Report 3/7/2012 1:58 PM Carlson Testing Inc. —> 85037263703 2
•
Bend Office (541) 330 -9155
Carlson Testing, Inc. Eugene Office
(503)6018Z50
Eugene Orrice (541) 345 -0289
Salem Office (503) 589 -1252
Tigard Office (503) 684 -3460
Special Inspection
FINAL SUMMARY LETTER
Date: March 7, 2012
Job #: T1002779B
City of Tigard
13125 SW Hall Blvd
Tigard, OR 97223 -8199
Attn: Building Division
Re: Project Name: Tigard Campus — Building B (Remodel /Addition)
Address: 8925 SW Center Street — Tigard, OR
Permit #: BUP2010 -00094
Per Chapter 17, Section 1704.1.2 of the International Building Code (IBC), we have performed special inspection of the
following item(s) per our inspection reports only:
Reinforced Concrete
Adhesive Anchors
Structural Steel (Field)
The non - compliance (NC) items recorded for each of the above inspection categories, as listed on the non - compliance
report, have been either repaired and re- inspected by CTI for compliance or reviewed and accepted by the engineer of
record for the project in the "As -Built Condition" or through an RFI.
The issuance of this final report is based on the engineer's acceptance of the NC items not specifically re- inspected by
CTI. CTI did not provide any additional review or re- inspection of those items beyond the inspections that initially
generated each of these individual items on the non - compliance list. The engineer of record has provided the acceptance
of the non - compliance items and as -built conditions.
All requested inspections and tests were performed and reported according to the requirements of project documents and
to the best of our knowledge, the work was in conformance with the approved plans and specifications, approved change
orders and applicable workmanship. provisions of the State Building Code and Standards, as well as the structural
engineer's design changes, approvals and verbal instructions.
Our construction inspection and testing services were provided and intended to help reduce the risk of construction
defects, deficiencies or omissions that arose during and after construction. Our services do not constitute a warranty or
guarantee of any type. Even with diligent construction monitoring and testing, construction defects, deficiencies or
omissions in the contractor's work may exist. It is the contractor's responsibility to perform their work in accordance with
the approved construction documents.
CTI has provided its professional services with the degree of care and skill currently exercised under similar
circumstances by members of its profession in the same locale. Statements made in our reports are based on technical
judgments and should not be construed to be conclusive representations of fact. Our reports pertain to the material
tested /inspected only.
P: Projects \Generar2o10WT1002779B103 -07 -12 Final Letter.doc updated 11/30)11
3/7/2012 1:58 PM Carlson Testing Inc. —> 85037263703 3
I
Date: March 7, 2012
Job #: T1002779B
Page 2 of 2
CTI's services did not include responsibilities related to determining, supervising, implementing or controlling the means,
methods, techniques, sequences or procedures of the construction or evaluating or reporting job conditions related to
health, safety or welfare.
Information contained herein is not to be reproduced, except in full, without prior authorization from this office. If there are
further questions regarding this matter please do not hesitate to contact this office.
Respectfully submitted,
CARLSON TESTING INC.
Kei R. n
Project Manager
KRG /pl
Attachment
cc: Luke — Dorf Inc — John Trinh Fax: 1 -503- 726 -3703
City of Tigard Building Division
David Evans & Associates — Jeremy Williams
jgw@deainc.com
Scott/Edwards Architecture LLP — Jennifer Marsicek
Efrain Palomares Perez Contractor
Bend Office (541) 330 -9155
Geotechnical Office (503) 601 -8250
Carlson Testing, Inc. Eugene Office (541) 345 -0289
Salem Office (503) 589 -1252
Tigard Office (503) 684 -3460
KtCEI VEIL
Special Inspection MAR 1 3 2012
FINAL SUMMARY LETTER
CITY OF TIGARD
Date: March 7, 2012 BUILDING DIVISION
Job #: T1002779B
City of Tigard
13125 SW Hall Blvd
Tigard, OR 97223 -8199
Attn: Building Division
Re: Project Name: Tigard Campus — Building B (Remodel /Addition)
Address: 8925 SW Center Street — Tigard, OR
Permit #: BUP2010 -00094
Per Chapter 17, Section 1704.1.2 of the International Building Code (IBC), we have performed special inspection of the
following item(s) per our inspection reports only:
Reinforced Concrete
Adhesive Anchors
Structural Steel (Field)
The non - compliance (NC) items recorded for each of the above inspection categories, as listed on the non - compliance
report, have been either repaired and re- inspected by CTI for compliance or reviewed and accepted by the engineer of
record for the project in the "As -Built Condition" or through an RFI.
