GeotechnicalInvesti Investigation on Deport
Proposed Goodwill Industries Outlet
Tigard, Oregon
Prepared for.
Goodwill Industries of the Columbia Willamette
1943 SE Sixth Street
Portland, Oregon 97214
•
August 2006 ! 1310 Main Street
• Project # 72283.000 ; 360190.4331 I e
OFFICE COPY , 360396.9064 m
INGINttRINd AND'tNVIRONMINTAI www.plpswnr,c q l
ay
I*
•
Geotechnical Investigation Report
Proposed Goodwill Industries Outlet
Tigard, Oregon
Goodwill Industries of the Columbia Willamette
Attn: Mr. Peter Collins
1943 SE Sixth Avenue
Portland, Oregon 97214
develo report s for exclusive use of the client for design of the
P in our proposal for this particular
and is not to be relied upon by other and
photographed, pho� i Parties. It is not to be
P e , or similarly reproduced in total or in
part without the expressed written consent of the client and PBS.
Prepared by:
PBS Engineering and Environmental
1310 Main Street
Vancouver Washington 98660
36 0.690.4331
PBS Project No: 72283.000
August 2006
Geotechnical Investigation Report
Goodwill Industries Outlet
In. ��: . • lumb:a W. 1,
TABLE OF CONTENTS
1.0 INTRODUCTION ................ ».
........................
1.1 Proposed Construction.......... »"' 1
1.2 Field ........................ .............. .......
.......
Exploration and Testing esting ..................
..... ...............................
2.0 SITE AND SUBSURFACE CONDITIONS 1
2.1 ITIONS ......... ».
Site Location and Description.. .... ................ .................. .........
............. ............... ...............................
2.2 Subsurf
ace Conditions ....... ....
....................
3.0
..............................
CRNICAL DESIGN C
RITERIA ... ». .. ».. »... ».. ».
.»..». .. »... » ...... »... ».. »... » »... 2
3.1 Foundation Design.
3.2
Floor Slabs ........ ............................... ................ ............................... 2
.......... ...............................
....... ...... ............................... 3
3.3 Retaining Structures ............
3.4 Sei ........................... ............ ............................... 4
smic ign Criteria ............................. ...............................
3.5 Pavement Design 5
.................
4.0 CONSTRUCTION RECOMMENDATIONS .. ».,»
4.1 Site ... » » »....... »..».» ».. » »..... » ...7
4.2 Preparation .................... ...............................
4.2.1 �W t Weather Conditions»....... » ............................................... ............................... 7
.. »..»..».. . ».. ».. »... ».. »... » ....... ».. »» .7
4 4.3 Excavation. ...................................................................................................................... 8
.4 Structural Fill s ......................................... . .................... ..
. ............................... .........
Soils .................. ...... ............................... 8
4.4.1 Native .......................
................ ...............................
4.4.2 Imported Granular Fills 4.4.3 Trench Bac ........................................................................................... 9
... ...............................
4.4.4 Retaining Wall B ................... 9
4.4.5 g ac 1 .............. 10
.....................
Trench Drain and • • ....................
Reta 10
4.4.6 Floor Slab Base and Footing Wall Drain Bacltfill
4.4.7 Pavement Base A g Aggregate
Aggregate ................ 10
4.4.8 ..... ...............................
Recycled Concrete, and B ..................
4.5 Pe halt Base Rock
rmanent Slopes . ............................... 11
4.6 Drainage Considerations .. ...............................
4.6.1 Surface ns .....................
and Subsurface Drainage Requirements 11
4.6.2 Foundation e9 wrements ......... ............................... ......11
Draws .............. ....
5.0 CONSTRUCTION OBSERVATIONS ........
6.0 LIMITATIONS ... 12
PBS t Report Date: August, 2006
Project #: 72283.000
Geotechnical Investigation Report
Goodwill Industries Outlet
G '11 • the bia Wiliam
SUPPORTING DATA
Appendix A — Figures
Figure 1 Site Location Map
Figure 2 Boring Location Plan
Appendix B — Boring Logs
B -1 to B-4 Borings B -1 through B-4
•
•
•
Report Date: August, 2006
Project #: 72283.000
PBS
1v
•
Geotechnical Investigation Report
Goodwill Industries Outlet
wil Indus
of him is Willamette
1.0 INTRODUCTION
PBS Engineering and Environmental (PBS) has completed the geotechnical investigation for the
proposed construction of a new Goodwill Outlet Store in Tigard, Oregon (Appendix A, Figure 1
— Site Location Map). The purpose of this report
locations within the site, and provide otechnical d design criteria and constructi specific
recommendations for earthwork, foundations, and pavements. on
1.1 Proposed Construction
The proposed facility is single -story retail building, approximate) 21 653
The construction will be typical on -grade slab with concrete tilt im y square o ee s
are not known at this time. We have up panels. Building loads
a loads n not known
kips and kip per linear maximum column and perimeter footing
near foot. The building will be located at 13880
Southwest Pacific Highway in Tigard, Oregon. At this point in time, the scope of grading
work is unknown. The owner is Goodwill Industries of the Columbia Willamette, 1943
SE 6th Avenue, Portland, Oregon. Parking area
miscellaneous improvements will be made as part of this pro��' utilities and other
1.2 Field Exploration and Testing
A total of four (4) borings were drilled to depths of 16.5 and 26.5 feet below ground
surface on July 28, 2006 using hollow stem auger
completed the borings. drilling techniques. Geotech/Boart
Longyear of Tualatin, Oregon, co � g plan of the approximate boring
locations is shown in
Appendix A of this report (Appendix A, Figure 2 — Boring
Locations Plan).
