Correspondence os A-u :7 — 3&' �cLair Meeting Notes SUBJECT: Jurisdictional Meeting / Project Overview PROJECT: Dr. Sepp, Dentist Office Project MTG. DATE: July 01, 2004 LOCATION: 16035 SW Pacific Highway ATTENDEES: Gary Lampella, City of Tigard Allan Clair, CLAIR Deborah Martisak, CLAIR Dr. Sepp, Property Owner NOTES BY: Deborah Martisak, CLAIR Meeting Summary 4:00 PM to 5:30 PM: Meeting held on -site to discuss the status of the Project and to determine jurisdictional responsibility. Project Summary: Type V -N Building, No Sprinklers, No Fire Alarm 2,500 SF, 3- Stories, B- Occupancy The scope of this Project as defined by the City of Tigard is the conversion of a single - family dwelling to business occupancy (R3 to B Occupancy), dentist office. Permits issued from City of Tigard on December 15, 2003, include Building, Mechanical, Site Plumbing & Plumbing. The Site Plumbing permit has been withdrawn. Additional square footage that was not originally permitted by City of Tigard has been designed and is in the process of being constructed. The following is a summary of the discussions held and the action required by all parties in attendance. • Jurisdictional Meeting / Project Overview w c La i r July 1, 2004 E L Page: 2 of 4 AR # Subject Define Action Responsible Date Due Party 07.01.04 - Exterior Decision by Dr. Sepp is pending on whether to Dr. Sepp N/A #1 Siding remove or keep the existing siding. If siding is removed a Building Permit is required to be pulled. Permits for any new scope of work, not already permitted by City of Tigard, will need to be permitted by the City of King City. It appears as indicated on the March '04 submitted plans and calculations that, that the plans indicate the removal of the siding and installation of new lateral bracing / sheathing. 07.01.04 Engineering Use and design methodology has been altered, Dr. Sepp Submit with #2 & Design examples provided below; Revised 1)Third floor (attic) will not be converted to an Plans office space. The stairs will be removed and the attic will be an unoccupied — unfinished space. 2) Larger windows were installed in patient lobby area. 3) Additional square footage to the permitted floor plan as been added above the garage. 4) Steel beam shown on plans was constructed with a wood glue -lam beam. 5) Removal of stair case (pending). • Based on the above noted design changes, Dr. Sepp will need Engineer / Designer to revise structural calculations and IFC drawings. Once documents are completed, submit 4 -sets of copies to the City of Tigard. City of Tigard will determine what needs to be permitted by City of King City and will forward accordingly. Once the determination of what City of King City will be reviewing and inspecting of the new scope of work, CLAIR will contact Dr. Sepp and coordinate the permits. 07.01.04 Patient Engineer of Record (current plans) indicate Dr. Sepp Submit with #3 Lobby Area hold -downs directly under an existing window. Revised — N.E Corner Please provide revised hold -down design for Plans of Wall this area. Shear Wall Hold -Downs • Jurisdictional Meeting / Project Overview c La i r July 1, 2004 Page: 3 of 4 AR # Subject Define Action Responsible Date Due Party 07.01.04 Lateral Request Engineering for lateral support. Dr. Sepp Submit with #4 Support Revised Plans 07.01.04 West End of Provide engineering for support of bearing wall Dr. Sepp Submit with #5 Glue -lam where glue -lam beam is currently installed. Revised Support Plans 07.01.04 Rafters — S Provide ventilation for the rafters in the vaulted Dr. Sepp Prior to #6 Wall — Side ceiling. Framing Exit Door Inspection Room 07.01.04 Use of Third Provide revised plans indicating that the Attic Dr. Sepp Submit with #7 Floor - Attic will be an occupied — unfinished area. Revised Plans 07.01.04 Shear Wall - The plans indicate that the plywood attached to Dr. Sepp Before #8 Back of the shear wall is to be nailed not screwed. Framing Space — Please construct per approved plans and Inspection West Side, details or get approval from Engineer or Adjacent to Record. Side Exit Door 07.01.04 Additional Once revised plans and calculations are Dr. Sepp After plans #9 SF Above received by CLAIR from the City of Tigard, the have been Garage following permits will need to be applied for revised and from the City of King City; submitted Building Permit (valuation of new SF only) to City of Mechanical Permit & Electrical Permit Tigard 07.01.04 Additional Provide engineering for built -up beam header Dr. Sepp Submit with #10 SF Above over garage and validate adequate footing Revised Garage support. Contractor indicated that the built -up Plans header would be in- filled with bearing wall below, foundation footing and wall design should be provided. 07.01.04 Additional Provide square footage of the new addition over Dr. Sepp Submit with #11 SF Above the garage. Revised Garage Plans 07.01.04 Additional Please review item #2 for details of the process Dr. Sepp Submit with #12 SF Above to follow. In addition, please provide 4- copies Revised Garage of the truss details, lateral analysis and design Plans intent for the additional SF to the office space for plan review. 