REVISED
November 4, 2003
MEMORANDUM
TO: Jeanne Niemer, Carlson Geotechnical
Brian Ranney, Carlson Geotechnical
FROM: Havlin G. Kemp. P.E.
VLMK Consulting Engineers
PROJECT: Quick Lube
13565 SW Pacific Highway
Tigard, Oregon
SUBJECT: Foundation Drains
VLMK Consulting Engineers are the Engineers of Record for the above noted project. We have
completed both the Civil Engineering and the Structural Engineering on the project. As noted in the
Geotechnical Report prepared by Carlson Geotechnical for this project, dated March 14, 2003, the water
table on this site occurs near the level of the basement for this building.
The Geotechnical Report recommends, "foundation drains be placed around all foundations." This is not
possible at the basement level because the deepest storm water outfall invert elevation is above the
basement elevation. VLMK Consulting Engineers has designed the basement to have a waterproof
membrane at the exterior of the concrete basement slab and walls. These walls have been designed to
resist the hydrostatic pressure of the water. Additionally, the dead load of the basement slab and walls is
sufficient to eliminate any buoyancy of the structure.
At the first floor of the building, the foundations occur within 4 -feet of existing. site grades. The finished
grade at the exterior walls on the north and east sides will be below the finish floor elevation. At the
south side, the full length of the south wall will be a concrete patio, eliminating the possibility of
rainwater infiltration at the foundation. The west side the is adjacent to the repair area (1% lrh
basement) and the remaining wesi rounuLLtwn is adjacent to paved approach and departure drives. Thus
there is no possibility of rainwater infiltration at the west foundation.
Given the above information, please issue a letter modifying your drainage recommendations to eliminate
the requirement for foundation drains on this project. We will forward the letter to the City of Tigard.
cc: Michael Denton o y
Tim Horst 17,3.2
Bill Lambert, VLMK
/ "j . �
:x() (— 3 1 . - , — c )
' Structural Engineering • Civil Engineering • Industrial Engineering • Planning • Studies / Evaluations • Entitlement
11/10/03 MON 14:46 FAX 503 670 9147 CARLSON TESTING -►-► -► VLMK 1jj001
Carlso Geotechnical Main Office Salem Office Bend Office
P.O. Box 23814 4060 Hudson Ave., NE P.O. Box 7918
A Division of Carlson Testing, Inc. Tigard, Oregon 97281 Salem, OR 97301 Bend, OR 97708
Geotechnical Consulting Phone (503) 684 -3460 Phone (503) 589 -1252 Phone (541) 330 -9155
Construction Inspection and Related Tests FAX (503) 870 -9147 FAX (503) 589.1309 FAX (541) 330 -9163
PROJECT
FAX MEMORANDUM
TO: Havlin Kemp FROM: Brian C. Ranney, G.I.T.
VLMK Consulting Engineers Geotechnical Staff
Fax: 503.248.9263 Jeanne M. Niemer, P.E.
Principal Geotechnical Engineer
PAGES: 1 DATE: November 7, 2003
RE: Tigard Auto Lube Facility CC: Tim Horst
13565 SW Pacific Highway DDHK Ventures
Tigard, Oregon Fax: 503.297.4635
CGT Job# G0302069
Mr. Kemp,
We are in receipt of your revised facsimile dated November 4, 2003 regarding eliminating foundation drains at the
Tigard Quick Lube to be located at 13565 SW Pacific Highway in Tigard, Oregon. In that facsimile you state that it
is not possible to place foundation drains around the foundations because the deepest storm water outfall invert
elevation is above the basement elevations.
We understand that because of these limitations, you have designed retaining walls at this site to withstand full
hydrostatic pressures. You have also included a waterproof membrane for basement walls. Therefore, for walls
designed as indicated, the foundation drains previously recommended in our Report of Geotechnical Engineering
Services dated March 14, 2003 may be eliminated.
e
Brian C. Ranney, G.I.T. J - = nne M. iem r, P.E.
