlki Not Approved Not A r oved Not Approved Not Approved
1 • • 1 FINAL ( AL) FINAL FINAL
C ) c_e___e_ c , ‘
0 v� �--i- dM. 5/ s -s C ---
- ciNr s C'
( - ..L.--r- v,.,-,..,... C< S, c, .. c..) c----- - 9./....,----- , - 7 , ---c_e_ tn..<:ssL.,... .
•
Call for reinspection O Reinspection fee of $ required before next inspection O Unable to inspect
r
Inspector: r) Date: / L 'V ( C 7 Page M of / /
U/Y1,(t - D.- i ; L i S' ____ .
CITY OF TIGARD BUILDING INSPECTION DIVISION
24 -Hour Inspection Line: 639 -4175 Business Phone: 639 -4171
,/�/� G I p Oi i g
Date Requested: .ri(i(.Q' " 9 - 1 3 n A.M. P.M. MST: — Q 1Gj
Location: i a .. i ° _ l ()Yt PJ. BUP:
Tenant: Suite: Bldg: ar MEC:
Contractor: TA PAO I P LM PO R- Phone: 5 79 - 357f s PLM:
Owner: j A-INA E Gam- B i W &id b eV Phone: ELC:
PLEASE OT F I l ■R OR TO "' R)V'AL O ELR:
-{-h- H C A-0 05 3 l/-, ( 5P SIT:
BUILDING BLDG (con't) PLUMB
ME • CAL ELECTRICAL SITE
Site Post/Beam •os :. -: Post/Beam Cover /Service Sewer /Storm
Footing Roof UndFl/Slab Rough -In Ceiling Water Line
Slab Framing Top Out Gas Line Rough -In UG Sprinkler
Foundation Insulation Sewer Hood/Duct Reconnect Vault
Bsmt Damp Drywall Storm Furnace Temp Service MISC.
Masonry Ceiling Rain Drain A/C UG Slab
Shear /Sheath Fire Spklr /Alm Crawl/Found Dr Heat Pump Low Volt
Approved (pproved Approved Approved Approved
Appr /Sdwlk Not Approved No roo Not Approved Not Approved Not Approved
FINAL FINAL FINAL FINAL FINAL gl
i / f ir f Ili
..... ,
_ _ _
/ rZ
I
O Call o r1' Y �: do a, 0 e 7% ti-,n fee of $ required before next inspection 0 Unable to inspect
Inspecto l li p 1 /// _ . Date: ✓ / �7 Page of
•. si 11
i
uoir D -1 (L-0 1 1-5
CITY OF TIGARD BUILDING INSPECTION DIVISION
24 -Hour Inspection Line: 639 -4175 Bus' ss Phone: 639 -4171
Date Requested: i - 9- / �_/ �,/ A.M. P.M. MST: C
Location: 1 1 j $) c_ P- ectiCJ / BUP:
Tenant: CS J Suite: Bldg: MEC:
Contractor: t&PA 0 I ?U N\ 13 F o ( Phone: 579-558S-
1 9- 35 8S PLM:
owner J A ME-5 ' 1 00 ..IJ eNJ .Q /Phone: ELC:
CSsi cr1 F Y P L Mis P R O ?- 70 "1 I 1./ o 1 1•C, ELR:
o ES E l 05 SIT:
BUILDING BLDG (con't) 1 ,----10 MECHANICAL ELECTRICAL SITE
Site Post/Beam Post/Beam Post/Beam Cover /Service Sewer /Storm
Footing Roof UndFl/Slab Rough -In Ceiling Water Line
Slab Framing Top Out Gas Line Rough -In UG Sprinkler
Foundation Insulation Sewer Hood/Duct Reconnect Vault
Bsmt Damp Drywall Storm Furnace Temp Service MISC.
Masonry Ceiling Rain Drain A/C UG Slab
Shear /Sheath Fire Spklr /Alm Crawl/Found Dr Heat Pump Low Volt
Approved • pprov Approved Approved Approved
Appr /Sdwlk Not Approved erz:.1 . ved Not Approved Not Approved Not Approved
FINAL INAL FINAL FINAL FINAL
i
O Call f. �� . = ti. .e _ AfO Reins. ifen ' • of required before next inspection O Unable to inspect
Inspect.. -a // 1♦ �Ii >.s: e. ... 4_ Date: ? . Page of
(ki t c- 3 Lo - 5D
CITY OF TIGARD BUILDING INSPECTION DIVISION
24 -Hour Inspection Line: 639 -4175 Business Phone: 639 -4171
e'ci--Om 011E.-
Date Requested: 9 — -/ - I Pia P.M. MST: C r
Location: I I 3 yam) , Pia ,�� BUP:
Tenant: SUAYM '(-00 1S) Suite: Bldg: MEC:
Contractor. TA PA N 1 PL M , FOIL, Phone: 5 35 d 5 PLM:
Owner: LJ a W es - SO VJ e 1.) D E 'J Phone: ELC:
CPL 4-SF. Pori FY PLM f, PRIOR_TeDA -CZgR VAL So ELR:
46/S1 -1 AA Vy 055-. - = - s f 7 SIT:
BUILDING BLDG (con't) PLUMB I MECHANICAL ELECTRICAL SITE
Site Post/Beam ' os i l eam Post/Beam Cover /Service Sewer /Storm
Footing Roof UndFl/Slab Rough -In Ceiling Water Line
Slab Framing Top Out Gas Line Rough -In ' UG Sprinkler
Foundation Insulation Sewer Hood/Duct Reconnect Vault
Bsmt Damp Drywall Storm Furnace Temp Service MISC.
