Loading...
Correspondence • A Division of EL Les Schwab Tire Centers of Oregon Inc. C CONSTRUCTION CO. P.O. Box 667 Prineville, Oregon 97754 1 (541) 416 - 5162 Ore Reg. UM ' fax 416 -5133 Wash. Reg # '110PC December 31, 1996 Bob Poskin, Plans Examiner City of Tigard 13125 SW Hall Blvd. Tigard, OR 97223 Enclosed please find copies of the tire storage racking drawings as requested for your review. As shown in the accompanying plans and details, tire storage will occur at a height not to exceed 15' -0 ". I hope this answers your questions. Should you have any others, please do not hesitate to call me or Mark Jaekel at Viking Sprinkler. Thank you. . Greg McDonald 4' MVP/4bl Project Designer cc: file, Mark Jaekel A Division of Les Schwab The Centers of Oregon Inc. IL 1110 LES SCHWAB CONSTRUCTION CO. P.O. Box 667 Prineville, Oregon 97754 (503) 447 -9162 FAX 447 -9133 Oregon Reg. # 61280 wash. Reg # LSCONC •110PC August 1,1996 O� � G � Linhart Peterson Powers Associates 0 3855 -3 Wolverine Street NE Salem, OR 97305 Attn: Walt Friday r.e.: Les Schwab Tire Center 15348 SW Pacific Hwy. Tigard, OR Plan Review LP Job No. 96522.021 City No. BUP -96 -0154 Dated: June 5, 1996 This letter is in response the above mentioned plan review of our new store in Tigard, OR. The plans have been revised to address your concerns. The items listed below correspond to each item listed in your plan review. General Comments 1. Cleanouts will be provided at the base of all building raindrains. 2. The turbine ventilators have been shown on the elevations and cross - sections. Fire and Life Safety 1. The 2 -hour wall has been designated as a "two -hour high -piled storage area - separation wall ". 2. The sprinkler system for Room #104 will be designed for "High- hazard commodities" and comply with Table 81 -A for "500 -2500 sq.ft. Nonpublic Accessible (Option 1)." 3. The authority having jurisdiction for the site design aspects of the fire code • regulations in the City of Tigard is the Tualatin Valley Fire & Rescue and Beaverton Fire Department, Gene Burchill, Deputy Fire Marshal and Plans Examiner. In an earlier review, he has concluded that the private road to the north of the building will not be required for fire department access, and is therefore not considered a fire lane. Therefore, the comment that the downspouts are encroaching into the vertical clearance for the fire apparatus access road does not apply. 4. See item #3 above. 5. No comment or response required. 6. Aisle widths in Room #104 will be maintained at 44 inches, minimum. 7. The catwalks will be constructed of a "Grip- Strut" type open grating material, which should not interfere with the hose stream trajectory. Drawings and details have been included in response to Item #12 below. 8. No comment or response required. 9. Fire dampers will be provided on all duct penetrations through the 2 -hour wall. (See revised Mechanical Plans.) 10. The openings in the 2 -hour wall have been reduced in length to be no more than 25% of the wall length, specifically, each of the windows from Room #101 to Room #102 have been reduced in length. (See Floor Plan.) 11. No comment or response required. 12. Included herein please find drawings for the racking system, including details for the stairs with handrails and guardrails. Structural Comments 1. No comment or response required. Disabled Access Comments 1. The height of the coffee maker cabinet has been reduced to 34" to comply with side reach requirements of UBC Sec. 3109 (b) 3.F. Energy Conservation Requirements 1. Ground cover under a concrete slab is only required in residential construction. • Mechanical Comments See the enclosed cover letter and revised drawings by MFIA, Inc. We hope that we have addressed your concerns adequately. We would also hope that you will be able to review these changes in a timely manner. If there are any questions remaining, please contact me at the above phone number. If these changes meet with your satisfaction, please notify us and forward your approval to the building official in the City of Tigard, Dave Scott. We would like to secure building permits as soon as possible. Thank You. Greg McDonald s ckt- Altt Dekvit4 Project Designer . cc: Norbert J. Volny, Volny Engineering, Bend, OR Dave Scott, Building Official, City of Tigard A Division of • ri Les Schwab Tire Centers of Oregon Inc. [ Tire s tE22 CONSTRUCTION CO. P.O. Box 667 Prineville, Oregon 97754 (503) 447 -9162 FAX 447 -9133 Ore Re # 61280 Was Re # LSCONC'110PC March 25, 1996 City of Tigard Community Development Services Dept. 13125 S.W. Hall Blvd. Tigard, OR 97223 Attn: Jim Funk r.e.: Les Schwab Tire Center 15348 S.W. Pacific Ave. Tigard Promenade Tigard, OR Please accept the site and building plans for the above referenced project for permit review. While the project was designed according to, and we are submitting for review under the 1993 Oregon Structural Specialty Code, base on the 1991 UBC, we hereby request that, for purposes of permit review, the tire storage portion be reviewed under the revised UFC Article 81, table 105a, as published in the 1993 Accumulative Supplements, by ICBO, March 31, 1993. Please advise if this is acceptable. Greg McDonald 1/14g Proj esigner :z -