Geotechnical. Staff Prin•'pal eoter nical Engineer
f w #155A3 4 s :
A
` 1 ' 9/4$`,
'EM.i•I �
E #'IRES:w-
v 2arei 3— e 135
City of Tigard o
VLMK Quick Lube Building Permit ro
13565 SW Pacific Hwy. # BUP2003 00435
0
Occupancy Group(s): B, S3 y
Type of Construction: V -N c
Stories: 1
Height (feet):
3792 SF N
Building Area (Sq. Ft.):
ro
Occupant Load: 28 people 00
Sprinklers: No Sprinklers rn
Alarms: No Alarms
Area Separations: No ASW
Please respond in writing to each comment by creating a response row to each item. This plan review document is created in Microsoft EXCELOO. Each city comment is a whole number.
Your response to each item will be a x .1 number. For. example, City comment is item 1.0, your response is Item 1.1. Each of your responses will be shown in bold face type. Indicate
which detail, specification or calculation shows the requested information. Responses such as "see plans" or "plans. comply" or citing a code section does not resolve a review comment or
expedite plan approval. An explanation of how compliance with the code requirement is achieved and a reflection of that explanation in the construction document with the revisions
5
clouded is our expectation. Your complete and clear response will expedite the re- review and approval of this project or deferred submittal. Thank you for your assistance.
CI
tli
- z
City Construction
Document or
Item ff City Comment From Comment City Comment / Applicant Response Response From Response Status of tri
Date Plan Sheet and Date Item
(Date) rn
1 STRUCTURAL PLAN REVIEW COMMENTS - 8 -8.03
Provide special inspection for the following disciplines: concrete,
masonry, steel welding, epoxy and expansion anchors, and
soils. Special inspection reports shall be submitted to the
building official for review and approval during the course of the
2 CLAIR 8/8/2003 Cover construction. At the completion of each division of work there
shall be a final summary report presented by the special
inspection agency. Provide special Inspection agreement form
signed by all parties. OSSC 1701.5 Condition of
Approval
The special Inspections will be done by Carlson .VLMK 10113/2003
2.1 Geotechinal (soils) and Carlson testing (materials) as noted
on the Cover Sheet.
3 CLAIR 8/8/2003 Cover Provide structural observation prior to cover. Provide report to Condition of
City of Tigard. OSSC 1702 Approval
3.1 As the special inspections are being done, copies will be VLMK 10/1312003
sent to the city. 0
Structural and FLS - 1st Plan Review 0
8-8 -03
CLAIR at (541) 758-1302 for questions. Page 1 of 6 CLAIR Project No.1069 -019
City of Tigard o
VLMK
tv
Quick Lube Building Permit
13565 SW Pacific Hwy. # BUP2003 - 00435 y
N
0
0
w
0
City Construction - -
Document or Response Status of ° op
Item # City Comment From Comment Plan Sheet and City Comment / Applicant Response Response From - Date Item
Date
(Date) _ _
It appears that from detail 15/S2 that the W6x16 beams shown
4 CLAIR 8/8/2003 Foundation /Frami at the south side of the service access openings should be cn
ng Plan, Sheet S1 directly next to the opening as on the north side. Clarify the Condition of w
framing at this location. OSSC 106.3.2 Approval ,:, n
4,1 The W6 x 16 are there to attach equipment only. They are VLMK 10/13/2003 op
not required for slab edge support. m
Provide a note on detail 7/S2 indicating that the deck and slab 1.1
5 CLAIR 8/8/2003 Detail 7/S2 must also be cured before backfill of basement retaining walls. Condition of w
OSSC 1611.6 Approval
•
This note has been added to the detail. I will fax an 8 1/2" x VLMK 10/13/2003
5.1 11" copy of the revised detail (marked 5.1) after sending this
response sheet via email.
Detail 1 /S3 shows the framing detail at the tower center.
LSTA30 straps are provided each direction to connect the 4x12
6 CLAIR 8/8/2003 Detail 1/S3 hip beams. The thrust calculated for the hip beams on calc
sheet R5 is 3869 #. The capacity for a LSTA30 strap is 1255#. tri
Verify that this strapping z
y Aping is adequate to support the hips at the z
center connection. OSSC 2305.2 Open
There is only compression present at the center of the VLMK 10/13/2003
tower framing. The LSTA straps are helping to tie m
6.1 everything together at that point. The thrust is transferred
down to the connection in city comment -7.1.
Detail 4/S3 shows the hip corner detail. (2) HGA10 clips are
provided each side of the 4x12 hip attaching into the 3x cont.