Masonry Ceiling Rain Drain A/C UG Slab
Shear /Sheath Fire Spklr /Ahn Crawl/Found Dr Heat Pump Low Volt
Approved .. 4 • 'roved Approved Approved Approved
Appr /Sdwlk Not Approved _`, .. iiii).: :. Not Approved Not Approved Not Approved
FINAL DIAL FINAL FINAL FINAL
i ijZir '..' A j III
0 Call for ii do ' O Reinspectio : fee .f $ required before next inspection O Unable to inspect
Inspector: 1 i I r ate: 9,-7.---?7 Page of
��t■ . s■
' — 1
uOIT c- 2 /Lot 5 l
CITY OF TIGARD BUILDING INSPECTION DIVISION
24 -Hour Inspection Line: 639 -4175 Business Phone: 639 -4171
q p t Cg'
Date Requested: TL4. q S . - -I n - 9 -7 A.M. P.M. MST: / 6 - 6
Location: _ i _ At . /. I 0 I / i _ BUP:
Tenant: Suite: - Bldg: v MEC:
Contractor: TA PA 0 \ P L, M PO ( Phone: 539 3 5 8 5 PLM:
Owner: JAM rD Bo W E:0 -} / Phone: ELC:
CPl 0OT1FY PL/v\ PRIOR- TO AR2 -1 Jkt.- SO ELR:
S1 MA`( 613 - -- (QS'? SIT:
BUILDING BLDG (con't) PLUMBIN MECHANICAL ELECTRICAL SITE
Site Post/Beam �ostjBeam Post/Beam Cover /Service Sewer /Storm
Footing Roof UndFl/Slab Rough -In Ceiling Water Line
Slab Framing Top Out Gas Line Rough -In UG Sprinkler
Foundation Insulation Sewer Hood/Duct Reconnect Vault
Bsmt Damp Drywall Storm Furnace Temp Service MISC.
Masonry Ceiling Rain Drain A/C UG Slab
Shear /Sheath Fire Spklr /Alm Crawl/Found Dr Heat Pump Low Volt
Approved • p. ovki Approved Approved Approved
Appr /Sdwlk Not Approved .•ris, . , oved Not Approved Not Approved Not Approved
FINAL I AL FINAL FINAL FINAL
a
i
I . ;'
• �.,.�_. _ I' _ ,_ �' I I � _ .t '-
, ,r /c
O Call for ins. r n _ Ii Rein • - lion -- of $ required before next inspection O Unable to inspect
f r ■
Inspector: / ! �iB7._ _ I■ 11 Date: —9 �y Page of
��'' Wit/ - ! G
CITY OF TIGARD BUILDING INSPECTION DIVISION
24 -Hour (Inspection Line: 639 -4175 Business Phone: 639 -4171
Date Requested: l D — /0 — 7 l A. M. P.M. MST: 4 / - 6 (Ai/ Location: 43 9 SbV ..574 4 f 4J QL-C BUP:
Tenant: Suite:: � - MEC:
Contractor _ S / , ,e4 Phone: 5— 3 F-s- PLM:
Owner: Phone: ELC:
ELR:
SIT:
BUILDING L iB n't) PLUMBING MECHANICAL ELECTRICAL SITE
Site eam Post/Beam Post/F3eam Cover /Service Sewer /Storm •
Footing Roof UndFl/Slab Rough -In Ceiling Water Line
Slab Framing Top Out Gas Line Rough -In UG Sprinkler
Foundation Insulation Sewer Hood/Duct . Reconnect Vault
Bsmt Damp Drywall Storm Furnace Temp Service MISC.
Masonry Ceiling Rain Drain A/C UG Slab
Shear /Sheath Fire Spklr /Alm Crawl/Found Dr Heat Pump ' Low Volt
pproveD Approved Approved Approved Approved
Appr /Sdwlk Not A p Not Approved Not Approved Not Approved Not Approved
FINAL FINAL FINAL FINAL
t 4 a Ste ��� L — 7 ?— ova i C- / K-SS
1 1 - S 2 s . 1 . 1/4-v. a. (9 -a 3 5,) C - Z PA_ S e
1 l " t7 t 1/4..A 1/4,-. PL, Cg) -o 39,) C_ 3 PA- SC
113cr I P .,..., C? l,. (_?-03”) b- / PASS
t I3 rc) Pte, s -. (g7 -a3q .k) 0 mss
1I, 3 - 1g Qom• el...... (M7 -03g3) D--3 PL
t V `"i (, () t.....A,". PL . (q7 - o Yoe) C - Pa.SS
1 1, 314 P-A,.� w• 2 1. C'7 -0 3°I q) c- s" Pis s
1 t 3l 1 sv J Li..y,r,,o,r (-D— 039 C - (p Pmss S
t t -pct S (— 0 / i g) ')— y Pots&
de
A .MPALIPIP.''..., - i&e:(7/11/- . .