The subsurface materials encountered were logged and field classified in accordance with
the Manual - Visual Classification Method AS
tests (SPT, ASTM D 158 were rformed ate D 2488). In -situ standard penetration
and 5.0 -foot intervals there after. isturbed soil 2.5 intervals to a depth of 15 feet
locations using a split -spoon sampler and packaged in moisture -ri t � at these test
p
were backfilled with bentonite chips after �8• The so samp les
completion of soil log gags, The samp les
were re- examined in the laboratory to v les
presented in Appendix B Y field classifications. Borehole logs are
2.0 SITE AND SUBSURFACE CONDITIONS
2.1 Site Location and Description
The site is located at 13880 Southwest Pacific Highway in Tigard, Oregon. The site was
previously a 24 -Hour Fitness location. It includes a single -story structure and asphalt
concrete paved parking area. Access to the prope is from McDonald Street through a
temporary construction gate or from SW Pacific Highway through the adjacent parking
lot. The site is bordered on the north by SW Pacific Highway (99W) and a Chevron
Station, on the west by McDonald Street, on the east by Nelson's Tire Warehouse, and on
the south by a residential fence.
PBS 1 Report Date: August, 2006
Project #: 72283.000
Geotechnical Investigation Report
Goodwill Industries Outlet
G *II In '
of lum • W'11
2.2 Subsurface Conditions
The subsurface stratigraphy was observed in four (4) borings excavated using hollow
stem auger drilling techniques on July 28, 2006. The site is covered with a parking lot
and an abandoned building. The pavement section consists of a two-inch layer of asphalt
concrete over a four -inch layer of aggregate base rock underlain by very soft to very stiff
silt, with trace to some sand to the depth of exploration (26.5 feet). The soil was wet
below 7.5 feet below ground level.
The subsurface stratigraphy, as observed in four (4) bore holes, is summarized as follows:
STRATUM 1: Asphalt pavement, consists of 2- inches asphalt concrete over fl-
inches of aggregate base rock
STRATUM 2: Very soft to very stiff, gray, SILT with some fine to medium
sand
Damp
7 feet thick
STRATUM 3: Very soft to very stiff, brown, SILT with trace fine to medium
sand
Wet
Extends to an unknown depth
Groundwater: Groundwater seepage was observed at a depth ground surface at the time of exploration. of 7.5 feet below
3.0 GEOTECHNICAL DESIGN CRITERIA
3.1 Foundation Design
Based on our investigation and experience with similar soils, it is our opinion that the
proposed building can be supported on conventional spread footin
be supported on firm undisturbed native soils or structural fill.' footings should
Continuous wall and isolated spread footings should be at least 18 and 24 inches wide,
respectively. The bottom of exterior footings should be at least 24 inches below the
lowest adjacent exterior grade. The bottom of interior footings should be established at
least 18 inches below the base of the floor slab.
Footings bearing on firm native subgrade or structural fill should be sized for an
allowable bearing capacity of 2,000 pounds per square foot s
pressure. The weight of the footing and overlying backfill can be ignored in calculla n g
footing sizes. The recommended allowable bearing
plus long -term live loads and may be doubled for short -term loads such as those resulting
from wind or seismic forces.
Report PBS 2 t Date: August, 2006
Project #: 72283.000
Geotechnical Investigation Report
Goodwill Industries Outlet
G willIndustri of the W'llam
Based on our analysis the total post- construction settlement is calculated to be less than 1
inch, with post - construction differential settlement of less than %: inch over a 50 -foot
span for maximum column and perimeter footing loads of less than 100 kips and 4.5 kips
per linear foot.
Lateral loads on footings can be resisted by passive earth pressure on the sides of the
structures and by friction at the base of the footings. An allowable passive earth pressure
of 200 pounds per cubic foot (pcf) may be used for footings confined by native soils and
new structural fills. Adjacent floor slabs, pavements, or the upper 12 -inch depth of
adjacent, unpaved areas should not be considered when calculating passive resistance.
For footings in contact with native soils, a coefficient of friction equal to 0.30 may be
used when calculating resistance to sliding.
A qualified geotechnical engineer or their representative to confirm suitable bearing
conditions should evaluate all footing subgrades. Observations should also confirm that
loose or soft material, organics, unsuitable
Localized
d fill, old topsoil zones, has been removed.
materials eepening of footing excavations may be required to penetrate any deleterious
If construction is undertaken during wet weather, we recommend a thin layer of
compacted, crushed rock be placed over the footing subgrades to help protect them from
disturbance due to the elements and foot traffic.
The footings should be founded below an
the base of any adjacent, parallel utility imaginary line projecting at a 1:1 slope from
there is a minimum of 10 feet of horizontal distance be the must t 000tingss and
any adjacent, parallel slope. footings
Floor Slabs
Satisfactory subgrade support for building floor slabs can be obtained from the native
subgrade prepared in accordance with our recommendations presented below. A 6 -inch-
thick layer of imported granular material should be placed and compacted over the
prepared subgrade. Imported granular material should be crushed rock or crushed gravel
that is fairly well graded between coarse and fine, contains no deleterious materials, have
a maximum particle size of 1 inch, have less than 5 percent Standard No. 200 Sieve, and meet OSSC 02630.10 Dense Graded Aggregate 1"-0"
The imported granular material should be placed in 6- inch -thick lifts and compacted to at
least 95 percent of the maximum dry density as determined by American Society for
Testing and Materials (ASTM) D 1557. A subgrade modulus of 125 pounds per cubic
inch (pci) may be used to design the floor slab.
