Loading...
Report I . • • Main Office Salem Office Bend Office ,` • • P.O. Box 23814 4060 Hudson Ave., NE P.O. Box 7918 ' Tigard, Oregon 97281 Salem, OR 97301 Bend, OR 97708 Carlson Testing Inc. Phone (503) 684 -3460 Phone (503) 589 -1252 FAX (503) 589 1309 Phone (541) 330-9155 FAX (503) 684 -0954 FAX (541) 330 -9163 Special Inspection FINAL SUMMARY LETTER November 5, 2003 T0303843 City of Tigard 13125 SW Hall Blvd., Tigard, OR 97223 -8199 Attn: Building Department Re: King City Fire Station #35 — Seismic Upgrade 17135 SW Pacific Hwy - Tigard, OR Permit No.: BUP2003 -00026 Dear Sir or Madam: This is to certify that in accordance with Section 1701 of the Uniform Building Code, Title 24, we have performed special inspection of the following item(s) per our inspection reports only: Reinforced Concrete Installation of Cast -in -place & Epoxy Anchors Structural Masonry Structural Steel — Shop & Field, includes verification of welder certifications, weld procedures and material certifications. All inspections and tests were performed and reported according to the requirements of Project Documents and, to the best of our knowledge, the work was in conformance with the approved plans and specifications, approved change orders and applicable workmanship provisions of the State Building Code and Standards, as well as the structural engineer's design changes, approvals and verbal instructions. Our reports pertain to the material tested /inspected only. Information contained herein is not to be reproduced, except in full, without prior authorization from this office. If there are any further questions regarding this matter, please do not hesitate to contact this office. Respe , ully submitted, CAR -ON TESTING, INC. „ /. . r ..I mes F. Hietpas perations Manager- . . FH /Is cc: Tualatin Valley Fire & Rescue — Greg Perry Lewis & Van Vleet Inc Peck Smiley Ettlin Architects — Kristi Krueger Benting Construction Inc. NOV -2003 (TH0) 15:13 01) P.001/001 • LEWIS & VAN VLEET I n r n r r n r n r o d principals chtrls c. vein vlee[. p.e. pon4.I. II?wI . p.e. FINAL SUMMARY REPORT DATE: November 6, 2003 JOB NO.: 0] 157 PROJECT: King City Fire Station Seismic Upgrade LOCATION: 17135 'Pacific Ifighway Tigard, Oregon CONTRACTOR Benting Construction OWNER: TVF&R • PERMIT' NO. BUP2003 -00026 TO: City of Tigard Building Department Lewis & Van Vleet Inc_ Consulting Engineers prepared structural design documents and monitored the above - referenced project throughout its construction. We visited and observed the project throughout the course of construction, and prepared clarification and correction documents as required by the contractor. We also received and reviewed copies of reports from Carlson Testing Inc. regarding required special inspections, including their final summary letter dated November 5, 2003. To the best of our knowledge, the project construction conforms to the calculations, plans and details prepared by this office. Signe Lance Cerny, P.E. cc: Scott Bening — B Construction Inc. Bob Thrapp — Peck Smiley Ettlin Greg Perry — TVF &R Carlson Testing lnc. consulting engineers 18550 s.w. boones ferry road cualatln. oregon 97062 (5031 605.6605 phone (503) 6E15.1206 fax