owe" A "
Il Call for reinspection O Reinspection fee of $ required before next inspection 0 Unable to inspect
Inspector: `` R C Date: / 6/ d / / Page / / of / /
/ - 9 . 4 -o l 1
"_..4 tl 5 T`'i ?_az3`?7
BOWEN REAL ESTATE Lip
11369 SW SYCAMORE P{,
Action Description Req/ Schd/ End/ Action Nptp8 Diap By Update Upd
Code Sent Done Done Date By
MSTA010 Check for prcl. restrict. / / / / 03 /fb / ?b g Q�i /��,/9 J *H
MSTA012 Plans routed to Plans Examiner / / / / Q4/23/BB used this action to record letter to PRIM �4 Of /fi /P6 JHF
typi
MSTA026 Plane approved by Plans Exmr / / / / 05/28/96 APPR JHF 0§/,8/96 qHF
MSTA030 Reviewed plans routed to DSTS / / / / 06/07/96 APPR Jffp 04/Q6/96 JF}f
MSTA080 (F) Ready to issue / / / / 07/31/96 PASS Jr 070} /lp 7 H
MSTA092 (F) Issue combination permit / / / / 08/02/96 PAID MB OB/02/86 4 *H
MSTA097 Issue plumbing signature form / / / / 12/06/96 OK JDA 12/06/96 KAS
MSTA098 Issue electric signature form / / / / 12/06/96 OK JDA 12/06/96 KAS
MSTA705 Footing Inep / / / / 09/27/96 pouring in 2 phases PART GS 09/27/96 GES
MSTA705 Footing Inep / / / / 10/02/96 install u €ers as per code req'mts; low PART RB 10/03/96 RB
point 1;411.ins req'd.
MSTA706 Foundation Insp / / / / 10/10/96 sec l /,2 of wall APP GS 10/11/96 GES
MSTA710 Post /Beam Structural / / / / 01/15/97 anch9T bolts 12" from ends of mud sills; DIS GS 01/16/97 GES
poste 2/3 of center of pads
MSTA710 Post /Beam Structural / / / / 01/24/97 APP GS 01/24/97 GES
MSTA711 Post /Beam Mechanical / / / / 01/24/97 APP G8 01/24/97 GES
MSTA712 Underfloor insulation / / / / 01/30/97 . APP GS 01/30/97 GES
MSTA713 Crawl Drain / / / / / / ,Z`- r < : �•lr �f J �,V , `� C- 03/4 } /96 J711
MSTA717 PLM /Underfloor / / / / 01/03/97 (� PASS MS 41/A6/97 MRS
MSTA720 Mechanical Inep _ / / / / 06/16/97 D -3 FAIL RB 08/ 14/97 J *H
' }. Exhaust venting disconnected at an
!lousing.
2. Firestop floor at ceiling level
Ci -.) cilthin duct.
Z ;over kitchen needs hanger at
4. Firewall top plate with > 48" o -set
needs strap.
n 5. Strap plate left of slider in fly
room and plate adjacent to stairs a,at
(-7 • point of gable and connection to
' adjoining walls.
v � J
6. Vent baffles required.
7. Metal plate protect plumbing at
laundry tap - plate.
8. Attic access needs at least 30" of
head room at lav end (22 "x30 ")
9. Provide attic access to gable above
jacuzzi.
10. Block roof line at vaulted family
room.
•
Page No. 2 CASE HISTORY FOR CASE NO.: MST96 -0118
BOWEN REAL ESTATE GROUP
11369 SW SYCAMORE PL
04/10/98
Action Description Req/ Schd/ End/ Action Notes Disp By Update Upd
Code Sent Done Done Date By
11. Tie barge rafter truss at both ends
upstairs walls top of stairs and rear
bedroom.
D -4:
12. Insulate heat duct bare metal above
kitchen.
13. Side nail TJI truss hangers.
14. Remove perlin brace away from b -vent
in garage.
15. Trusses over kitchen and garage need
hangers.
16. Exhaust venting disconnected.
17. Firestop floor and ceiling level
within duct chases at main floor
bedroom.
18. Strap plates as per #5 of D -3.
19. Vent baffles
20. Attic access needs 30" of headroom.
21. Tie barge rafter truss at both ends
to plates and rear bedroom top of
stairs.
C -6:
Exhaust venting disconnected.
2. Firestop heat duct chase at floor and
ceiling level.
3. Firestop at roof -line within
fireplace chase.
C -4:
Same as C -6
C -5:
Same as C -6
All Units:
Note: Dryer venting shall be in
accordance with manufacturers
instructions. Furnace and return air
not installed at this time.
(C -Units mechanical only). Call for
reinspection.
MSTA722 Plumb Top Out / / / / 08/19/96 PASS MS 08/19/96 MRS
MSTA722 Plumb Top Out / / / / 05/22/97 PASS RAB 08/20/97 J +H
MSTA722 Plumb Top Out 08/20/97 / / 05/21/97 1. Requires duplex fitting side to side FAIL MS 08/20/97 J•H
fixture.
2. Needs to support vents.
Page No. 3 CASE HISTORY FOR CASE NO.: MST96 -0118
BOWEN REAL ESTATE GROUP
11369 SW SYCAMORE PL
04/10/98
Action Description Reg/ Schd/ End/ Action Notes Disp By Update Upd
Code Sent Done Done Date By
MSTA723 Electrical Service / / / / 05/27/97 Approved as noted: PASS MJR 08/20/97 J *H
Units C -1, C -2, C -3:
1. Door bell trasformer in attic
entrance clearepace.