3 Report Date: August, 2006
PBS
Project #: 72283.000
•
Geotechnical Investigation Report
Goodwill Industries Outlet
G. ' 111.1_14 . . •.bia Will.
While groundwater is unlikely to be encountered within
native soils are fine the slab subgrade materials, the
grained and will tend to maintain high moisture content. The
installation of a vapor barrier may be warranted in order to reduce the potential for
moisture transmission through, and efflorescence o
flooring manufacturers often r � � on, the floor slabs. Additionally,
adhesives and will warrant equire vapor barriers to protect flooring and flooring
arrant their product only if a vapor barrier is installed according to
their recommendations. Actual selection and design of an
needed, should be based on discussions among members appropriate vapor barrier, if
g bens of the design team.
3.3 Retaining Structures
Our retaining wall design recommendations are based on the following assumptions:
the walls consist of conventional, cantilevered retaining wall (2) the walls are less than
8 feet in height; (3) the backfill is drained; and (4) the backfill has a slope flatter than 4H:
1V. Re -evaluation of our recommendations will be required if the retaining wall desi
criteria for the project varies from these assumptions. gn
Unrestrained site walls that retain native soils should be designed to resist active
pressures of 40 pcf where supporting slopes flatter than 4H: 1V. For embedded building
walls, a su seismic lateral force should be calculated based on a dynamic
force of 6H pounds per lineal foot of wall, where H is the height of the wall in feet, and
applied at 0.6H from the base of the wall.
If retaining walls are restrained from rotation prior to bein g bac
pressure shall be increased to 55 pcf. If other surcharges e. ��' the active earth
foundations, vehicles, etc.) are located within a horizontal distance from the back f
wall equal to twice the height of the wall,
accounted for in the wall desi then additional pressures will need to be
surcharges based upon the actualcn Our office should be contacted for appropriate wall
magnitude and configuration of the applied loads.
The wall footing should be a minimum of 24 inches below lowest ad
the footing excavations should be lined with a l 8 Then,
minimum 6 -inch -thick layer of compacted,
imported granular material. The granular materials should meet the imported granular
material requirements provided in the " Structural Fill" section of this
placed in one lift, and compacted to at least 92 percent of the �° should be
determined by ASTM D 1557. The wall footings should be designed dry density t as
the guidelines provided in the "Foundation Design" accordanc with
gn" section of this report.
These design parameters have been provided assuming
installed to prevent buildup of hydrostatic pressures behind all walls. If a drainage system
will
is not installed, then our office should be contacted for revised design forces.
The backfill material placed behind the walls and extending a horizontal distance equal to
at least half of the height of the retaining wall should consist of granular retaining wall
backfill as specified in the "Structural Fill" section of this report.
PBS 4 Report Date: August, 2006
Project #: 72283.000
Geotechnical Investigation Report
Goodwill Industries Outlet
• o the . , bia W' s.
The wall backfill should be compacted to a minimum of 95 percent of the maximum dry
density, as determined by ASTM D 1557. However, backfill located within a horizontal
distance of 3 feet from the retaining walls should only be compacted to approximately 92
percent of the maximum dry density, as determined by ASTM D 1557. Backfill placed
within 3 feet of the wall should be compacted in lifts less than 6 inches thick using hand -
operated tamping equipment (e.g., jumping jack or vibratory plate compactors). If flat
work (e.g., sidewalks or pavements) will be placed atop the wall backfill, we recommend
that the upper 2 feet of material be compacted to 95 percent of the maximum dry density,
as determined by ASTM D 1557.
A minimum 12- inch -wide zone of drain rock, extending from the base of the wall to
within 6 inches of finished grade, should be placed against the back of all retaining walls.
Perforated collector pipes should be embedded at the base of the drain rock. The drain
rock should meet the requirements provided in the "Structural Fill" section of this report.
The perforated collector pipes should discharge at an
a appropriate location away from the
base of the wall. The discharge pipe(s) should not be tied directly into storm water drain
systems, unless measures are taken to prevent backflow into the wall's drainage system.
Settlements of up to 1 percent of the wall height commonly occur
to the wall as the wall rotates and develops active lateral earth pressures. Co s quently,
we recommend that construction of flat work adjacent to retaining walls be s tpo a at
least 4 weeks after bacl�lling of the wall, unless survey data indicates that settlement at
complete prior to that time.
3.4 Seismic Design Criteria
We understand that the seismic design criteria for this project is based on the 2003 IBC,
Section 1615. The seismic design criteria, in accordance with the 2003 IBC, are
summarized in Table 1.
Table 1: IBC 2003 Seismic Design Parameters
Short Period 1 Second
Maximum Credible Earthquake Spectral
Acceleration S, = 0.94 g SI = 0.34 g
Site Class D
Site Coefficient F, = 1.12
F,, = 1.7
Adjusted Spectral Acceleration
S,,s =1.06g S MI =0.58g
Design Spectral Response Acceleration
Parameters Sp = 0.71 g SDI = 0.39 g
Design Spectral Peak Ground Acceleration
0.28 g
PBS 5 Report Date: August, 2006
Project #: 72283.000
Geotechnical Investigation Report
Goodwill Industries Outlet
will Indus. ' , o the • himbia Willamette
3.5 Pavement Design
Our pavement recommendations are based on the following assumptions:
• A resilient modulus of 4,500 psi was assumed for the native site soils.
• A resilient modulus of 20,000 psi was estimated for the base rock.
• Initial and terminal serviceability
• • Reliability and standard deviation 85 percent 0.45 respectively rr pctiv. y
Structural coefficient of 0.42 and 0.10 for the asphalt and baseerock, lrespectively.
