Loading...
Report GeN et1 7409 SW Tech Center Dr. Ste. 145 Tigard, OR 97223 Ph: 503 -443 -3799 Fax: 503 - 620 -2748 rnnx. or Map N ,� g ots B SPECIAL INSPECTION FINAL REPORT DATE: June 11, 2007 PROJECT: Goodwill Tigard PERMIT #: BUP2006 -00574 ADDRESS: 99W & McDonald CITY: Tigard STATE: Oregon Fie cop T To Whom It May Concern: ACS Testing, Inc. attests that their inspectors performed special inspection(s) on a continuous and/or periodic basis as required by the specific jurisdiction and/or UBC. Special inspection(s) were performed for the following: Reinforced Concrete Structural Steel Expansion Anchors Adhesive Anchors Rebar Dowels Based on personal observation, inspection and reports reviewed by me for the above project, I attest on behalf of ACS that work was performed to the best of my knowledge, in accordance with approved plans, specifications, and the applicable codes and standards for this jurisdiction. Approved by:� BOB BROWN President • BB /cs • c-c7 B 7 �f PBS PORTLAND SEATTLE VANCOUVER EUGENE *G� 01 BEND June 8, 2007 , l 1 N TRI- CITIES J� r `g, „ O B A N D O N Goodwill Industries Attn: Mr. Peter Collins 8 c/o LCG Pence Construction, LLC • Mr. Brian Poissant 2720 SW Corbett Avenue Portland, OR 97201 Re: Goodwill Tigard 13920 SW Pacific Highway, Tigard, Oregon FILE COPY PBS Project No. 72283.000 Task 0002 Dear Mr. Collins: We are pleased to provide this summary letter for our construction observation services for the Goodwill Tigard store located at 13920 SW Pacific Highway in Tigard, Oregon. ACS testing of Tigard, Oregon provided materials testing services for this project. We provided visual observation services; cement treatment, compaction testing, proof roll observation, footing and pavement subgrade observation during the course of this construction. Details of our field observations are provided in our field reports from January 24, 2007 through May 23, 2007. Based on our periodic and full time observation services the geotechnical elements of this project were in general conformance with the plans and specifications. We retained ACS testing to provide materials testing and special inspection services. The summary letter of construction from ACS is attached with the letter. Based on this letter'and periodic inspection and testing, the project items constructed are in general accordance with the plans and specifications. • Please call the undersigned if you have any questions. Sincerely, E ® P� �G % 3 ; .111' D6/0/04.. OREGON IRES 12/3i/ 1310 Main Street Vancouver, WA 98660 Rajiv Ali, P.E., G.E. 360.690.4331 MAIN Senior Geotechnical Engineer 360.696.9064 Fax 688.873.7273 rouL FREE ENGINEERING AND ENVIRONMENTAL www.pbsenv.com