2. Smoke alarm in downstairs bedroom '
should be in highest part of ceiling
(NEC 110 -36).
C -1, C -2, C -3, D -1, D -2 SERVICE AND
ROUGHIN APPROVED AS NOTED, NO
REINSPECTION NECESSARY.
MSTA724 Electrical Rough In / / / / 05/27/97 See Elec Sery this date for notes PASS MJR 08/20/97 J *H
MSTA725 Framing Insp / / / / 05/23/97 PASS TLP 05/27/97 TLP
MSTA726 Shear Wall Insp / / / / 06/09/97 Nail wings on all edges and ends PASS RB 08/20/97 J *H
including cut outs for electrical panesl
etc. 4" oc. BLOCK AS NEEDED. APPLIES
TO UNITS C4 -5 -6, D3 -4.
MSTA727 Low Voltage / / / / / / 03/21/96 J *H
MSTA735 Gas Line Insp / / / / 06/23/97 D2, APPROVED FAIL RC 07/23/97 J *H
D1, FAIL (LESS THAN 10 #) (reinspected
072397, 14.5# tagged #33232111)
C3, APPROVED
C2, FAIL (LESS THAN 10 #)
Cl, FAIL (NO GAS LINE AT METER)
MSTA740 Insulation Insp / / / / 04/16/97 behind tubs and firepls PART GS 04/16/97 GES
MSTA745 Gyp Board Inep / / / / 06/16/97 Nailing incomplete FAIL RB 06/19/97 J *H
MSTA750 Firewall Inep / / / / 06/09/97 Complete nailing and firestopping where PASS RB 08/20/97 J *H
needed. Applies to units C4- 5- 6 -D3 -4.
Page No. 4 CASE HISTORY FOR CASE NO.: MST96 -0118
BOWEN REAL ESTATE GROUP
11369 SW SYCAMORE PL
04/10/98
Action Description Reg/ Schd/ End/ Action Notes Disp By Update Upd
Code Sent Done Done Date By
MSTA750 Firewall Insp / / / / 06/05/97 2ND LAYER FIREWALL /CAULK, ALL UNITS: PART RB 08/20/97 J *H
1. Firetape joints, etc. of firewall
(typical thru -out.)
2. Vertical R -19 at gable trues in C -1
missed. Also downstairs.
3. Vertical R -19 at vaulted main floor.
C -2 Also, upstairs
4. C -3 same as 2 & 3 above.
5. C -3 seal exhaust vent upstairs.
6. D -1 seal heat duct win main floor
bedroom closet.
7. D -2 Insulate boots and wye's of heat
duct above kitchen.
MSTA755 Rain drain Insp / / / / 11/07/96 PASS MS 11/08/96 MRS
MSTA760 Water Line Insp / / / / / / 03/21/96 J *H
MSTA761 Water Service Insp / / / / / / 03/21/96 J *H
MSTA765 Appr /Sdwlk Insp / / / / / / /4/4 03/21/96 J *H
MSTA790 Electrical Final / / / / 08/08/97 13490.unit finaled. PASS BRP 08/12/97 B *P
MSTA795 Mechanical Final / / / / 06/03/97 10. Is there insulation behind shower at FAIL RB 08/21/97 J *H
main floor (drywall cover)?
11. Before furnace installation provide
drywall cover.
12. Maintain 1" b -vent clearance to •
combustibles.
D4: 1. Seal joints of duct connections.
2. Insulate duct above ceiling blow
level.
3. Chase duct at kitchen and seal floor.
4. Provide exhaust fan/vent connection
at reducer may be needed at main
bathroom.
5. Seal floor & lid through penetrations
within chases in north bedroom.
6. Laundry room exhaust - same as #4
7. Upstairs bath > same as #4 & #6.
D3:
1. Seal joints of duct connections.
2. Insulate that part of metal duct
exposed to unconditioned space above
garage.
3. B -vent clearance needs 1" away from
combustibles.
4. Insulate heat duct boots where
exposed.
5. Chase duct at kitchen and seal floor.
Page No. S CASE HISTORY FOR CASE NO.: MST96 -0118
BOWEN REAL ESTATE GROUP
11369 SW SYCAMORE PL
04/10/98
Action Description Req/ Schd/ End/ Action Notes Disp By Update Upd
Code Sent Done Done Date By
6. Provide exhaust venting as prescribed
within this report.
7. Enclose lid and foor levels within
south bedroom chases.
9. Laundry room exhaust disconnected.
C4:
1. Garage appliances need to lifted 18"
off floor.
2. Furnace not installed.
3. Soffit dryer duct within closet
(pantry). •
• 4. Exhaust venting disconnected.
5. Enclose lid at floor level of duct in
chase - north bedroom.
6. Insulate duct above blown -in at north
bedroom.
7. Enclose lid fo b -vent chase.
8. Provide b -vent sleeve within attic.
9. Gas line for fireplace too short for
connector attachment.
10. Maintain 3" away from fireplace
within rafters.
C5:
1. Inadequate gas line /gas connector
application within fireplace.
2. Maintain 3" away from fireplace flue
within rafters.
3. Maintain garage appliances 18" of
floor ignition.