7 CLAIR 8/8/2003 Detail 4 /S3 plate. The thrust calculated for the hip beams on calc sheet R5
is 3869#. The capacity for (2) HGA10 clips is 2330 #. Verify that
this connection is adequate to transfer the hip loads. OSSC
2305.2 Open
The HGA10's are good for 2330# and the MST136 is good for VLMK 10/13/2003
7.1 1565#. Together thay provide 3895# which is adequate for
the thrust load of 3869 #.
Roof Framing Clarify the lateral support at the front of the canopy at building
8 CLAIR 8/8/2003 Plan, Sheet S3 line A. If frames are required provide calculations and details as
needed. OSSC1605.2.1 Open
Refer to calculation sheet L1 and L2. The total lateral load at VLMK 10/13/2003
81 the front of the canopy is 803#. The lateral support is
provided by the (4) TS 12 x 12 x 3/16 columns at grid line 0
"A". w
Structural and FLS - 1st Plan Review o
8 -8-03 N
CLAIR Project No.1069 -019
CLAIR at (541) 758 -1302 for questions. Page 2 of 6
•
r
City of Tigard 0
VLMK Quick Luba Building Permit r.,
13565 SW Pacific Hwy. # BUP2003.00435 \
N
0
0
w
City Construction
Document or Response Status of w
Item # City Comment From Comment Plan Sheet and City Comment I Applicant Response Response From Date Item
li . (Date)
Roof Framing. Provide frame design calculations for tube steel frames indicated -
9 CLAIR 8/8/2003 Plan, Sheet S3; on calculation sheet L3, and located under the tower at building en
o
Calculation sheet lines G and 7. OSSC 1605.2.1 w
w
L3 Open N
Wind loads control the design of the storefront frames. VLMK 10/13/2003 w
9.1 Calculations for the member can be found on calculation m
sheet M5. iv
Roof Framing The canopy roof joists are designed on calculation sheet M3. w
10 CLAIR 8/8/2003 Plan, Sheet S3; Provide calculations that consider the wind uplift effects on the
Calculation sheet joists, or indication to the manufacturer the uplift requirements Condition of
M3 on the joists. OSSC 1622 Approval
10,1 Refer to Joist framing note #6 on sheet S -3 for uplift VLMK 10/13/2003
requirements. C
Soils Report pg Provide soils engineers review of foundation placement during
11 CLAIR 8/8/2003 3&4 oft 1 wet weather installation for building buoyancy due to high water Condition of
table. OSSC 1611.8 Approval m
11.1 _ Carlson Geotechnical will provide special inspection. VLMK , 10/13/2003 0
Submit Engineered Joist (SJI) designs for review and approval
prior to installation. Drawings to be prepared, stamped and
12 CLAIR 8/8/2003 General signed by a Professional Engineer licensed to practice in the m
State of Oregon. OSSC 106.3.3.1 and Chapter 16 Condition of
Approval
Shop drawings from Joist manufacturer will be reviewed by VLMK 10/13/2003
12.1 VLMK and a copy sent to the city with VLMK shop drawing
stamp.
13 FIRE LIFE SAFETY PLAN REVIEW COMMENTS • 8 -8 -03
Provide outside CFM air flow and ventilation occupancy load
14 CLAIR 8/8/2003 General calculations and compare with design. OSSC Sec. 1203.2.1,
1203.2.9, Table 12 -A and OMSC Sec. 401.2. Open
Per my conversation with Eric Sandoval (Clair), we will be VLMK 10/1312003
providing this Information /request to the General
14.1 Contractor for him to forward to his sub - contractor
providing the design. The HVAC sub - contractor will be
suhmittlno plans directly to tha city
15 CLAIR 8/8/2003 General Provide energy calculations for envelope, mechanical, plumbing Condition of
and electrical equipment OSSC 13 _ Approval
I will fax a copy of these forms (supplied by the VLMK 10/13/2003
IS
15.1 mechanical /electrical sub - contractors) after sending this 0
response sheet via email. This will be marked 15.1. 0
A
Structural and FLS - 1st Plan Review o
8 -8 -03 w iv
CLAIR Project No.1069 -019
CLAIR at (541) 758 -1302 for questions. Page 3 of 6
City of Tigard Quick Lube Building Permit c ■
VLMK 13565 SW Pacific Hwy. # BUP2003 -00435 y
N
0
0
w
0
Construction `'
City Document or Response Status of o
Item # City Comment From Comment Plan Sheet and City Comment / Applicant Response Response From co
Date Item „
(Date) 64
16 CLAIR 8/8/2003 General Provide enemy calculations for envelope. See link
http: //www.enerov .state.or.us /code/cdpub.htm OSSC 13 Open cn
I will fax a copy of these forms (supplied by the VLMK 10/13/2003 0 w
16.1 mechanical /electrical sub - contractors) after sending this ro
response sheet via email. This will be marked 15.1. G
Specific fire penetration details required for rated walls. OSSC m
17 CLAIR 8/8/2003 General Sec. 106.3.3.1 (see occupancy separation and property line N
protection wall). Open w
These details will be per each sub - contractor's design VLMK . 10/13/2003
17.1 documents and. will be submitted to the city by them when
complete.