The issuance of this final report is based on the engineer's acceptance of the NC items not specifically re- inspected by
CTI. CTI did not provide any additional review or re- inspection of those items beyond the inspections that initially
generated each of these individual items on the non - compliance list. The engineer of record has provided the acceptance
of the non - compliance items and as -built conditions.
All requested inspections and tests were performed and reported according to the requirements of project documents and
to the best of our knowledge, the work was in conformance with the approved plans and specifications, approved change
orders and applicable workmanship, provisions of the State Building Code and Standards, as well as the structural
engineer's design changes, approvals and verbal instructions.
Our construction inspection and testing services were provided and intended to help reduce the risk of construction
defects, deficiencies or omissions that arose during and after construction. Our services do not constitute a warranty or
guarantee of any type. Even with diligent construction monitoring and testing, construction defects, deficiencies or
omissions in the contractor's work may exist. It is the contractor's responsibility to perform their work in accordance with
the approved construction documents.
CTI has provided its professional services with the degree of care and skill currently exercised under similar
circumstances by members of its profession in the same locale. Statements made in our reports are based on technical
judgments and should not be construed to be conclusive representations of fact. Our reports pertain to the material
tested /inspected only.
P:\ Projects\ General\2010 \T1002779B \03 -07 -12 Final Letter.doc Updated 11/30/11
S .Y.
Date: March 7, 2012
Job #: T1002779B
Page 2 of 2
CTI's services did not include responsibilities related to determining, supervising, implementing or controlling the means,
methods, techniques, sequences or procedures of the construction or evaluating or reporting job conditions related to
health, safety or welfare.
Information contained herein is not to be reproduced, except in full, without prior authorization from this office. If there are
further questions regarding this matter please do not hesitate to contact this office.
Respectfully submitted,
CARLSON TESTING INC.
Keit R.
Project Manager
KRG /pl
Attachment
cc: Luke — Dorf Inc — John Trinh Fax: 1 -503- 726 -3703
City of Tigard Building Division
David Evans & Associates — Jeremy Williams jgw@deainc.com
Scott/Edwards Architecture LLP — Jennifer Marsicek
Efrain Palomares Perez Contractor
•
/
Carlson Testing, Inc.
Incompleted Items List (NCL)
Mar 07, 2012 •
1'1002779.8
Project Name: TIGARD CAMPUS - BUILDING B (REMODEL /ADDITION)
Project Address: 8925 SW CENTER STREET TIGARD OR
Permit No: BUP2010 -00099
P.O. No: Project Manager: KEITH R. GAUVIN
Item # Insp. Date Item Description Compliance CTI Sign -Off Date
Corrected
4 RB 10/05/2010 DETAILS FOR COLUMN PC /MK 1A (ONLY COLUMN FOR THE DRAWING FROM SCOTT KEITH R. GAUVIN 03/07/2012
BUILDING) NEEDS TO BE APPROVED BY THE EOR. ARCHITECTURES.
CC:LUKE -DORF INC - JOHN TRINH
CITY OF TIGARD BUILDING DIVISION
DAVID EVANS & ASSOCIATES - JEREMY WILLIAMS
SCOTT /EDWARDS ARCHITECTURE LLP - JENNIFER MARSICEK
EFRAIN PALOMARES PEREZ CONTRACTOR
Page: 1
31'77201Z I:b$'PM Carlson 'resting Inc. —> 8503b243581 2
Bend Office (541) 330-9155
s�
y Gentechnleal Office (503) 601 -82511
Carlson Testing Inc. Eugene Office (541) 345 -0289
°� Salem Office (503) 589 -1252
Tigard Office (503) 684 -3460
Special Inspection
FINAL SUMMARY LETTER
Date: March 7, 2012
Job #: T10027798
City of Tigard
13125 SW Hall Blvd
Tigard, OR 97223 -8199
Attn: Building Division
Re: Project Name: Tigard Campus — Building B (Remodel /Addition)
Address: 8925 SW Center Street — Tigard, OR
Permit #: BUP2010 -00094
Per Chapter 17, Section 1704.1.2 of the International Building Code (IBC), we have performed special inspection of the
following item(s) per our inspection reports only:
Reinforced Concrete
Adhesive Anchors
Structural Steel (Field)
The non - compliance (NC) items recorded for each of the above inspection categories, as listed on the non- compliance
report, have been either repaired and re- inspected by CTI for compliance or reviewed and accepted by the engineer of
record for the project in the "As -Built Condition" or through an RFI.