• We have assumed the following Equivalent Single
apply to the two proposed streets at the site: Axle Loads ( ESALs) values
o Parking Lots — 10,000 ESALs
o Driveways — 50,000 ESALs
If any of these assumptions are incorrect, our office should be contacted with the
appropriate information so that the pavement designs can be revised.
Our pavement design recommendations are summarized in Table 2.
Table 2: Minimum Pavement Sections
Traffic Loading AC
Ad Base Rock
inches inches
10,000 3.0
50,000 8.0
4.0 8.0
The thicknesses shown in Table 2 are intended to be minimum acceptable values.
The asphalt cement binder should be PG 70-22 Performance
according to OSSC 00744.11 — Grade Asphalt Cement
according
hot mix C 074 The Asphalt Cement and Additives. The AC should consist of
should conform to OSCC 00744.13 an thicknesses Should be 2.0 inches. The AC mpacted to
Density of the mix, as determined in accordance with ASTM D 2041 91 percent of Rice
The pavement subgrade should be prepared in accordance with the "Site Pr
"Structural Fill" sections of this report. eparation" and
Construction traffic should be limited to non - building, unpaved rtions site or haul roads. Construction traffic should not be allowed on new paveem en� eIf
construction traffic is to be allowed on newly constructed road sections, an allowance for
this additional traffic will need to be made in the design pavement section.
PBS 6 Report Date: August, 2006
Project #: 72283.000
Geotechnical Investigation Report
Goodwill Industries Outlet
I In • th bia Wilmette
If moist soil conditions make it difficult to properly moisture condition and compact the
roadway subgrade, then the use of cement amendment should be considered as alternative
to moisture conditioning and compaction. The use of cement amendment will allow for
construction of the pavement sections without disturbing the sensitive soil subgrade. If
this method is chosen, our office should be contacted for additional recommendations and
alternative pavement sections.
4.0 CONSTRUCTION RECOMMENDATIONS
4.1 Site Preparation
The site is covered with asphalt parking lot and an old abandoned building. Site
preparation will include demolition of the building, and removal of asphalt in the areas of
new building and parking lot areas. Demolition should include removal of existing
improvements throughout the project site. Underground utility lines, vaults, basement
walls, or tanks should be removed or grouted full if left in place. The voids resulting from
removal of footings, buried tanks, etc or loose soil in utility lines should be backfilled
with compacted structural fill. The base of these excavations should be excavated to firm
subgrade before filling with sides sloped at a minimum of 1H: IV to allow for uniform
compaction.
Materials generated during demolition of existing site or stockpiled in areas designated g improvements should be transported
off
el
site stockpiled
be gnated by the owner. Asphalt, concrete, and base rock
may crushed and recycled for use as general fill. Such recycled materials
should meet the criteria described in the "Structural Fill" section of this report.
4.2 Proof Rolling
Following stripping and prior to placing fill, pavement, or buildin
exposed subgrade should be evaluated by proof rolling. The subgrade sh gun sh et the f
rolled with a fully loaded g ould be proof
to identify soft, loose, or unsuitable areas. similar heavy
our o °S�ction equipment
observe the proof rolling. Soft or loose zones identified during the field evaluation should
be compacted to an unyielding condition or be excavated and replaced with structural fill,
as discussed in the "Structural Fill" section of this report.
4.2.1 Wet Weather Conditions
Trafficability on the near - surface soils may be difficult during or after extended
wet periods or when the moisture content of the surface soil is more than a few
percentage points above optimum. Soils that have been disturbed during site
preparation activities, or soft or loose zones identified during probing or proof
rolling, should be removed and replaced with compacted structural fill.
PBS 7 Report Date: August, 2006
Project #: 72283.000
Geotechnical Investigation Report
Goodwill Industries Outlet
Industri th lumbia Willamette
Track - mounted excavating equipment may be required during wet - weather. The
thickness of the granular material for haul roads and staging
the amount and type of construction traffic. A 12- to areas
8-- 18-inch-thick mat mat of
imported granular material is sufficient for light staging areas. The granular mat
for haul roads and areas with repeated heavy construction traffic typically needs
to be increased to between 18- to 24- inches. The actual thickness of haul roads
and staging areas should be based on the contractor ' s
development and the amount and approach to site
granular material should be placed type one lift over the tr affic. The imported
subgrade and compacted using a smooth prepared, undisturbed
a geotextile fabric should be placed smooth- drum, non - vibratory roller. Additionally,
P barrier between the subgrade and
imported granular material in areas of repeated construction traffic.
As an alternative to placing thick rock sections to support construction traffic, the
subgrade can be stabilized using cement amendment. The depth of treatment and
percentage of cement required depends on the site conditions at the time of
construction. Additional recommendations will be provided during constructio
if this approach is used.
43 Excavation
Subsurface conditions at the project site show predominately fine -
depth explored. Excavations in these soils may be readily � s to the
fi wi
conventional earthwork equipment. n'°mplised�
Trench cuts should stand vertical to a depth of approximate) 4 fee
groundwater seepage is present in the trench walls. y provided no
excavate trenches with depths between 4 and 8 feet, with walls of the eexcavat cut
at a slope of 1 H:1 V, groundwater seepage is not present, and with the understanding that
some sloughing may occur. The trenches should be flattened to 1 %H: l V if excessive
sloughing occurs or seepage is present.
Use of a trench shield or other approved temporary, shoring is recommended for cuts that
extend below groundwater seepage or if vertical walls are desired for cuts deeper than 4
feet. If shoring is used, we recommend that the
type and design of the shoring system be
the responsibility of the contractor, who is in the best position to choose a system that fits
the overall plan of operation. All excavations should be made in accordance with
applicable Occupational Safety and Health Administration and state regulations.