18 CLAIR 8/8/2003 General Provide completed TVFR summary form. See link for
information. OSSC Appendix chapter 9 Open
I will be faxing the completed forms shortly after sending VLMK 10/13/2003
18.1 this checksheet via email. It will be marked 18.1.
ro
Provide a for Mechanical, Plumbing and Electrical - Condition of 0
19 CLAIR 8/8/2003 General ..
system prior to construction. OSSC 106.3.1 Approval
This information has been forwarded to the General VLMK 10/13/2003 td
19.1 Contractor and he will have each of his sub - contractors y
submit for their individual permits. These are deferred items
and will be handled as are completed.
Provide listing for tanks, electrical equipment, dispensers, hose,
20 CLAIR 8/8/2003 General nozzles, and pumps used for storage or dispensing. OUFC Condition of
_7902.1.8 _ Approval
I will fax a copy of the equipment information provided by VLMK 10/13/2003
-20.1 the owner (from Mascott Equipment) after sending this
response sheet via email. It will be marked 20.1.
Provide plumbing plans indicating; site /storm roof drains and
21 CLAIR 8/8/2003 General overflows area calculations, piping sizes and materials, with
rainfall calculations. OSPSC Sec.1103, 1104, 1105, 1106 and Condition of
1110. Approval
21.1 This Information will be provided by the Plumbing sub - VLMK 10/1312003
contractor and submitted directly to the city.
Comply with OPSC Section 1009 for installation of the oil /water
22 CLAIR 8/8/2003 General- separator. 1009.4, Provide a relief vent so that it will not
become air bound. 1009.6, Provide a maintenance schedule. Condition of
IS
.Approval o
0
ca
Structural and FLS - 1st Plan Review o
8.8-03 N
CLAIR Project No.1069 -019
CLAIR at (541) 758 -1302 for questions. Page 4 of 6
City of Tigard °
VLMK Quick Lube Building Permit
IV
13565 SW Pacific Hwy. # BUP2003-00435
N
0
0
C4
0
Construction ..
City Response Status of O
Document or co
Item # City Comment From Comment City Comment / Applicant Response Response From
Date Plan Sheet and Date Item ,
,m,.......—, (Date) ■
■
These details will be per the Plumbing sub - contractor's VLMK 10/13/2003
22.1 design documents and will be submitted to the city by them m
when complete. - w
Provide approval from the City of Tigard for all other reviews. ro
23 CLAIR 8/8/2003 General This includes but are not limited to Mechanical, Plumbing and Condition of
co
Electrical reviews. OSSC 106.3.1 Approval to
These other permits will be submitted by the individual sub- VLMK 10/13/2003 N
23.1 contractor w
providing the design and work (deferred
subfnittal).
24 CLAIR 8/8/2003 Sheet A -6 If there are mechanical equipment proposed for the roof, provide
access. OMSC Open
We are proposing to Install roof top mechanical units and VLMK 10/13/2003
we will revise the plans to indicate a roof access hatch up e
24.1 through the restroom, I will fax an 8 1/2" x 11" copy of the
roof hatch detail for your review after sending this response
,via email It Is marked 24.1_ ra
The site plan does not identify the location of available fire water 0
for a minimum of 1750 gpm for 2 hours with available hydrants. ""
25 CLAIR 8/8/2003 Sheet G -3 - Provide hydrant test information and calculation for each fire
til
area. Provide comparison of available fire flow against required m
fire flow for each fire area. OUFC Appendix III - A.
