SPECIAL INSPECTION
FINAL REPORT
DATE: June 11, 2007
PROJECT: Goodwill Tigard
PERMIT #: BUP2006 -00574
ADDRESS: 99W & McDonald
CITY: Tigard STATE: Oregon
Fie cop T
To Whom It May Concern:
ACS Testing, Inc. attests that their inspectors performed special inspection(s) on a
continuous and/or periodic basis as required by the specific jurisdiction and/or UBC. Special
inspection(s) were performed for the following:
Reinforced Concrete
Structural Steel
Expansion Anchors
Adhesive Anchors
Rebar Dowels
Based on personal observation, inspection and reports reviewed by me for the above project,
I attest on behalf of ACS that work was performed to the best of my knowledge, in
accordance with approved plans, specifications, and the applicable codes and standards for
this jurisdiction.
Approved by:�
BOB BROWN
President
•
BB /cs
•
c-c7 B 7 �f
PBS PORTLAND
SEATTLE
VANCOUVER
EUGENE
*G� 01 BEND
June 8, 2007 , l 1
N TRI- CITIES
J� r `g, „ O B A N D O N
Goodwill Industries
Attn: Mr. Peter Collins 8
c/o LCG Pence Construction, LLC •
Mr. Brian Poissant
2720 SW Corbett Avenue
Portland, OR 97201
Re: Goodwill Tigard
13920 SW Pacific Highway, Tigard, Oregon FILE COPY
PBS Project No. 72283.000 Task 0002
Dear Mr. Collins:
We are pleased to provide this summary letter for our construction observation services for the Goodwill
Tigard store located at 13920 SW Pacific Highway in Tigard, Oregon. ACS testing of Tigard, Oregon
provided materials testing services for this project.
We provided visual observation services; cement treatment, compaction testing, proof roll observation,
footing and pavement subgrade observation during the course of this construction. Details of our field
observations are provided in our field reports from January 24, 2007 through May 23, 2007. Based on our
periodic and full time observation services the geotechnical elements of this project were in general
conformance with the plans and specifications.
We retained ACS testing to provide materials testing and special inspection services. The summary letter of
construction from ACS is attached with the letter. Based on this letter'and periodic inspection and testing,
the project items constructed are in general accordance with the plans and specifications. •
Please call the undersigned if you have any questions.
Sincerely, E ® P�
�G % 3
; .111' D6/0/04..
OREGON
IRES 12/3i/