Permit ITYOF TIGA BUILDING PERMIT PERMIT # • PUP96 -014
COMMUNITY DEVELOPMENT DEPARTMENT DATE ISSUED: 04/17/96
13125 SW Hall Blvd. Tigard, Oregon 97223•8199 (503) 639 -4171 N
I % 5 `1O Su) I PICA h C {tWy PARCEL: 2S 1 10DC -0010
SITE ADDRESS...: SW * *NO ADDRESS** HWY
SUBDIVISION T1 -ARt FR.0111C00% ZONING:C —G
BLOCK • LOT •11
REISSUE: FLOOR AREAS EXTERIOR WALL CONSTRUCTION —
CLASS OF WORK.:NEW FIRST • 0 sf N: S: E: W:
■
TYPE OF USE...:COM SECOND...: 0 sf PROTECT OPENINGS?
TYPE OF CONST.:2FR ...: 0 sf N: 5: E: W:
OCCUPANCY GRP.:B2 TOTAL . 0 sf ROOF CONST: FIRE RET ?:Y
OCCUPANCY LOAD: 0 BASEMENT.: 0 sf AREA SEP. RATED:
STOR.: 0 HT: 0 ft GARAGE...: 0 sf OCCU SEP. RATED:
BSMT ?: MEZZ ?: REG!D SETBACKS REQUIRED
FLOOR LOAD • 0 psf LEFT: 0 ft RGHT: 0 ft FIR SPKL: SMOK DET..:
DWELLING UNITS: 0 FRNT: 0 ft REAR: 0 ft FIR ALRM: HNDICP ACC:
BEDRMS: 0 BATHS: 0 IMP SURFACE: 0 PRO CORR: PARKING: 0
VALUE. $ : 5600
Remarks: ONE OF THREE MONUMENT SIGNS, 12 FOOT HIGH STRUCTURE IN ACCESS AISLE TO
SAFEWAY, SEE SGN96 -0020
Owner: FEES
STERLING DEVELOPMENT CORPORATION type amount by date recpt
LA JOLLA CORPORATE CENTER PRMT $ 56.50 JMH 04/17/96 96- 278308
3252 HOLIDAY COURT, SUITE 225 SPCT $ 2.83 JMH 04/17/96 96- 278308
LA JOLLA CA 92037 PLCK $ 36.73 JMH 03/18/96 96 -27711
Phone #: 619 -546 -8841
Contractor:
ES & A INC
1210 OAK PATCH RD
EUGENE OR 97042
Phone #: $ 96.06 TOTAL
Reg #.. : 111286
REQUIRED INSPECTIONS
This permit is issued subject to the regulations contained in the Foot /Found Insp
Tigard Municipal Code, State of Ore. Specialty Codes and all other Misc. Inspection
applicable laws. All work will be done in accordance with Final Inspection
approved plans. This permit will expire if work is not started
within 180 days of issuance, or if work is suspended for more
than 180 days.
Permittee Signature: IC
Issued B y : 4 Oih / jskib A Z _
Call for inspection — 639 -4175
1/21/00 Activities for Case #: BUP96 -00143
4:17:03 PM
Assigned Hold Updated
Activity Description Date 1 Date 2 Date 3 To Done By Disp. Level By Updated Notes
BUPCO24 Plans Approved /Routed to DSTs 4/9/96 JHF APPR JHF 4/10/96
BUPC799 Final Inspection 9/9/96 TLP PASS TLP 9/9/96
BUPC705 FootFound Insp 4/10/96 5/14/96 TLP PASS TLP • 5/14/96
BUPC798 Misc. Inspection 7/24/96 JF PASS BT2 7/25/96 pouring sign post three signs
BUPC090 (F) Ready to issue 4/15/96 JMH J1-1 4/15/96
BUPC100 (F) Issue permit .4/17/96 JMH PAID J *H 4/17/96
BUPC960 Case Finaled 9/9/96 TLP PASS TLP 9/9/96
•
•
•
•
Page 1 of 1 •
•