4. Exhaust venting disconnected.
5. Duct chases north bedroom and seal
floor at lid through penetrations.
6. Provide 3" sleeve air space from
insulation.
7. Furnace /return air requirements.
8. Seal joints of duct connections.
9. Maintain 1" of b -vent clearance.
MSTA797 Plumb Final / / / / 08/06/97 #1 Downspouts not connected. #2 Left PART RAB 08/07/97 RAB
basin in maim bathroom not completely
caulked around rim of fixture. #3
Exterior hose bibbs not properly
anchored to building.
Page No. 6 CASE HISTORY FOR CASE NO.: MST96 -0118
BOWEN REAL ESTATE GROUP
11369 SW SYCAMORE PL
04/10/98
Action Description Req/ Schd/ ,End/ Action Notes Disp By Update Upd
Code Sent Done Done Date By
MSTA799 Building Final / / / / 08/12/97 Conditional use during daylight hours COND RB 08/14/97 J *H
from 0900 -1700 approved.
Building Final Corrections Required for
Unit C- 1/13490 Summerwood:
1. Fireplace inoperative
2. B -vent clearance 1 -in. required at
garage.
3. Permanent address.
4. Firestop garage thru hole
penetrations, clean out plug.
5. Smoke detectgors not interconnected.
6. Handicap ramp at main entry.
NOTE: Check esterior grade /slope,
gutters and downspouts, etc. at
completion of building. Unable to
inspect due to issues above. Other
issues need to be addressed before final
can b inspected or approved. When
ready, please make sure a person is
available for walk - through. Other
unknown issues:
A. Drywall failed 3 times.
B. Mechanical rough failed.
C. No water line inspection.
D. Plumbing final - partial.
E. Electrical final - none.
MSTB400 Development Rev Conditions met / / / / 10/21/97 OK to issue C of 0 for this building as PASS JDA 10/21/97 JDA
both ENG and PLN
have signed off on this one as of this
date
MSTB705 Footing Insp / / / / 10/03/96 n.w. section PART TLP 10/15/96 TLP
MSTB708 Erosion Control / / / / / / 03/21/96 J *H
MSTB715 Slab Insp / / / / 11/12/96 NA GS 11/12/96 GES
MSTB723 Electrical Service / / / / 06/18/97 cover & service okay UNITS D3, D4, C4, PASS BRP 06/20/97 J *H
C5, C6
MSTB725 Mechanical Insp / / / / 05/29/97 CANC ? 08/14/97 J *H
MSTB725 Mechanical Inep / / / / 06/05/97 Approved pending corrections listed on PASS RB 08/20/97 J *H
firewall inspection this date.
Page No. 7 CASE HISTORY FOR CASE NO.: MST96 -0118
BOWEN REAL ESTATE GROUP
11369 SW SYCAMORE PL
04/10/98
Action Description Real/ Schd/ End/ Action Notes Disp By Update Upd
Code Sent Done Done Date By
MSTB725 Mechanical Inap / / / / 06/07/97 Ro.. in for all unite not approved: FAIL RB /08 /20/97 J *H
. ) Apparent leak at fireplace 2)
Soffit duct within garage 3) No furnace
installation yet 4) Seal joints of duct
connections 5) Provide for adequate
exhaust venting of bathroom /shower at
main floor. Reducers may be needed at
fan housing 6) Enclose lid of b -vent
chase upstairs and seal floor thru
penetrations 7) PRovide b -vent sleeve
within attic surround b -vent within 3"
air space 8) Dryer vent must adhere to
the manuf. installations /instructions of
the dryer to be installed 9) Return air
incomplete at time of inspection 10) Is
there insulation behind shower at main
floor /drywall cover? 11) Before furnace
installation > provide drywall cover 12)
Maintain 1" b -vent clearance to
combustibles.
D-
1) Seal joints of duct connections 2)
Insulate duct above ceiling blow level
3) Charge duct at kitchen and seal floor
4) Provide exhaust fan/vent connection.
MSTB730 Framing Inap / / / / 06/16/97 See mechanical inspection 061697 FAIL RB 08/14/97 J *H
Page No. 8 CASE HISTORY FOR CASE NO.: MST96 -0118
BOWEN REAL ESTATE GROUP
11369 SW SYCAMORE PL
04/10/98
Action Description ' Req/ Schd/ End/ Action Notes Disp By Update Upd
Code Sent Done Done Date By
MSTB730 Framing Insp / / / / 06 /17 /97IUnits C4, C5, C61 Make sure b -vent PART RB 08/20/97 J *H
{ { connectors are properly secured, framing
1st inspection.
/C6:) 1) Hanger trusses at main entry 2)
Strap off -set top plate left of slider
3) Cantilever microlams at master
•
bedroom hallway, need engineers approval
4) Roof vents required at master bedroom
5)Pending electrical as per C4 -C6.
D4:
Vent baffles, Strap plate in master
bedroom.
D5:
Vent baffles, Strap bedroom sitting room
barge rafter.
Hanger kitchen ceiling joist, Issues
2,3,4,5 of limit C -6, vent baffles.
C5:
Issues 2,3,4,5 of unit C -6, vent
baffles.
All C units have GPI floor joists w /in
garage cut into a b -vent location.
PROVIDE ENGINEERING FIX.
Also, nail plate protect plumbing.