07.01.04 City of City of Tigard, plan review conditions of Dr. Sepp Before #13 Tigard — approval comments dated December 15, 2003, Occupancy Plan Review which are attached for your review, need to be Comments addressed and closed -out prior to Certificate of Occupancy. Jurisdictional Meeting / Project Overview IMP cLair July 1, 2004 Page: 4 of 4 AR # Subject Define Action Responsible Date Due Party 07.01.04 Inspection All required inspection requests are to be Dr. Sepp 24 -hours #14 Requests handled through CLAIR Company. Please call and /or Prior to (800) 838 -8855, 24 -hours in advance for General When inspection needs. The following inspections are Contractor Inspection required; is Needed 1) Structural - Framing, Roof/ Wall Sheathing, Shearwalls, Insulation, Suspended Ceiling & Final 2) Mechanical — Rough & Final 3) Electrical — Rough -In / Cover, Dwelling Service /Feeder, Exterior Lighting & Final 4) Plumbing — Rough -In / Top -out & Final 5) Other — Driveway / Approach, Sidewalk — ADA Ramps, Pre - Paving & Final Occupancy 07.01.04 Special Property Owner to contract with Special Dr. Sepp Prior to the #15 Inspections Inspection Agency to inspect the epoxy anchor Installation hold- downs. of Hold - Downs 07.01.04 Certificate of Once all inspections have been completed and City of After #16 Occupancy permits finaled, City of Tigard will issue the Tigard Inspections Final Certificate of Occupancy for the entire are Finaled structure. 07.01.04 Fire Hazard Please remove large amount of debris that is Dr. Sepp As Soon As #17 placed up against the house. City of King City Possible considers this a potential fire hazard. Completion of Minutes These meeting minutes were prepared by Deborah Martisak of Clair Company, Inc. Any additions or corrections are requested submitted in writing within 48 hours of receipt of these meeting minutes. If no corrections are received, these minutes will be deemed an accurate account of the items discussed. • —4411 December 15, 2003 CITY OF TIGARD OREGON Mike Roloff Roloff Construction, Inc. 11004 SW 37 Ave. Portland, OR 97219 RE: Change of Use /Occupancy – Building Permit Project Information Address: 16035 SW Pacific Hwy Floor Area: 2,500 Sq.Ft. Permit #: BUP2002 -00369 Stories: 3 Occupancy: B Construction Type: V -N Tenant: Dr. Sepp Sprinklered: No Jurisdiction: King City Fire Alarm: No • • The scope of this project is the conversion of a single - family dwelling to business occupancy, dentist office. This review was performed under the provisions of the Uniform Code for Building Conservation (UCBC), 1997 edition, Oregon Structural Specialty Code (OSSC), 1998 edition and Uniform Fire Code (UFC), as amended by Tualatin Valley Fire & Rescue, 1999 edition. The plans are approved subject to the following Plan Review Comments 1. The proposed use is a dentist office. The main floor will be utilized for customers and the top floor will contain an administrative office for the dentist. The lower floor and the remainder of the top floor will not be used and may be future space. Any other modifications of this future space will be under the jurisdiction of the City of King City. 2. The lateral analysis by Tim Covert, Structural Engineer, requires Simpson Set Epoxy Anchors to be installed. Carlson Testing, Inc. has been identified as the special inspection agency that will perform these inspections. Please send reports to Hap Watkins, Inspection supervisor at 13125 SW Hall Blvd., tiger, OR 97223. OSSC Chapter 17 3. The frontage road improvements required by the Oregon Department of Transportation shall be completed and approved prior to use or occupancy of the building. 13125 SW Hall Blvd., Tigard; OR 97223 (503) 639 -4171 TDD (503) 684 -2772 • • 4. All land use conditions required by the City of King City shall be completed and approved by King City prior to the use or occupancy of the building. 5. A minimum of (1) fire hydrant shall be located within 250 feet of all portions of the building and at least (1) additional hydrant shall be located within 500 feet of the closest portion of the building. UFC 903.4 6. Fire lanes as required by the Fire Marshal shall be marked and maintained as required by ORS 98.810 through 98.812. UFC 901.4.5.1 7. An accessible entry with an accessible route connecting to the accessible • parking space is required. If the existing door and threshold are to be used, the threshold may be 3 /4 inch high if a beveled edge is provided on each side. OSSC 1108.1.1.2 and 1113.3.6.2 - 8. The accessible entry doors and doors on the path of travel to the • accessible restroom, as well as the restroom, shall have lever type hardware that does not require tight grasping, pinching or twisting to operate. OSSC 1109.3.2 and 1109.9.8 9. The accessible restroom shall be signed with the international symbol of access as required by OSSC 1108.4.12.1 10.A minimum 2A:10BC fire extinguishers shall be provided in the building so the travel distance to an extinguisher does not exceed 75 feet. UFC Standard 10 -1 11.A copy of the approved plans shall be on the job site at all times and available to the City of Tigard inspectors for inspection purposes. OSSC Section 106.4.2. 12.A final inspection and Certificate of Occupancy is required prior to occupying for the intended use of this building or parts thereof. OSSC Section 109.1. If you have questions regarding this review, please call me at, (503) 718 -2448. Sincerely, Gary Lampella Building Official c. Hap Watkins, Inspection supervisor Clair Company File