1, Nmy
WALKER /DILORETO /VOUNIE, INC.
CONSULTING STRUCTURAL • CIVIL ENGINEERS
December 16, 1996
P, incfpaLe
Robert A. Walker
• TO: EKA ARCHITECTS
Dale J. DiLoreto
Wade W, roanie ATTN: Bob Klas
Cole G. Presthax
RE: CARL'S JR / HWY 99 & 109th - TIGARD, OREGON
FINAL FIELD OBSERVATION REPORT / DECEMBER 1, 1996
Associate
Michael Corohel PRESENT: James Gipe,/ WDY, Inc.
Dave Moe / Bentley Construction (Constriction Superintendent)
WORK IN PROGRESS: The crew was finishing portions of the roof framing and
interior framing.
ITEM #1:
All nuts on holdown anchors need to be tightened to the bottom of the
holdown.
ITEM #2:
On the north wall where the freezer is located, add (1) 2x6 stud full height
• next to plumbing vent in stem wall.
ITEM #3: -
Repairs to trusses fabricated with the wrong roof slope were observed.
Repairs were done per the truss manufacturer's detail.
ITEM #4:
For interior north / south running shear wall, extend plywood above walls
to roof and add .A35 clips on one side of truss per detail 23/S -3.
Structural construction related to this project that required structural observations
was observed by a representative from this office. To the best of our knowledge,
the observed work was. in general conformance with structural contract
rlamet(e Park plaza documents, specifications, and addendums.
6420 .s. w. Macadam Observations by WDY, Inc. are performed to determine, in general, if the work is
Suite MO being performed in accordance with the contract documents. The fact that any
rr "Hand. OR 9720l particular work has been observed does not waive the contractor's responsibility
PAX 503/768.3929 for the means and methods of construction or to comply with the contract
503 /768 -3930
Z woad 9661 -9L -Z1
•
• Carl's Jr / Hwy 99 & 109th •
Page 2
documents. The observations are not intended to satisfy any special inspection
requirements of the governing code or building official.
WALKER/DILORETO/YOUNIE, INC.
.te/pa;i..
Ja es D. Gipe
cc: City of Tigard, Building Department
• Bentley Construction
•
•
•
•
•
•
•
•
•
•
E "d 110dd Wb' l E' l l 566 l -9 l -Z l
11-08-1996 10: 52AM FROM WDY. INC 503 +7683929 S I T9 L2 — t ) 340 P. 1
ir5 moy
WALKER /DILORETO /YOUNIE, INC.
CONSULTING S'T'RUCTURAL • CIVIL ENGINEERS
November 8, 1996
•
Principals
TO: EKA ARCHITECTS
Robert A. Walker
Dale .! DU.nre:n ATTN: Bob Klas •
Wade W, Younlc
RE: CARL'S JR. / HWY 99 & 109TH - TIGARD, OR
C:Dlc Ci. l'reslhus SITE OBSERVATION / NOVEMBER 08, 1996
WDY JOB #96199
Associate
Michael Carona!
PRESENT: Bentley Construction / Dave Moe (Construction Superintendent)
WORK IN PROGRESS: The footings, reinforcing, and anchor bolts were in
place and the crew was finishing preparation for the concrete slab.
ITEM #1:
All reinforcing embeds and footing sizes appear to be as shown on the
construction documents.
Observations by WDY, Inc. are performed to determine, in general, if the work
is being performed in accordance with the contract documents. The fact that
any particular work has . been observed does not waive the contractor's
responsibility for. the means and methods of construction or to comply with the
contract documents. These observations are not intended to satisfy any special
inspection requirements of the governing code or building official.
WALKER/DILORETO/YOUNIE, INC.
•
J mes D. Gipe
•
cc: City of Tigard Building Department '
Bentley Construction, Mark Bentley
Willamette Park Plow
6420 J; 63! Macadam
Suite 36(1
Portland. OR 97201
FAX 503/768 -3929
503/768 -3930