Mechanical furnace dryer venting &
return air later installation &
requirements.
MSTB740 Gas Line Insp / / / / 07/11/97 Cl - APPROVED 17.5 # PART RB 07/11/97 J *H
C2 - APPROVED 18.8 #
D1 - FAILED (pressure dropped)
MSTB740 Gas Line Insp / / / / 09/29/97 12 #, TAG 323231 PASS RB 09/29/97 *H
MSTB745 Insulation Insp / / / / 06/30/97 All voids must be filled with FAIL RC 07/07/97 J *H
insulation, call for reinspection, pay
$30.00 fee (paid 063097)
Page No. 9 CASE HISTORY FOR CASE NO.: MST96 -0118
BOWEN REAL ESTATE GROUP
11369 SW SYCAMORE PL
04/10/98
Action Description Reg/ Schd/ End/ Action Notes Disp By Update Upd
Code Sent Done Done Date By
MSTB745 Insulation Inap / / / / 07/02/97 1. B -vent clearance at garage and sleeve PASS RB 07/07/97 J *H
needs to be extended downward over truss
in attic. NOTE: All units!
2. Insulate wall cavity in upstairs
bedroom.
3. Roof vents.to be done by final (C5,
C4, C6).
MSTB745 Insulation Insp / / / / 07/01/97 C6 RB 07/18/97 J *H
1. Remove insulation away from b -vent in
garage.
2. Chink doors /windows as needed, i.e.,
main entry, etc.
3. Firestop cavity @ dryer vent
ceiling level.
4. Firestop duct @ main floor bath
floor & ceiling level.
5. Provide ventilation @ main floor
bedroom within attic. 6. Firewall gyp
not breaking over studs, must have tape
& mud.
7. Insulate roof line down to floor
level within upstairs bedrm & bath.
8. Enclose lid of b -vent chase upstairs
- flashing came loose.
9. At garage location, insulate
permimeter of duct entering under
stairs.
D4
1. Same as C6 issues #9
2. Firestop floor within tub /shower
cavity CO main floor, within mech. chase
in main floor bedroom and ceiling corner
adjacent to bath upstairs.
D3
1. Protect plumbing in garage wall from
freeze.
2. Firestop through hole penetrations.
3. Firewall - firestopping @ garage
separations not complete @ ceiling
level. Open gaps. Also, check unit
separations.
4. Bird block missing ® laundry room.
C4
1. Insulate floor level within storage
at duct.
2. Close off space between shavers fh
Page No. 10 CASE HISTORY FOR CASE NO.: MST96 -0118
BOWEN REAL ESTATE GROUP
11369 SW SYCAMORE PL
04/10/98
Action Description Reg/ Schd/ End/ Action Notes Disp By Update Upd
Code Sent Done Done Date By
lid.
3. Remove insulation away from b -vent.
4. Chose off space S atic adjacent to
dryer venting.
5. Chink main entry door jam.
6. Firestop floor level within bathroom
at main.
7. Firewall gyp not breaking over studs
have tape & mud.
8. Provide ventilation within attic of
main floor bedroom. Maintain 5 -ft.
clearance family rm wall.
C5
1. Close off attic space from outside
gap in rear main bedroom. Same between •
showers.
2. Insulate perimeter of heat duct in '
garage and storage run at floor level.
3. chink main door jam.
A
MSTB745 Insulation Insp / / / / 06/23/97 C5 Not approved, all voids must be FAIL RC 07/29/97 J *H
filled with insulation reinspection fee
assessed. ($15.00 FOR ALL 5 UNITS, NOT
$15.00 EACH, PER DS /GS)
'C6 Not approved, all voids must be
filled with insulation
D3 Not approved, s/a
D4 s/a
C4 s/a
DO NOT SHEETROCK
MSTB745 Insulation Insp / / / / 06/05/97 PASS RB 08/20/97 J *H
•
Page No. 11 CASE HISTORY FOR CASE NO.: MST96 -0118
BOWEN REAL ESTATE GROUP
11369 SW SYCAMORE PL
04/10/98
Action Description Req/ Schd/ End/ Action Notes Disp By Update Upd
Code Sent Done Dane Date By
MSTB745 Insulation Inep 08/21/97 / / 06/03/97 C2: 1. Batt value upstairs & main floor, FAIL RB 08/21/97 J *H
44" truss to roof sheathing. 2. Maintain
sleeve around b -vent within attic. 3.
Maintain 3" away from b -vent within
garage floor and 1" away from structural
member. 4. Insulate header in storage
room. 5. Insulate duct exposed within
garage soffit. 6. Seal around return air
in garage.
C3: 1. Maintain 3" clearance at b -vent
in garage. 2. Seal exhaust vent within
upstairs bathroom. 3. Chink upstairs
window. 4. Connect exhaust vent at ext.
terminals. 5. Vault > 44" need to be
tatted.
Dl: Connect exhaust vent within laundry
room. 2. Chink windows as needed. 3.
Insulate duct exposed above garage
ceiling.
D2: 1. Door jams need to be chinked > no
doors installed. 2. Connect exhaust vent
at laundry. 3. Chink jacuzzi window
unit.
Cl: 1. Insulate duct within garage
soffit. 2. Provide b -vent clearance in
garage - 3 ". 3. Chink slider at master
bedroom. 4. b -vent clearance sleeve
within attic. 5. Batt vault rafters
upstairs < 44 ". 6. Vent baffles missed.