The issuance of this final report is based on the engineer's acceptance of the NC items not specifically re- inspected by
CTI. CTI did not provide any additional review or re- inspection of those items beyond the inspections that initially
generated each of these individual items on the non - compliance list. The engineer of record has provided the acceptance
of the non - compliance items and as -built conditions.
All requested inspections and tests were performed and reported according to the requirements of project documents and
to the best of our knowledge, the work was in conformance with the approved plans and specifications, approved change
orders and applicable workmanship, provisions of the State Building Code and Standards, as well as the structural
engineer's design changes, approvals and verbal instructions.
Our construction inspection and testing services were provided and intended to help reduce the risk of construction
defects, deficiencies or omissions that arose during and after construction. Our services do not constitute a warranty or
guarantee of any type. Even with diligent construction monitoring and testing, construction defects, deficiencies or
omissions in the contractor's work may exist. It is the contractor's responsibility to perform their work in accordance with
the approved construction documents.
CTI has provided its professional services with the degree of care and skill currently exercised under similar
circumstances by members of its profession in the same locale. Statements made in our reports are based on technical
judgments and should not be construed to be conclusive representations of fact. Our reports pertain to the material
tested /inspected only.
P: Projects\ General ';.20101T1002779B103 -07 -12 Final Letter.doc Updated 11/30111
3/772012 I : b T - PM Carlson Testing inc. -> t3bO;36Z4;36 1 ;3 -
Date: March 7 2012
Job*: T1002779B
Page 2 of 2
CTI's services did not include responsibilities related to determining, supervising, implementing or controlling the means,
methods, techniques, sequences or procedures of the construction or evaluating or reporting job conditions related to
health, safety or welfare.
Information contained herein is not to be reproduced, except in full, without prior authorization from this office, If there are
further questions regarding this matter please do not hesitate to contact this office.
Respectfully submitted,
CARLSON TESTING INC.
Keit2t
Project Manager
KRG /pl
Attachment
cc: Luke - Dorf Inc - John Trinh Fax: .1- 503 - 726 -3703
City of Tigard Building Division
David Evans & Associates - Jeremy Williams jcp@cleainL. com
Scott/Edwards Architecture LLP - Jennifer Marsicek
Efrain Palomares Perez Contractor
CC!
N,
Carlson Testing, Inc.
F-
Incompleted Items List (N CL)
Mar 07, 2012
T1002779.B cs
cq
Project Name: TIOPRO CAMPH: - ETITT. B IZEMODEL/ACDITICL:E
Project Address: F.2.1: SW CENTER STREET TIGARD OR
Permit No. BUP2010-02024
P.O. No: Project Manager: F:7_ 33 IN
0 '1
cm # insp. Date Item Description Compliance CTI Sign-Off Date
Corrected
4 03 1C/C5/201', DETAILS FOR COLUHN PO/K., SA (ONLY COLAMN FOB THE DRAWING FROM SCOTT KEITH R. Of.HP/TN. 03/07./2312
BUILDING: :3:205 '.CO 32 AP2OVED 3Y THE NOR. AROFF:TECTDRES.
C
ri-
H.
CP2
rs:
g=.
CC: LUKE--cop.: sNC JOHN TR
CITY OF TISRD BUILDING DLVSS_I
DAVID AS:OOIATES - JEREMY BI3J.TAHS
SCO7.1,EDWARDS ARCEITECTUK: LLP JENNLFER Y__ARSICEK.
'0 PEREZ CONTRACTOR
Page: 1