4.4 Structural Fills
Fills should be placed over subgrade that has been prepared in conformance with the
Section 4.1 of this report. Material used as structural fill should be free of organic matter
or other unsuitable materials and should meet specifications provided in Oregon Standard
Specifications for Construction, Oregon Department of T
depending upon the application. These materials are discussed beloow tiOn, 2002 (OSSC),
PBS 8 Report Date: August, 2006
Project #: 72283.000
Geotechnical Investigation Report
Goodwill Industries Outlet
will In . es th lumb'a W 'llam
4.4.1 Native Soils
The native soils are suitable for use as general fill, provided it is properly
moisture conditioned and meets the requirements of OSSC 00330.14 and
00330.15 — Borrow Material. Laboratory testing indicates that the moisture
content of the near- surface silts is greater than the soil's optimum moisture
content required for satisfactory compaction. In order to adequately compact the
soil, it may be necessary to moisture condition the soil to within a 2 to 3
percentage points of the optimum moisture content. Moisture conditioning will be
difficult due to the fine- grained nature of the soil.
The native soils should be placed in lifts with a
thickness of 6 to 8 inches and compacted to at least 92 percent of the maximum
dry density, as determined by ASTM D 1557.
4.4.2 Imported Granular Fills
Imported granular material should be pit or quarry run rock, crushed rock, or
crushed gravel and sand and should meet the specifications provided in OSSC
00330.12 — Borrow Material, and OSSC 00330.13 — Selected General Backfill.
The 1 mported granular material should be fairly well
fine material and have less than 5 � graded between coarse and
No. 200 Sieve. percent by weight passing the U.S. Standard
Imported granular material should be placed in lifts with a maximum non-
compacted thickness of 8 to 12 inches and be compacted to at least 95 of
the maximum d by ASTM D 1557ry density, as determined b ge et
grade conditions or when wet sub 1557. During percent
wet
ns exist, the initial lift should be
approximately 18 inches in non - compacted thickness and should be compacted
with a smooth-drum roller without using vibratory action.
Where 1m ported granular material is placed over wet or soft soil sub d
recommend a geotextile be placed as a barrier between the sub imported we
granular material. The geotextile should meet OSSC 2320.10 fforsoil sep
and/or stabilization. The geotextile should be installed in conformance with OSSC
00350.40 — Geosynthetic Construction.
4.4.3 Trench Backfill
Trench backfrll placed beneath, adjacent to, and for at least 2 feet above utility
lines (i.e., the pipe zone) should consist of well-grad
maximum particle size of 1' /2 inches, have less than 1 percent y we ght pas
the U.S. Standard No. 200 Sieve, and meet OSSC 405.12 - Pipe Zone Bedding.
The pipe zone backfill should be compacted to at least 90 percent of the
maximum dry density, as determined by ASTM D 1557 or as required by the pipe
manufacturer or local building department.
9 Report Date: August, 2006
PBS Project #: 72283.000
Geotechnical Investigation Report
Goodwill Industries Outlet
11 In of the o bia Wi lamette
Within roadway alignments or beneath building pads, the remainder of the trench
backfill should consist of well - graded, granular material with a maximum particle
size of 2Y2 inches, have less than 10 percent by weight passing the U.S. Standard
No. 200 Sieve, and meet OSSC 405.14 - Trench Backfill, Class A or B. This
material should be compacted to at least 92 percent of the maximum dry density
as determined by ASTM D 1557, or as required by the pipe manufacturer or local
building department The upper 2 -feet of the trench backfill should be compacted
to at least 95 percent of the maximum dry density as determined by ASTM D
1557.
Outside of structural improvement areas e.
pads) trench backfill � g•, roadway alignments or building
placed above the pipe zone may consist of general fill
materials that are free of organics and materials over 6 inches in size, and meet
OSSC 00330.12 — Borrow Material and OSSC 405.14 - Trench Backfill, Class C,
D or E. This general trench backfill should be compacted to at least 90
the maximum dry density, as determined by ASTM D 1557 or as percent of
Y
pipe manufacturer or local building 1equirrd by the
� �P�rent.
4.4.4 Retaining Wall Back88ll
Backfill material placed behind retaining walls
distance of Y211, where H is the height of the retaining wal , s a
consist of
select granular material meeting OSSC 510.12 — Granular Wall Backfill. We
recommend the select granular wall backfill be separated from enera!
soil, and/or topsoil using a geotextile fabric that meets the g native
in OSSC 2320.10 for drainage geotextiles. The geotextile should be installed in
conformance with OSSC 00350.40 — Geosynthetic Construction.
4.45 Trench Drain and Retaining Wall Drain Backfill
Backfill for subsurface trench drains and fora minimum _
the back of retaining walls should consist of drain rock meeting the
zone against
provided in OSSC 00430.11 — Granular Drain Backfill Material. A pr c fabrica ed
drain board can be substituted for the
wrapped in a geotextile fabric meetin � n rock. The drain rock should be
g specifications provided in OSSC
2320.10 for soil separation and/or stabilizatio The geotextile should be installed
in conformance with OSSC 00350.40 — Geosynthetic Construction.
•
4.4.6 Floor Slab Base and Footing Base Aggregate
Base aggregate for floor slabs should be clean,
The base aggregate should contain no deleterious materials, meet sp cifica
provided in OSSC 02630.10 — Dense Graded Aggregate 1 " -0 ", and have less than
5 percent by weight passing the U.S. Standard No. 200 Sieve. The imported
granular material should be placed in one lift and compacted to at least 95 percent
of the maximum dry density, as determined by ASTM D 1557.