7. Chink non - installed doors and cut
window jam upstairs.
MSTB750 Shear Wall Insp / / / / 06/05/97 Shear wall nailing approved PASS RB 08/20/97 J *H
Page No. 12 CASE HISTORY FOR CASE NO.: MST96 -0118
BOWEN REAL ESTATE GROUP
11369 SW SYCAMORE PL
04/10/98
Action Description Req/ Schd/ End/ Action Notes Disp By Update Upd
Code Sent Done Done Date By
MSTB755 Firewall Inep / / / / 07/09/97 Firewall inspection let layer for 2 -hr. PASS RB 08/14/97 J *H
walls:
C -6: Fire caulk wire through hole.
D -4: Sheath rear garage wall first >
then side wall to close off corner >
firetape first.
D -3: Fire tape corner. Sheath side
garage wall first then rear wall.
C -4: Fire caulk wire through hole.
Also, fire caulk gas line and electrical
boxes.
C -5: Fire caulk all through hole
penetrations; including electrical box.
Fire tape joint.
MSTB760 Gyp Board Inep / / / / 06/22/97 not ready, D3, D4, D5, D6 FAIL RC 06/22/97 J *H
MSTB760 Gyp Board Insp / / / / 07/27/97 C6: Miseed nailing where marked. Missed FAIL RB 07/27/97 J *H
gypbd cover at pantry. Green board
required at shower /tub areas. 2 hr wall
at top edge not met within bathroom. 1"
b -vent clearance at garage.
D4: Missed nailing, 1" b -vent clearance.
C4: Missed nailing, 1" b -vent clearance.
C5: Missed nailing, 1" b -vent clearance
and bring down below ceiling level.
D3: Missed nailing, 1" b -vent clearance.
Page No. 13 CASE HISTORY FOR CASE NO.: MST96 -0118
BOWEN REAL ESTATE GROUP
11369 SW SYCAMORE PL
04/10/98
Action Description Req/ Schd/ End/ Action Notes Disp By Update Upd
Code Sent Done Dame Date By
MSTB760 Gyp Board Inep / / / / 06/17/97 APPROVAL PENDING CORRECTIONS: PASS RB 08/20/97 J *H
Applicable to all units: Cl, D2, C2, C3
& Cl:
1. Provide 1" B -vent clearance w /in
garage.
2. This shall apply to all units w /in
subdivision.
a. screw attachment 12" centers
(ceilings /walls)
b. nails - 7" ceilings and 8" walls
c. no closer than 3/8" to edge & ends
d. no greater than 1" from edge & ends
e. no spacing greater than 24"
f. green board req'd at all wet
locations /i.e., jacuzzi (tub) and
showers. Green board may not be
applied to ceilings unless 12 "oc
structural members present.
Depending on circumstances the above
requirements must be met at this
location through -out and be maintained
in as much as possible at all complexes
on this site, phase I.
3. Skylights not totally framed out not
gyp covered.
4. Cover plates in garages.
Note: In reference to issue 2, nailing
missed through -out both marked and
unmarked. Please maintain these
requirements in all buildings to lessen
reinspect fees being charged from this
point on.
MSTB775 Rain Drain Inep / / / / 09/12/97 Note: Down spouts not connected to rain PASS RAB 09/12/97 J *H
drains. •
Units C3, D1, D2, C2
MSTB791 « REINSPECTION» / / / / 06/30/97 INSULTATION REINSPECTION, $30.00 NO PAID RC 06/30/97 J *H
CORRECTIONS MADE.
paid, no receipt number yet per Trudy
Page No. 14 CASE HISTORY FOR CASE NO.: MST96 -0118
BOWEN REAL ESTATE GROUP
11369 SW SYCAMORE PL
04/10/98
Action Description Reg/ Schd/ End/ Action Notes Disp By Update Upd
Code Sent Done Done Date By
MSTB796 Electrical Final / / / / 09/22/97 LOT 43/11369 SYCAMORE - NOT READY PASS BRP 09/23/97 J *H
L0T_44/11371 SYCAMORE - NOT READY
LOT 45/11374 PALM PL - FINAL APPROVED
LOT 46/11376 PALM PL - FINAL APPROVED
LOT 47/11378 PALM PL - FINAL
APPROVED- PENDING
LOT 48/11380 PALM PL - Final approved
pending repair of 2 -gang switch box
upstairs.
LOT 49/11381 PALM PL - Final approved
pending installation of box extenders in
all outlets that do not comply with
370 -20.
LOT 50/11383 PALM PL - Final approved
pending - compliance with 370 -20.
LOT 51/11385 PALM PL - Final approved
pending - comply with 370 -20.
MSTB796 Electrical Final / / / / 10/05/97 Units C6 & D4 need a few more extension PASS BRP 10/05/97 J *H
boxes.
Pull all wallplates - check for
compliance with ART370 -20, 21. Final
okay pending the above. No reinspection
for these two units needed.
MSTB797 Plumb Final 09/12/97 / / 09/09/97 Unit D2 /Lot 48, 11380 SW Palm Place PASS RAE 09/12/97 J *H
approved, dn spouts not connected.
Unit Dl /Lot 49, 11381 SW Palm Place
approved, dn spouts not connected.
