Loading...
Correspondence ,///"---/;0,, ; April 17, 1996 CITY OF TIGARD ' :1):E GON Wilsey Hamm /Pacific 8405 SW Nimbus Avenue i Beaverton, OR 97008 -7120 Re: LES SCHWAB "SITE" 15348 SW Pacific Highway PC3 -142C SIT96 -0016 The plans and specifications have been reviewed for conformity to applicable l ' codes. Please submit four (4) sets of revised plans and specifications incorporating the following requirements: Acces e The mounting height of the signage for the accessible parking stalls shall be 7' from the ground /sidewalk line to the bottom of the sign [ODOT, July 24, 1995] . Site ► a II (a /1 Provide a copy of the � �Ame '.-ean Rockery Association guidelines for constructing the rock wall. `P 6 ,4) The slope of the storm sewer piping is less than permitted by OPSC, Table 14 -2. Provide the hydrodynamic calculations prepared by an engineer licensed to do business in the State of Oregon [OSSC, Section 302(b)]. Submit the cost breakdown for each category of site improvement including, but not limited to, those listed below: A. Site preparation. . B. Grubbing and grading. n (1\1\( C. Utilities. I D. Storm, sanitary, fire hydrants, fire sprinkler, and domestic water piping. E. Paving. F. Curbs and sidewalks. G. Erosion control. H. Retaining walls and railing. I. Landscaping. J. Lighting. K. Accessibility requirements. 0 Fill placed on property which is to support the foundation of any building shall be placed in accordance with accepted engineering practice. Submit a soils investigation report (as referenced in General Notes, Item 3). If you wish to discuss any of these items, please give me a call. Sincerely, . /"./ James Funk Plans Examiner eit96- 0016\pc3 -142c 3125 SW Hall Blvd., Tigard OR 97223 (503) 639 -4171 TDD (503) 684 -2772 • T ea, -oL-c. /ID • C ITY OF TIGA April 3, 1996 OREGON Les Schwab Tire Centers of Oregon PO Box 667 Prineville, OR 97754 TRAFFIC IMPACT FEE FOR LES SCHWAB TIRE CENTER AT 15348 SW PACIFIC HWY. Enclosed with this letter you will find a calculation sheet showing the computation that has been performed to determine the amount of the Traffic Impact Fee (TIF) to be paid for the project noted above. The amount of the TIF is $21,538.00. You have three payment options available to you. The first is to pay the TIF at the time you are issued a building permit. The second is to arrange for payment over time by signing a promissory note (if you wish to exercise this second option please contact me for additional details). The third option is to defer payment until occupancy. Traffic impact fees are subject to an annual increase of up to 6% if not paid or financed prior to July 1st of each year. Please note that you may appeal the discretionary decisions made in determining the appropriate category and the amount of the fee based on that category. A notice of appeal must be received by the City Recorder no later than 5:00 p.m. on April 17, 1996 and must be accompanied by the $625.00 appeal fee required by Washington County. Although filed with the City Recorder, an appeal would be heard by the Washington County Hearings Officer. If you have any questions, or if I can be of further service, please contact me at 639- 4171. • • Nti Bonnie Mulhearn Development Services Technician • c: TIF file Building file • 13125 SW Hall Blvd., Tigard, OR 97223 (503) 639 -4171 TDD (503) 684 -2772 17 . .