Report
PBS 10: August, 2006
Project #: 72283.000
•
Geotechnical Investigation Report
Goodwill Industries Outlet
a+i • , on - o the a bia W'll. , tte
4.4.7 Pavement Base Aggregate
Imported base aggregate for roads and parking lots should be cl
or crushed gravel. The base aggregate should meet the �' crushed rock
02630.10 — Dense Graded Aggregate 1"-0", with the exception ce t that the in
should have less than 5 percent passing a U.S. Standard No. 200 Sieve. The base
aggregate should be compacted to at least 95 percent of the maximum dry density,
as determined by ASTM D 1 557.
4.4.8 Recycled Concrete, Asphalt and Base Rock
Asphalt pavement, concrete, and base rock from the existing site improvements
can be used in general structural fills, provided no articles
p greater than 6 inches
are present. It also must be thoroughly are no voids between the fragments. mixed �� soil, sand, or gravel such that
ments. The recycled materials should meet the
requirements set forth in OSSC 00744.03 — Reclaimed Asphalt Pavement (RAP)
Material.
4.5 Permanent Slopes
Permanent cut and fill slopes should not exceed a
gradient of 2H:1V for a maximum
height of 8 feet. Taller slopes or steeper slope gradients should be evaluated on a case -by-
case basis. Fill slopes should be over -built by at least 12 inches and trimmed back to the
required slope to maintain a firm face.
Slopes should be planted with appropriate vegetation to rovide
P protection against
erosion as soon as possible after
grading. Surface water runoff should be collected and
directed away from slopes to prevent water from running down the face of the slope.
4.6 Drainage Considerations
4.6.1 Surface and Subsurface Drainage Requirements
The Contractor shall be made responsible for
temporary groundwater as necessary to prevent ater andlo r erosion at water
standing the
working surface. We recommend removing only the foliage necessary for
construction to help minimize erosion.
The ground surface around the structures should be sloped to create a minimum
gradient of 2% away from the building foundations for a distance of at least 5
feet. Surface water should be directed away from all buildings into drainage
swales or into a storm drainage system. "Trapped" planting areas should not be
created next to any building without providing means for drainage. The roof
downspouts should discharge onto splash blocks or paving that direct water away
from the buildings, or into smooth -walled underground drain lines that carry the
water to appropriate discharge locations at least 10 feet away from any buildings.
PBS Report Date: August, 2006
Project #: 72283.000
Geotechnical Investigation Report
Goodwill Industries Outlet
Goodwill Industries of the Columbia Willamette
4.6.2 Foundation Drains
We recommend foundation drains around the perimeter foundations of all
structures, including building and tanks. The foundation drains should be at least
12 inches below the base of the slab. The foundation drain should consist of
perforated collector pipes embedded in a minimum drain rock. The drain rock should meet specifications provided ed the "Structural
Fill" section of this report. The drain rock should be
fabric. The collector pipes should discharge at an appropriate location away from
the base of the footings. Unless measures are taken to prevent backflow into the
wall's drainage system, the discharge pipe should not be tied directly into storm
water drain system.
5.0 CONSTRUCTION OBSERVATIONS
Satisfactory pavement and earthwork performance
depends monitoring of the contractor's activities is a key part the quality t t the work is
� specifications. We recommend that
completed in accordance with the construction drawings y P o o f determining that construct
work t
a geotechnical engineer from PBS Engineering
stripping, fill placement, footing subgrades, be retained to observe general excavation,
g grades, and subgrades and base rock for floor slabs and
pavements.
Subsurface conditions observed during construction should be compared with those encountered
during the subsurface explorations. Recognition of changed conditions requires experience;
therefore, qualified personnel should visit the site with sufficient frequency to detect whether
subsurface conditions change significantly from those anticipated.
6.0 LIMITATIONS
This report has been prepared for the exclusive use of the addressee, and their architects and
engineers for aiding in the design and construction of the proposed development. It is the
addressee's responsibility to provide this report to the appropriate design
professionals
officials, and contractors to ensure correct implementation of the recommendations.
'building
The opinions, comments and conclusions presented in this report were based upon information
derived from our literature review, field investigation, and laboratory testing. Conditions
between, or beyond, our exploratory borings may vary from those encountered. Unanticipated
soil conditions and seasonal soil moisture variations are commonly encountered and cannot be
fully determined by merely taking soil samples or soil borings. Such variations may result in
changes to our recommendations and may require that additional expenditures be made to attain
a properly constructed project. Therefore, some contingency fund is recommended to
accommodate such potential extra costs.
PBS 12 Report Date: August, 2006
Project #: 72283.000
a ,
Geotechnical Investigation Report
Goodwill Industries Outlet
Goodwill Industries of the Columbia Willamette
If there is a substantial lapse of time between the submission of this report and the start of work
at the site; if conditions have changed due to •natural causes or construction operations at, or
adjacent to, the site; or, if the basic project scheme is significantly modified from that assumed, it
is recommended this report be reviewed to determine the applicability of the conclusions and
recommendations.
Sincerely,
PBS ENGINEERING AND ENVIRONMENTAL
•
• ► i
�_-- �
•
‘
Af
[RtkjiWS33
•sting emberry
Engineering Staff Senior Geotec Engineer
•
PBS 13 Report Date: August, 2006
Project #: 72283.000
�
b
r�
r�
•
10-1,.! \ : -. • k 7-
\ ' ..\• • i L . ' , -..-r - ,:v. ". - i • 7-.:...5 ..1-_,.....,-,
**--.\ •,,..... 41411 •..... '' ..I N IFre• - •174 _.: : .,',..- C .. . _ .
, _ - r "-• . 2 t -7111 j 13, Z . " - -. 4 5 - 4. 1 •c!: " "t • rv-11 . Te RA -...-0t3F
....