Unit C3 /Lot 50, 11383 SW Palm Place
approved, dn spouts not connected.
Unit C2 /Lot 51, 11385 SW Palm Place
approved, dn spouts not connected.
MSTB797 Plumb Final 09/12/97 / / 09/15/97 Downspouts not connected ALL UNITS. PASS RAH 09/17/97 J *H
MSTB798 Mechanical Final / / / / 09/29/97 see notes on individual permits. FAIL RB 09/29/97 J *H
MSTB798 Mechanical Final / / / / 10/06/97 Report dated 092997 - issue #1 seal FAIL RB 10/07/97 J *H
exterior sideing thru hole penetrations.
MSTB798 Mechanical Final / / / / 10/10/97 All units: for - mechanical. PASS RB' 10/29/97 J *H
i ..
Page No. 15 CASE HISTORY FOR CASE NO.: MST96 -0118
BOWEN REAL ESTATE GROUP
11369 SW SYCAMORE PL
04/10/98
Action Description Req/ Schd/ End/ Action Notes Diap By Update Upd
Code Sent Done Done Date By
MSTB799 Building Final / / / / 09/29/97 1. Rain drain. FAIL RB /09/30/97 J *H
2. Dryer vent needs repaired.
3. Secure range vent connectors. Exhaust
of range not working.
4. Fireplace inoperative.
5 Garage step over 8- inches high.
6 Drywall missing left side of wall in
garage /furnace.
7. Enclose soffit at exterior.
8. 6 -inch wood /ground contact.
MSTB799 Building Final / / / / 10/06/97 Unable to inspect no card on job, same FAIL 10/07/97 J *H
as Cl card, etc.
MSTB799 Building Final / / / / 10/10/97 1. San sewer approval required. FAIL 10/29/97 J *H
2. Report dated 092997, issues 5 & 6
incomplete.
(5- garage step more than 8- inches in
height; 6- drywall left side of furnace
missing.)
MSTB950 (F) Issue Cert. of Occupancy / / / / 10/31/97 MAIL 03/06/98 JT
MSTD725 Mechanical Inap / / / / 05/23/97 gas vents not secured properly FAIL TLP 05/27/97 TLP
clearances not correct vents to close to
combustibles
not draft stopped properly
bath vents not vented
MSTD729 Plumbing Top Out / / / / 05/16/97 CHECKING WITH TOM TO SEE IF THIS IS THE PASS TLP 05/27/97 J•H
RIGHT BUILDING.
MSTD791 «REINSPECTION» / / / / 06/26/97 $75 paid this date for insulation PAID JT 06/26/97 JD
reinspect on units d3,d4,c4,c5,c6. There
was no notation in P•P. Steve of Bowen
Development paid fee and said that
inspector who assessed fee was Ron
Church
Addendum: 6/26/97 from George, regarding
conversation with Ron and David, cannot
charge $15 per unit, can only charge
$15. $15 paid 97- 296447 jad
Page No. 'N CASE HISTORY FOR CASE NO.: MST96 -0118
BOWEN REAL ESTATE GROUP
11369 SW SYCAMORE PL
04/10/98
Action Description Reg/ Scbd/ End/ Action Notes Diep By Update Upd
Code Sent Done Done Date By
MSTD796 Electrical Final / / / / 09/30/97 Units C6 & D4 REINSPECfION: Outlet boxes FAIL BRP 09/30/97 J•H
not flush with finish - install
extension adapters, ART370-20. Unit C6
only: Repair sheetrock at refrigerator
outlet, ART370 -21. Plates not covering
opening. Kitchen plug patch sheetrock,
ART370 -21, use extension adapters at
outlets, ART370 -20.
ACTIVE CASE: Grp Smry Edit Prcl Name Actn Cond Log -note Fee Doc Tag Misc Xit
Edit /view information in active case screen
-- MASTER_ PERMIT
:MST96-0118: PROJECT:SCHOLLS FRY RD TWNHM: STATUS:F : UPD:04 /10/98: :JT :
PERMITTEE:BOWEN REAL ESTATE GROUP PRIM..:SUB95 -0005:
SITE ADDRESS:11369 SW SYCAMORE PL JUR...:TIG:
— DESCRIPTION OF PROJECT (1)
UNIT D -4, LOT 43, BUILDING #5
REISSUE: DWELLING UNITS:10: REQUIRED SETBACKS
CLASS OF WORK.:NEW: BEDRMS: 0: BATHS: 0: LEFT..: O:ft RIGHT.: 0:ft
TYPE OF USE...:SFA: FLOOR AREAS FRONT.: 0:ft REAR..: O:ft
TYPE OF CONST.:5N FIRST 0:sf REQUIRED
OCCUPANCY GRP.:R3 SECOND...: 0:sf SMOKE DETECTORS.:Y:
STORIES •2• THIRD 0:Sf PARKING SPACES..:0:
HEIGHT • 0:ft TOTAL O:Sf
FLOOR LOAD 0:pSf BASEMENT.: 0:
VALUE..$: 837283: GARAGE...: 3446:
—NOTES (3)
Inspections his permit are -for ALL of..BLDG. #5 PgUp
name changed. was Summerwood Village TH PgDn
)4/10/96 1 Qom$ k? 4TQRY, RQA cma 8lQ : MST96_n1 i a