Open
There is an existing fire hydrant located in front of the VLMK 10/13/2003
building and is shown on sheet G -3. This project has an
existing building that is approximately 5,400 sgft. that Is
25.1 going to be removed and replaced with the new Quicklube
facility that is approximately 4,000 sqft. I have talked with
the Fire Marshal and he informed me that there is plenty of
• water at this location, but he did not have the fire flow
raleni afinne. ayuitakln
26 CLAIR 8/8/2003 Detail 5 /A6 Provide 30" parapet at 1 -hour property line protection at hip roof.
Open
The roof plan (sheet A-6) indicates a reference to the roof VLMK 10/13/2003
Y6 framing plan (sheet S -3). Sheets S -3 has all of the top of
framing and top of wail elevations. It Indicates that the t.o.w.
js 16'-0" and the highest t.o.f. Is 13'-6 ".
27 CLAIR 8/8/2003 Detail A -A/G -2 Provide minimum width for accessible path from van parking to
IS
main entry. OSSC 1103.2.4 , Open
0
co
Structural and FLS - 1s1 Plan Review o
8 -8 -03 ro
CLAIR Project No.1069 -019
CLAIR at (541) 758 -1302 for questions. Page 5 of 6
City of Tigard 0
VLMK Quick Cube Building Permit
13565 SW Pacific Hwy. # BUP2003 - 00435 y
0
0
w
0
Construction - ^4
City Document or Response Status of
Item # City Comment From Comment City Comment / Applicant Response Response From
Date Plan Sheet and Date Item
D.e
The site plan (sheet G -1) indicates the accessible route to VLMK 10/13/2003
run from the handicap space to the double storefront door.
The path is 38" wide (minimum) and is all on level asphalt
27.1 - running alongside the concrete curb/retaining wall. I will ro
add the minimum dimension to this plan and provide a 8 OD
1/2" x 11" copy via fax marked as 27.1 shortly after sending co
thin amail ro
W
tr]
z
c5
A
m •
•
rn
0
0
Structural and FLS - 1st Plan Review 0
• 8 -8 -03
CLAIR Project No.1069 -019 -
CLAIR at (541) 758 -1302 for questions. Page 6 of 6
•
•
lwc
October 29, 2003 • • •
City of Tigard
13125 SW Hall Blvd.
Tigard, OR 97223
Attention: Brian Blalock, Senior Plans Examiner
Subject: City of Tigard — Quick Lube - Structural and FLS — 1 Back Check Review
CLAIR Project No.: 1069 -019 •
Permit No.: BUP2003 -00435 • . • '
CLAIR has completed the back check review based on the A &E responses received on the above- -
mentioned project on behalf of the City of Tigard (COT). CLAW recommends approval of the project
for permit to construct..
CLAW requests that the permit applicant/designer respond to the Conditions of Approval comments in
the checklist, prior to construction of those elements. Please contact CLAIR's office for to
resolve these items.
Should you require explanation and/or clarification of any of the items noted in the attached plan review
• document, please do not hesitate to contact me at (541) 758 -1302, or by email at
esandoval(ci.claircompany.com.
Respec lly Submitt :4,
•
nc S ndova , • . -
Cc: Jennifer Kimura, VLMK •
CLAIR project file 1069 -019 • .
Attachments: Attachment #1 - Codes and Standards
Attachment #2 - Submittal log. •
Attachment #3. — Plan Review Document
•
•
•
•
•
•
• BUILDING•CODE CONSULTANTS • ARCHITECTS • ENGINEERS • INSPECTION +TESTING SERVICES
525 NW Second Street; Corvallis, OR 97330 tf 800.383.8855 ph 541. 758.1302 fx 541.753.2264 www.claircompany.com
•
•
•
•
R is c L a i r City of Tigard — Quick Lube — Structural & FLS — 1 Back Check Review
October 29, 2003
1069 -019
Page 2
ATTACHMENT #1— CODES AND STANDARDS
State of Oregon 1998 ed Structural Specialty Code with 2000 supplements (OSSC)
1997 UBC Standard 9 -1 "Installation of Fire Sprinkler Systems"
NFPA 72 1999 Edition "Installation of Fire Alarm Systems" .