..
„ .1 1. 1... ,_ ,9 h ' %.....„1•14;) • '" ' • %Min •:'•• ..-■
to.
ro- ) , ...,,irtt ' - .61•9'
' 44 ___S•41,",,IR I All;,..- ••-,... - Z . ...M r°
Pr
X 4• 1 4 ' - , 41 4111Limr; r-- "''" :- ......... , - . ..... -4 '.'. .. - ' - • - -- -0 - ' . 4 1-6*. --
I .,. ; ,.. N. ' N ab - it 2: 7, 1 . . .... s. • . r , .„ .. , . .
r......- • : 1 1 ........../ r,,...' .. ,s-
) . ..,,,,, 1 II _,, - ■ ' .- Jos 'I. I.
\- I •.& 44 : - 31.7 ...--A :.. • :. • • (
i.; °•' 4'. -'---. N
, . ....,,,-- i_ • :. -- .-:,.* : ... .' - -: . 1 / 4 -
• i f 'env • ' t.. V - li ........ S. ••• „ 1 ,...1,.‘ .S n .. . -..,' .,. .,. ■ - 1' li
. i f rpi Se ,
. ,,....
ip ...5:: .
I ; Z.:
----•••■ • - - 1. ' '..-' • il„„4, .. ,
. k ' ' ' ..; A:e} • ' 1 ? & 11161)1b:Ir — -":"-- a 7 4 1 111. 4'1 - 4 ;:". . -‘ I ' "t ----
ir.....P44 ofyin A 1,,
/1 ,,,,,
....•
- 4..." • , V:404 • -, , • . 8
• •-•1: -- • • *: :'÷-;--
• 1 1 ,-..j i.' 111.. t 1141 . s.4Y .
!le: - ...: OA _. ) 1 '1 " X pi orib. AA ti ..) . A.,. ,.,11■,
. 1 • .! . ,-. , . „Am..- . 4.....7 - -, j „,,,,, ,-,.. „, . . , . :614 .
P 1 -1 ..k. ' _..,c ....: .7‘ ), .41 • .
/.
c ; . 7..... ,..... rAile ,_,• „......_ ••• . 4. / t, ,, , ,.. t ior•. - ,_ " to, i
-,......c i .. -2.--- . A zritu=ul darlinik erp. :111„ e r 4 ' 'IX; . :- Fl -, '* ,-..W AN. l e
4
dirm i ..
. ; ty, wits ...,-, , I t jig .'" •
,„ ■ , ; " • - ' i • .•‘^ • - -., -: - ../ \ , 4 .0 1,4,..)'*y■ - . 171 39 4;
-.• Ri,:v f .•.:,., : if , :... : - .1, R,.. . mp -, • LOCATION - - 1 40 7 - 1-1c --t 4. •s A '4
'.-- . ,.. • 400 ',. 1.:,,P p I ,__,____%,__•• . PROJECT , . wT - • .Cfs
. I, .1 , , -4i * 1 ; : / / .. 3 1 V • 1111,00R.V :e.ottl r..--- - . ,
c
,44.:4:'-$9 _../.4,,,,,._,,,...........---v-r;
, .. ,,,, --*•• , ..,0 .... 11,
..._.,. , ,
c2...Y ,... .
-,.. ,2 4, Li k.-..--_-).....01 ir.2. ... ,.4 Ai- I , A. At ,,,-.7„. u
,. .- 4 , \ • • -r - ... ..... i ' ... ,, _ ..,...,_.„.:--sri, ,--i4
„„. ....,,
, .- , ,f. t.,, • V" -17 ,4:4*__"f. ril' c , ,,V tr , sv -- : _ -
._-::,- • ,,., , -,.. 7 •_,.._--:::. • ' i
-- m- - --
-- 1). il ie• e i. -4„ c-... Nt 0- .), ' ,Jr( .. . ........ _ .•,..•
r ' ' w ..a I > : •
I 1 - .I ---'•"' " • "V•e; ';r.4 % ,-,/ 0 ,-1.---% .---4-A=..-4 *IQ --,,,,,,,- -, .. , ...-,--
1 , 1 7 / 1 7 Tv . -, ,, ,ii i r . ,_,___, % ,
.- -- , - ,:,,, z> ,, ,„_ ::- - ,,.• eiuz cd , , F ry/ , _ __-_. ...,„ __.,, , _ /,.. . , „ _ _ _ .., .., . 7 , 1:;:ii .
...a.
r ,i ,._W_,f=__ :
i
,
. .. .
; .-:=-----...',..-,---",...--,;,.,,,---, L--.p. ' - "-?• • . 1.: ' No - •
/;.; •-••■••" 'r '"•■-■?. - ,.' ."`",,•.-...?'„‘. i gt\ - :•-, I . . 1\ 7 . :N . ..M....,, .
,• //
...44. -......-.. ■• ' •• - X • • :t )LS"--: 7 ...... .----- - - - ,....
‘ ............ z...,._ ,- ,- ,.... -.:44_ 7.;_ . , , :■ 1---- - 41 ( 6 2 9 API • le
•• ::::''.' ,: CV. •'-,:-! :
40
.... ',......„ .: • z.,... :■---,__L - ---_ . - 1.:
J •i . •
_•::: ..- . "
• ' A • • & - * d / ' I
... •,,,••■.!
