C
CONSTRUCTION CO. P.O. Box 667 Prineville, Oregon 97754 1 (541) 416 - 5162
Ore Reg. UM '
fax 416 -5133
Wash. Reg # '110PC
December 31, 1996
Bob Poskin, Plans Examiner
City of Tigard
13125 SW Hall Blvd.
Tigard, OR 97223
Enclosed please find copies of the tire storage racking drawings as requested for your
review. As shown in the accompanying plans and details, tire storage will occur at a height
not to exceed 15' -0 ".
I hope this answers your questions. Should you have any others, please do not hesitate to
call me or Mark Jaekel at Viking Sprinkler.
Thank you. .
Greg McDonald
4' MVP/4bl
Project Designer
cc: file, Mark Jaekel
A Division of
Les Schwab The Centers
of Oregon Inc.
IL
1110 LES SCHWAB
CONSTRUCTION CO. P.O. Box 667 Prineville, Oregon 97754 (503) 447 -9162
FAX 447 -9133
Oregon Reg. # 61280
wash. Reg # LSCONC •110PC August 1,1996
O� �
G �
Linhart Peterson Powers Associates 0
3855 -3 Wolverine Street NE
Salem, OR 97305
Attn: Walt Friday
r.e.: Les Schwab Tire Center
15348 SW Pacific Hwy.
Tigard, OR
Plan Review
LP Job No. 96522.021
City No. BUP -96 -0154
Dated: June 5, 1996
This letter is in response the above mentioned plan review of our new store in Tigard, OR.
The plans have been revised to address your concerns. The items listed below correspond
to each item listed in your plan review.
General Comments
1. Cleanouts will be provided at the base of all building raindrains.
2. The turbine ventilators have been shown on the elevations and cross - sections.
Fire and Life Safety
1. The 2 -hour wall has been designated as a "two -hour high -piled storage area -
separation wall ".
2. The sprinkler system for Room #104 will be designed for "High- hazard commodities"
and comply with Table 81 -A for "500 -2500 sq.ft. Nonpublic Accessible (Option 1)."
3. The authority having jurisdiction for the site design aspects of the fire code
•
regulations in the City of Tigard is the Tualatin Valley Fire & Rescue and Beaverton
Fire Department, Gene Burchill, Deputy Fire Marshal and Plans Examiner. In an
earlier review, he has concluded that the private road to the north of the building
will not be required for fire department access, and is therefore not considered a fire
lane. Therefore, the comment that the downspouts are encroaching into the vertical
clearance for the fire apparatus access road does not apply.
4. See item #3 above.
5. No comment or response required.
6. Aisle widths in Room #104 will be maintained at 44 inches, minimum.
7. The catwalks will be constructed of a "Grip- Strut" type open grating material, which
should not interfere with the hose stream trajectory. Drawings and details have been
included in response to Item #12 below.
8. No comment or response required.
9. Fire dampers will be provided on all duct penetrations through the 2 -hour wall. (See
revised Mechanical Plans.)
10. The openings in the 2 -hour wall have been reduced in length to be no more than
25% of the wall length, specifically, each of the windows from Room #101 to Room
#102 have been reduced in length. (See Floor Plan.)
11. No comment or response required.
12. Included herein please find drawings for the racking system, including details for the
stairs with handrails and guardrails.
Structural Comments
1. No comment or response required.
Disabled Access Comments
1. The height of the coffee maker cabinet has been reduced to 34" to comply with side
reach requirements of UBC Sec. 3109 (b) 3.F.
Energy Conservation Requirements
1. Ground cover under a concrete slab is only required in residential construction.
•
Mechanical Comments
See the enclosed cover letter and revised drawings by MFIA, Inc.
We hope that we have addressed your concerns adequately. We would also hope that you
will be able to review these changes in a timely manner. If there are any questions
remaining, please contact me at the above phone number. If these changes meet with your
satisfaction, please notify us and forward your approval to the building official in the City
of Tigard, Dave Scott. We would like to secure building permits as soon as possible.
Thank You.
Greg McDonald
s ckt- Altt Dekvit4
Project Designer .
cc: Norbert J. Volny, Volny Engineering, Bend, OR
Dave Scott, Building Official, City of Tigard
A Division of
• ri Les Schwab Tire Centers
of Oregon Inc.
[ Tire s
tE22
CONSTRUCTION CO. P.O. Box 667 Prineville, Oregon 97754 (503) 447 -9162
FAX 447 -9133
Ore Re # 61280
Was Re # LSCONC'110PC
March 25, 1996
City of Tigard
Community Development Services Dept.
13125 S.W. Hall Blvd.
Tigard, OR 97223
Attn: Jim Funk
r.e.: Les Schwab Tire Center
15348 S.W. Pacific Ave.
Tigard Promenade
Tigard, OR
Please accept the site and building plans for the above referenced
project for permit review.
While the project was designed according to, and we are submitting
for review under the 1993 Oregon Structural Specialty Code, base on
the 1991 UBC, we hereby request that, for purposes of permit
review, the tire storage portion be reviewed under the revised UFC
Article 81, table 105a, as published in the 1993 Accumulative
Supplements, by ICBO, March 31, 1993.
Please advise if this is acceptable.
Greg McDonald 1/14g
Proj esigner