Loading...
Correspondence Si 9 Uzro340 1, Nmy WALKER /DILORETO /VOUNIE, INC. CONSULTING STRUCTURAL • CIVIL ENGINEERS December 16, 1996 P, incfpaLe Robert A. Walker • TO: EKA ARCHITECTS Dale J. DiLoreto Wade W, roanie ATTN: Bob Klas Cole G. Presthax RE: CARL'S JR / HWY 99 & 109th - TIGARD, OREGON FINAL FIELD OBSERVATION REPORT / DECEMBER 1, 1996 Associate Michael Corohel PRESENT: James Gipe,/ WDY, Inc. Dave Moe / Bentley Construction (Constriction Superintendent) WORK IN PROGRESS: The crew was finishing portions of the roof framing and interior framing. ITEM #1: All nuts on holdown anchors need to be tightened to the bottom of the holdown. ITEM #2: On the north wall where the freezer is located, add (1) 2x6 stud full height • next to plumbing vent in stem wall. ITEM #3: - Repairs to trusses fabricated with the wrong roof slope were observed. Repairs were done per the truss manufacturer's detail. ITEM #4: For interior north / south running shear wall, extend plywood above walls to roof and add .A35 clips on one side of truss per detail 23/S -3. Structural construction related to this project that required structural observations was observed by a representative from this office. To the best of our knowledge, the observed work was. in general conformance with structural contract rlamet(e Park plaza documents, specifications, and addendums. 6420 .s. w. Macadam Observations by WDY, Inc. are performed to determine, in general, if the work is Suite MO being performed in accordance with the contract documents. The fact that any rr "Hand. OR 9720l particular work has been observed does not waive the contractor's responsibility PAX 503/768.3929 for the means and methods of construction or to comply with the contract 503 /768 -3930 Z woad 9661 -9L -Z1 • • Carl's Jr / Hwy 99 & 109th • Page 2 documents. The observations are not intended to satisfy any special inspection requirements of the governing code or building official. WALKER/DILORETO/YOUNIE, INC. .te/pa;i.. Ja es D. Gipe cc: City of Tigard, Building Department • Bentley Construction • • • • • • • • • • E "d 110dd Wb' l E' l l 566 l -9 l -Z l 11-08-1996 10: 52AM FROM WDY. INC 503 +7683929 S I T9 L2 — t ) 340 P. 1 ir5 moy WALKER /DILORETO /YOUNIE, INC. CONSULTING S'T'RUCTURAL • CIVIL ENGINEERS November 8, 1996 • Principals TO: EKA ARCHITECTS Robert A. Walker Dale .! DU.nre:n ATTN: Bob Klas • Wade W, Younlc RE: CARL'S JR. / HWY 99 & 109TH - TIGARD, OR C:Dlc Ci. l'reslhus SITE OBSERVATION / NOVEMBER 08, 1996 WDY JOB #96199 Associate Michael Carona! PRESENT: Bentley Construction / Dave Moe (Construction Superintendent) WORK IN PROGRESS: The footings, reinforcing, and anchor bolts were in place and the crew was finishing preparation for the concrete slab. ITEM #1: All reinforcing embeds and footing sizes appear to be as shown on the construction documents. Observations by WDY, Inc. are performed to determine, in general, if the work is being performed in accordance with the contract documents. The fact that any particular work has . been observed does not waive the contractor's responsibility for. the means and methods of construction or to comply with the contract documents. These observations are not intended to satisfy any special inspection requirements of the governing code or building official. WALKER/DILORETO/YOUNIE, INC. • J mes D. Gipe • cc: City of Tigard Building Department ' Bentley Construction, Mark Bentley Willamette Park Plow 6420 J; 63! Macadam Suite 36(1 Portland. OR 97201 FAX 503/768 -3929 503/768 -3930