'1 • , ' . .. . -; 7 • ' - - ...-...-;2'..!, ' -- •t -. i . - -..... :..7".......!...)
t • --- - ' -- ..,* fi.
dweb Arii fill
ir Pli-rat ' i '' . • '‘
it i
AL.41.- • - _....• A i,..!_____,„, i • 0 - •
L.! _ ••• • ID` • •
I 1 . •r• _. 1 ' 1•••• _ _ _
e • ltr' - . •/..--- a • '-
•• ■ —a . i • . 0
SOURCE: LOS BEAVBRION QUADRANGLE. OR. 1981,
SITE PHOTO REWSED 1984.
1 ' KerrtAra)
• must PN
I • BUGENEI ■■
SCALE:1" IT 2,000'
OREGON
Prepared for: GOODWILL
s ........ Project*:
_ ...........
; ."--=-• .---- 72283.000 SITE LOCATION MAP FIGURE
PBS Dem
AUGUST 2006 13880 SW PACIFIC HIGHWAY (99W) 1
TIGARD, OREGON
•
•
I
/ / I
i
I
I
il
r A r
/ d'- lam r I �
-! Mt . '
twoo,i
. , —
• -
•
# i r , 106 ,... It i
.... ____
, r f r !
et i i . .- ` I \I II® ( i,.!
4 / : ' 4 d NI fir MI - - ■
.24 Wawa
A4 + \ . I
4h. elow
/ 1 / , , II \ i .
., \ .. \ , .:: 1
1 is ii
\ s_c 6 , :: 1 1' T / , t \ _ 11 i s M ,
SEIM NI MINI
•ter I R
,\ \ \ A ,.... � 1 LI i 2 I �i-i 1`11
1 _ �` - _t`' --�- r_7 -- 1.._:._, Li- - 1 7r
I
. LEGEND
4' 4 . BORING LOCATION AND NUMBER
B-1
i NOT TO SCALE
s ��� Prepared for: GOODWILL
t . Project 1
72283.000 SITE 'VICINITY PLAN Dow
A UGUST 2006 FIGURE
13880 SW PACIFIC HIGHWAY (99W) 2
B TIGARD, OREGON
APPENDIX B - BORING LOGS
. .
PBS GEOTECH BORING W/ WELL INSTALL BORE LOGIS.OPJ PBS LOCI.ODT 118/041
I
- 7 0 • . •
50 7 1111 I I I i 1 I 1 I ■ i „ Cli 8 us ° i I i g g
1 ' " ' I ' ' ' ' I ' . . . 1
(3 A G)
h f
m tf .d
is gi If g 1 11X t
111 fu-4. le J I, 11 4 5 a
r I $
41 m. 1 I
I 5
A I g 17 = s (i)
0
co
i 1 i a
a ,
m I §
=
_.
a< 1
1 _ .
el PI' ** I pi
gF 'I F 7,11
bi, 1 0.
-. pg. -II . NI.Toloil.-4,0 I
.s_3. .
a . ,,, - -
z P t
' • \ • \ ‘
5 co 1
. . . .
o • . . . \ • \\ , , \4
- " ` N in
N =
p in
\\ 111
cp
I.
. ... ...\ ....\ .
. \ • .. \\. • ' -- N --
... ..... ....\...A .... F I
P1
.,,
.
Co
CD i if I 1 1
0
PBS GEOTECH BORING W/ WELL INSTALL BORE LOOS.OPJ PBS LOO.ODT 8/&108
I -.
M O t t I t I t t t I ■ t t t I t t I t I COI t t t t of t t t t I t t t t t0
CD Fr
R GI
N
:I'd i f 1
ii
"1ST II ill . P a
NV IN k
ijI If c
I f
ay
0
rn I r
o
3 . I
I (If d 1
0 at I NI ,..
_ .
ill
, \\ 1' I'I " IIL
1 . o
N \ \\\
\ i
Pi -
..
�..�.
m �
2. ! / 1
...►
IV
a
' .
PBS 0E07E04 BORING W/ WELL INSTALL BORE LOGS.OPJ PBS LOG.00T WOO
I
mO II -8 q i -I i 3 fi • • '
al E F
n 111
4 te 1 1
It g - 314 0 5 a -
ON 11 1 k A
iFi' 1
o n
I
Illii ii I
2. 1
a ti R
4 ' m g
0
0
! i I'
1 ff
I aril
1 1
M
3
S.
a
3 - ---N
3 0
0 Et g F'i 11
= b,. . p ..
_
• I
T .a.:-.1t---.. .
a. a
a , 1--;.. \. .\-:;--11., f -
z ; \ • , . , n
P t
5 co • N ‘
'''''%,•,•, • ,‘\ ■
3. 0 \ \ ..‘
I F II I '
\-
z . N . L II g IRE
& . ..: ..\\ • ...\
(0 . ....\ .:...\:... - •‘ .:... 11 i
§ CO . • '' . \ • ... \ ''' ..\ ".- \ • .. .
F i p
.. \ • .... \ is
_
13
I
B) (0
CD
ijr i t
.
-.
PBS 0E07E01 BORING WI WLL O.
E INSTALL BORE LOOS.OPJ PBS LOODT MOO '
I • i
_ _ �I i -ti C1 W to 8 N o N o i[ O
if ri
. E _I .. 0 I 1
F l i p ; 'hi f
i 1 1 1$4
i .,
8 p C
° Si.
` 5 I §) 1
' N N
g g. j (0
I is 1 •
n)
e
m ler
< `
O 3 11 in
O N o g 'if
NI N N
13 / �/ �/ li
�� �/ 5
.\ ,' '� \♦ \ T N
O o \ .
. \�
p CO N . . \ N \ 1S 1 g
8 \ . \ \ 8
d
m i if
EL