Correspondence ,///"---/;0,, ;
April 17, 1996 CITY OF TIGARD '
:1):E GON
Wilsey Hamm /Pacific
8405 SW Nimbus Avenue
i
Beaverton, OR 97008 -7120
Re: LES SCHWAB "SITE"
15348 SW Pacific Highway
PC3 -142C SIT96 -0016
The plans and specifications have been reviewed for conformity to applicable l '
codes. Please submit four (4) sets of revised plans and specifications
incorporating the following requirements:
Acces
e The mounting height of the signage for the accessible parking stalls shall
be 7' from the ground /sidewalk line to the bottom of the sign [ODOT,
July 24, 1995] .
Site ► a II
(a /1 Provide a copy of the � �Ame '.-ean Rockery Association guidelines for
constructing the rock wall.
`P 6 ,4) The slope of the storm sewer piping is less than permitted by OPSC, Table
14 -2. Provide the hydrodynamic calculations prepared by an engineer
licensed to do business in the State of Oregon [OSSC, Section 302(b)].
Submit the cost breakdown for each category of site improvement including,
but not limited to, those listed below:
A. Site preparation. .
B. Grubbing and grading.
n
(1\1\( C. Utilities.
I D. Storm, sanitary, fire hydrants, fire sprinkler, and domestic water
piping.
E. Paving.
F. Curbs and sidewalks.
G. Erosion control.
H. Retaining walls and railing.
I. Landscaping.
J. Lighting.
K. Accessibility requirements.
0 Fill placed on property which is to support the foundation of any building
shall be placed in accordance with accepted engineering practice. Submit
a soils investigation report (as referenced in General Notes, Item 3).
If you wish to discuss any of these items, please give me a call.
Sincerely,
. /"./
James Funk
Plans Examiner
eit96- 0016\pc3 -142c
3125 SW Hall Blvd., Tigard OR 97223 (503) 639 -4171 TDD (503) 684 -2772
• T ea, -oL-c. /ID
•
C ITY OF TIGA
April 3, 1996 OREGON
Les Schwab Tire Centers of Oregon
PO Box 667
Prineville, OR 97754
TRAFFIC IMPACT FEE FOR LES SCHWAB TIRE CENTER AT 15348 SW PACIFIC HWY.
Enclosed with this letter you will find a calculation sheet showing the computation that
has been performed to determine the amount of the Traffic Impact Fee (TIF) to be paid
for the project noted above. The amount of the TIF is $21,538.00.
You have three payment options available to you. The first is to pay the TIF at the time
you are issued a building permit. The second is to arrange for payment over time by
signing a promissory note (if you wish to exercise this second option please contact me
for additional details). The third option is to defer payment until occupancy. Traffic
impact fees are subject to an annual increase of up to 6% if not paid or financed prior
to July 1st of each year.
Please note that you may appeal the discretionary decisions made in determining the
appropriate category and the amount of the fee based on that category. A notice of
appeal must be received by the City Recorder no later than 5:00 p.m. on April 17, 1996
and must be accompanied by the $625.00 appeal fee required by Washington County.
Although filed with the City Recorder, an appeal would be heard by the Washington
County Hearings Officer.
If you have any questions, or if I can be of further service, please contact me at 639-
4171.
•
•
Nti
Bonnie Mulhearn
Development Services Technician
•
c: TIF file
Building file
•
13125 SW Hall Blvd., Tigard, OR 97223 (503) 639 -4171 TDD (503) 684 -2772
17 .
.•
COUNTYWIDE O!N•OF=TIGARD
TRAFFIC IMPACT FEE OREGON
PAYMENT OPTION FORM
153y( 64J ? c k 1
Date Site Address
Le Goal re C'e, 3— I L GC,
Project Name . . Plan Check #
I realize that I must make a decision on payment of the Traffic Impact Fee (TIF) at this time. Therefore,
I request the following (choose whichever option or options are applicable):
•
❑ Cash or Check
❑ Credit Voucher
❑ Bancroft or Installment Payments
and /or
•
❑ The Ordinance allows for deferral of payment of the TIF until issuance of the occupancy permit
if the TIF is greater than $5,000. If the TIF meets this requirement, I also request this option.
