FINAL SUMMARY LETTER
Date: April 4, 2012
Job #: T1105391
City of Tigard
13125 SW Hall Blvd
Tigard, OR 97223 -8199
Attn: Building Division
Re: Project Name: PERS Data Center — Standby Power & Fire Suppression
Address: 11410 SW se Pkwy — Tigard, OR
Permit #: BUP2011 -00139
Per Chapter 17, Section 1704.1.2 of the International Building Code (IBC), we have performed special inspection of the
following item(s) per our inspection reports only:
Expansion Anchors
The non - compliance (NC) items recorded for each of the above inspection categories, as listed on the non - compliance
report, have been either repaired and re- inspected by CTI for compliance or reviewed and accepted by the engineer of
record for the project in the "As -Built Condition" or through an RFI.
The issuance of this final report is based on the engineer's acceptance of the NC items not specifically re- inspected by
CTI. CTI did not provide any additional review or re- inspection of those items beyond the inspections that initially
generated each of these individual items on the non - compliance list. The engineer of record has provided the acceptance
of the non - compliance items and as -built conditions.
All requested inspections and tests were performed and reported according to the requirements of project documents and
to the best of our knowledge, the work was in conformance with the approved plans and specifications, approved change
orders and applicable workmanship, provisions of the State Building Code and Standards, as well as the structural
engineer's design changes, approvals and verbal instructions.
Our construction inspection and testing services were provided and intended to help reduce the risk of construction
defects, deficiencies or omissions that arose during and after construction. Our services do not constitute a warranty or
guarantee of any type. Even with diligent construction monitoring and testing, construction defects, deficiencies or
omissions in the contractor's work may exist. It is the contractor's responsibility to perform their work in accordance with
the approved construction documents.
CTI has provided its professional services with the degree of care and skill currently exercised under similar
circumstances by members of its profession in the same locale. Statements made in our reports are based on technical
judgments and should not be construed to be conclusive representations of fact. Our reports pertain to the material
tested /inspected only.
P:\ Projects \Genera112011 \T1105391 \04 -04 -12 Final Letter.doc Updated 11/30/11
•
• Date: April 4, 2012
Job, #: T1105391
Page 2 of 2
CTI's services did not include responsibilities related to determining, supervising, implementing or controlling the means,
methods, techniques, sequences or procedures of the construction or evaluating or reporting job conditions related to
health, safety or welfare.
Information contained herein is not to be reproduced, except in full, without prior authorization from this office. If there are
further questions regarding this matter please do not hesitate to contact this office.
Respectfully submitted,
CARLSON TESTING INC.
Keith R. Gauvin
Project Manager
KRG /pl
cc: McCoy Electric Inc — Zack Armstrong
City of Tigard Building Division — Walter "Chip" Barnet
McCoy Electric Inc — John Bischof
State of Oregon Administrative Services — Terry Nunley terry.nunley @state.or.us
4/4/Z012 2:00 PM carison Testing Inc. -> 8b0362435b1 1
r
Fax
Attention to:- From: -
Name: 1- 503 - 624 -3681 Name: Patty Leach
Company: Carlson Testing, Inc.
Date: 04/04/2012 Telephone: 503 - 684 -3460
Time: 01:59:28 P Pages: 3
RE: Final Summary Letter (PERS Data Center- Standby Power & Fire
Suppression /Permit #BUP2011- 00139/T1105391)
Comments /Notes:
Patty Leach RECEIVED
Office Assistant APR 4 2012
Carlson Testing, Inc. CITY OF TIGARD
BUILDING DIVISION
Phone (503) 684 -3460
Fax (503) 670 -9147
The information contained in this email is intended for the individual
or entity to which it is addressed. Its contents (including any
attachments) are confidential and may contain privileged information.
If you are not an intended recipient you must not use, disclose,
disseminate, copy or print its contents. If you receive this email in
error, please notify the sender by reply email and delete and destroy
the message.
•
4/4/2012 2:00 PM Carlson Testing inc. —> 0J 2436 1 L
•
Bend Office (541) 330 -9155
y p� Geotechnical Office (S03) 601 -8250
Carlson Testing, Eugene Office (541) 345-0289 Inc. AY 6 Salem Office (503) 589 -1252
Tigard Office (503) 684 -3460
Special Inspection
FINAL SUMMARY LETTER
RECEIVED
Date: April 4, 2012 A 4 2012
Job #: T1105391
CITY OFTIGARD
City of Tigard BUILDING DIVISION
13125 SW Hall Blvd
Tigard, OR 97223 -8199
Attn: Building Division
Re: Project Name: PERS Data Center — Standby Power & Fire Suppression
Address: 11410 SW 68 Pkwy — Tigard, OR
Permit #: BU P2011 -00139
Per Chapter 17, Section 1704.1.2 of the International Building Code (IBC), we have performed special inspection of the
following item(s) per our inspection reports only:
Expansion Anchors
The non - compliance (NC) items recorded for each of the above inspection categories, as fisted on the non - compliance
report, have been either repaired and re- inspected by CTI for compliance or reviewed and accepted by the engineer of
record for the project in the "As -Built Condition" or through an RFI.
The issuance of this final report is based on the engineer's acceptance of the NC items not specifically re- inspected by
CTI. CTI did not provide any additional review or re- inspection of those items beyond the inspections that initially
generated each of these individual items on the non - compliance list. The engineer of record has provided the acceptance
of the non - compliance items and as -built conditions.
All requested inspections and tests were performed and reported according to the requirements of project documents and
to the best of our knowledge, the work was in conformance with the approved plans and specifications, approved change
orders and applicable workmanship, provisions of the State Building Code and Standards, as well as the structural
engineer's design changes, approvals and verbal instructions.
Our construction inspection and testing services were provided and intended to help reduce the risk of construction
defects, deficiencies or omissions that arose during and after construction. Our services do not constitute a warranty or
guarantee of any type. Even with diligent construction monitoring and testing, construction defects, deficiencies or
omissions in the contractor's work may exist. It is the contractor's responsibility to perform their work in accordance with
the approved construction documents.
CTI has provided its professional services with the degree of care and skill currently exercised under similar
circumstances by members of its profession in the same locale. Statements made in our reports are based on technical
judgments and should not be construed to be conclusive representations of fact. Our reports pertain to the material
tested /inspected only.
P:\Prnlects \Genera11201 1',T1105391\04 -04 -12 Final Letter.doc Updated 11/30/11
4/4/2012 2:00 PM Carlson Testing Inc. —> 85036243681 3
•
Date: April 4, 2012
Job #: T1105391
Page 2of2
CTI's services did not include responsibilities related to determining, supervising, implementing or controlling the means,
methods, techniques, sequences or procedures of the construction or evaluating or reporting job conditions related to
health, safety or welfare.
Information contained herein is not to be reproduced, except in full, without prior authorization from this office. If there are
further questions regarding this matter please do not hesitate to contact this office.
Respectfully submitted,
RECEIVE
CARLSON TESTING INC.
j a4 4 Z01Z
CY OF TIGARD
Keith R. Gauvin BUITLDING DIVISION
Project Manager
KRG /pl
cc: McCoy Electric Inc — Zack Armstrong
City of Tigard Building Division — Walter "Chip" Barnet
McCoy Electric Inc — John Bischof
State of Oregon Administrative Services — Terry Nunley terry.nunley5stste.or.us