• COUNTYWIDE O!N•OF=TIGARD TRAFFIC IMPACT FEE OREGON PAYMENT OPTION FORM 153y( 64J ? c k 1 Date Site Address Le Goal re C'e, 3— I L GC, Project Name . . Plan Check # I realize that I must make a decision on payment of the Traffic Impact Fee (TIF) at this time. Therefore, I request the following (choose whichever option or options are applicable): • ❑ Cash or Check ❑ Credit Voucher ❑ Bancroft or Installment Payments and /or • ❑ The Ordinance allows for deferral of payment of the TIF until issuance of the occupancy permit if the TIF is greater than $5,000. If the TIF meets this requirement, I also request this option. I understand the TIF must be paid prior to issuance of an occupancy permit. I also understand • that the TIF will be recalculated based on the prevailing rates at the time of payment. Please be advised that TIF rates may increase up to six percent each July 1st. This rate increase is not subject to appeal. • OWNER/APPLICANT OWNER/APPLICANT c: Building Permit File • Payment Option Notebook • h: loginldstsltGsub 13125 SW Hall Blvd., Tigard, OR 97223 (503) 639 -4171 TDD (503) 684 -2772 J DATE: PLANS CHECK NO.:! q -2_-670 (1.1 PROJECT TITLE: COUNTYWIDE TRAFFIC IMPACT FEE APPUCANT: WORKSHEET �C.InWaio 7 )we_ Us 11I XS 0-C OFE , (FOR NON - SINGLE FAMILY USES) UNG ADDRESS: i D • 60K X01 CITY/ZIP /P ON RATE PER 1 \J 1 — '1 � `€ CR / 71 LAND USE CATEGORY TRIP TAX MAP NO.: RESIDENTIAL $159.00 2-51 I DDg - ;ADD ty BUSINESS AND COMMERCIAL' $40.00 SITUS M ADDRESS, OFFICE $146.00 , I5 77`t' 5uo Voka- U`/ INDUSTRIAL $153.00 INSTITUTIONAL $66.00 O 1� PAYMENT METHOD: l e • CASH /C'HFC:K CREDIT INSTTTimONAL ONLY: BANCROFT (PROMISSORY NOTE) LAND USE CATEGORY ESCRIPTION OF USE Y AVG. TRIP RAT WEEKEND AVE TRIP RATE DEFER TO OCCUPANCY' ' 1 1 e IQ\ USE .6) I BASIS: s , r, S i 3 Z. (o a e�" --Kre OOI(e CALCULATIONS: TtF_ Emo -c-' P x rATZ__+ e ram _A�Yr ( 7 s Tt►= = T . L:..z. f;.F. x LIO.Co'J x .V uE) •Co • I = Ix,Z PROJECT TRIP ON: X30 14t7 IYl 7 .< 1 j o co _ i� 5 ( 4, Z/ � �` O0 I � -- : I , Sig c ° ADDITIONAL NOTES: FOR ACCOUNTING PURPOSES ONLY: ROAD AMT.: •) G • TRANSIT AMT.: 4) L ICU- CD AAED BY: • CC WASHINGTON COUNTY TIF NOTEBOOK foam tiff 0 • . L August 23, 1996 CITY OF TIGARD Greg McDonald, Project Designer OREGON L S Construction Post Office Box 667 Prineville, Oregon 97754 Dear Mr. McDonald: I have not been able to confirm receipt of a survey or recorded legal agreement between the property owners for lot line adjustment at your Tigard Promenade project site. Related permits are listed below: DEPOSIT BALANCE I PLUMBING PLM96 -0056 -0- $501.80 \ – >� Ro SEWER _ SWR96 -0128 _ -0- $6645.00 7 MECHANICAL MEC96 -0079 -0- r $89.70 STRUCTURAL BUP96 -0153 $2292.15 , $2635.35 x FIRE PROTECTION BUP96 -0154 -0- no application 1 ( 3 , 1 1 ELECTRICAL no application TRAFFIC IMPACT (offset credit) $22614.00 -0- _ SITE WORK SIT96 -0016 $362.70 X $2438.40 TOTAL DUE $12310.25 As soon as the lot line adjustment document is nailed down, we will be able to issue all permits, except the design -built systems that are pending application for electrical, restricted energy (any and all systems) and fire protection. Please instruct your sub -trade contractors to submit complete applications as soon as possible. Applications received after July 1, 1996, require the applicant to provide copies of their CCB, specialty license (Oregon) and receipt of business tax paid to City of Tigard or Metro. If we discover that the survey has already been received and approved I will notify you as soon as possible. Let me know if you have questions. Thank you for your patience. Cordially, 4 -16464434.‘dt — L ean Heitschmidt, DST Community Development h:DSTS /LES /082396/jh 13125 SW Hall Blvd., Tigard, OR 97223 (503) 639 -4171 TDD (503) 684 -2772