I understand the TIF must be paid prior to issuance of an occupancy permit. I also understand
• that the TIF will be recalculated based on the prevailing rates at the time of payment. Please
be advised that TIF rates may increase up to six percent each July 1st. This rate increase is not
subject to appeal.
•
OWNER/APPLICANT OWNER/APPLICANT
c: Building Permit File •
Payment Option Notebook •
h: loginldstsltGsub
13125 SW Hall Blvd., Tigard, OR 97223 (503) 639 -4171 TDD (503) 684 -2772 J
DATE: PLANS CHECK NO.:!
q -2_-670 (1.1
PROJECT TITLE:
COUNTYWIDE
TRAFFIC IMPACT FEE APPUCANT:
WORKSHEET �C.InWaio 7 )we_ Us 11I XS 0-C OFE ,
(FOR NON - SINGLE FAMILY USES) UNG ADDRESS:
i D • 60K X01
CITY/ZIP /P ON
RATE PER 1 \J 1
— '1 � `€ CR / 71
LAND USE CATEGORY TRIP TAX MAP NO.:
RESIDENTIAL $159.00 2-51 I DDg - ;ADD
ty BUSINESS AND COMMERCIAL' $40.00 SITUS M ADDRESS,
OFFICE $146.00 , I5 77`t' 5uo Voka- U`/
INDUSTRIAL $153.00
INSTITUTIONAL $66.00
O 1�
PAYMENT METHOD: l e •
CASH /C'HFC:K
CREDIT INSTTTimONAL ONLY:
BANCROFT (PROMISSORY NOTE) LAND USE CATEGORY ESCRIPTION OF USE Y AVG. TRIP RAT WEEKEND AVE TRIP RATE
DEFER TO OCCUPANCY' ' 1 1 e IQ\ USE
.6)
I
BASIS: s , r, S i 3 Z. (o a e�" --Kre OOI(e
CALCULATIONS:
TtF_ Emo -c-' P x rATZ__+ e ram _A�Yr ( 7
s
Tt►= = T . L:..z. f;.F. x LIO.Co'J x .V uE) •Co
• I = Ix,Z
PROJECT TRIP ON:
X30 14t7 IYl 7 .< 1 j o co _ i� 5 ( 4, Z/ � �` O0
I � -- : I , Sig c °
ADDITIONAL NOTES: FOR ACCOUNTING PURPOSES ONLY:
ROAD AMT.:
•) G •
TRANSIT AMT.:
4) L ICU- CD
AAED BY:
•
CC WASHINGTON COUNTY
TIF NOTEBOOK
foam tiff 0
•
. L
August 23, 1996 CITY OF TIGARD
Greg McDonald, Project Designer OREGON
L S Construction
Post Office Box 667
Prineville, Oregon 97754
Dear Mr. McDonald:
I have not been able to confirm receipt of a survey or recorded legal agreement between the
property owners for lot line adjustment at your Tigard Promenade project site. Related permits are
listed below:
DEPOSIT BALANCE I
PLUMBING PLM96 -0056 -0- $501.80 \ – >� Ro
SEWER _ SWR96 -0128 _ -0- $6645.00 7
MECHANICAL MEC96 -0079 -0- r $89.70
STRUCTURAL BUP96 -0153 $2292.15 , $2635.35 x
FIRE PROTECTION BUP96 -0154 -0- no application 1 ( 3 , 1 1
ELECTRICAL no application
TRAFFIC IMPACT (offset credit) $22614.00 -0-
_ SITE WORK SIT96 -0016 $362.70 X $2438.40
TOTAL DUE $12310.25
As soon as the lot line adjustment document is nailed down, we will be able to issue all permits,
except the design -built systems that are pending application for electrical, restricted energy (any and
all systems) and fire protection. Please instruct your sub -trade contractors to submit complete
applications as soon as possible. Applications received after July 1, 1996, require the applicant to
provide copies of their CCB, specialty license (Oregon) and receipt of business tax paid to City of
Tigard or Metro.
If we discover that the survey has already been received and approved I will notify you as soon as
possible. Let me know if you have questions. Thank you for your patience.
Cordially,
4 -16464434.‘dt —
L ean Heitschmidt, DST
Community Development
h:DSTS /LES /082396/jh