State of Oregon 1998 Edition Oregon Uniform Fire Code with 2002 supplements (OUFC)
1999 edition, TVFR Ordinance 99 -01, based on the 1997 Uniform Fire Code
ATTACHMENT #2 — SUBMITTAL LOG
Our plan review comments are based on the following submitted construction documents:
Y.:.'; - .M.7 if;q.itt,_'ZVM,V:
1 a tc , , ,, c- IR {Release - i#< f. s , i ; "' i
�, y wDated� s " Fi om '.. b t -44 a` k <w . - vD r i tion
- ece ed- ' > 1 , - A r , \?umber of z da "te ��fx , f 4 P ,
tY r r t t y r
aD.:, sc�.. � o C 9B P."cF k t+� azu+ _'�s" tt , � - ...r..... - . taa�Cr36 .w
Building Permit Application - Quick Lube
7/30/03 . 7/18/03 City of Tigard 1000 10/30/03 located at 13565 SW Pacific Hwy. Demo of
existing building and construction of a 3-bay oil
chan•e facili . Valuation of $425,000.
7/30/03 3/14/03 City of Tigard 1001 10/30/03 Geotechnical Engineering Services Report
Structural Calculations for Quick Lube - DDHK
7/30/03 5/1/03 City. of Tigard 1002 10/30/03 Ventures, LLC from VLMK Job Number
203007
IFC Drawings Including Site Plan / Legend,
Site Grading Plan, Site Utility Plan, Site
Erosion Control Plan, Site Details,
Topographic Site Survey, Site Landscaping
7/30/03 1/1/03 City of Tigard 1003 10/30/03 Plan, Floor Plan, Exterior Elevations, Bldg.
Sections, Reflected Ceiling Plan, Roof Plan,
Stair Plan, Architectural Details, Specifications,
Foundation Plans, Roof Framing Plans &
Details
10/13/03 10/13/03 VLMK 1004 II 10/30/03 A &E Responses from 1st Plan Review dated
8 -8-03.
10/17/2003 1/3/2003 City of Tigard 1006 II 10/30/03 Full size drawings including cover, G1, Al &
• rIcLa i r RECEIVED
Transmittal #: __4212
NOV 3 2003
CITY OF TIGARD
BUILDING DIVISION
Letter of Transmittal
Attn: Brian Blalock Date: 10/30/2003
Company: City of Tigard Job Number: 1069 -019__
Address: 13125 SW Hall Blvd Originating Office: Clair CVO
Tigard,_ _ OR Re: City of Tigard - Quick Lube _
97223
We are sending you ❑ Attached Transmitted
Under Separate Cover By: Alan Langendorf the following items:
Copies CCI # • Description
L 1 1000 Building Permit Application - Quick Lube located at 13565 SW Pacfic Hwy.
Demo of existing building and construction of a 3 -bay oil change facility.
Valuation of $425,000.
1 2 1 1001] Geotechnical Engineering Services Report
2 1 1002 I Structural Calculations for Quick Lube - DDHK Ventures, LLC from VLMK Job
Number 203007
1 1 1003 I IFC Drawings including Site Plan / Legend, Site Grading Plan, Site Utility Plan,
Site Erosion Control Plan, Site Details, Topographic Site Survey, Site
Landscaping Plan, Floor Plan, Exterior Elevations, Bldg. Sections, Reflected
Ceiling Plan, Roof Plan, Stair Plan, Architectural Details, Specifications,
Foundation Plans, Roof Framing Plans & Details
1 1 1006 I Full size drawings including cover, G1, Al & A6
❑ For Approval ❑ For Your Review Submit _ 0 Copies for Distribution
5 For Your Use ❑ Approved As Submitted Return _ 0 Corrected Prints
C7 As Requested n Approved As Noted Other:
0 Returned For Corrections For Bids Due: _
Remarks:
The above noted submittals are approved for issuance with Conditions of Approval.
Please review plan review document.
If enclosures are n ot as noted, lease notif us at one
• BUILDING CODE CON SULTAN TS • ARC1?ITECTS •E • INSPECTION +TESTING SER ICES
525 NW Second Street, Corvallis, OR 97330 if 800 383 8855 ph 541.758.1302 fx 541.753.2264 www.claircompany.com
Barbara Butler - ,SDR2003- 00005Quick Lube �, � � Page 1
•
•
•
• ' From: • Debbie Adamski
• To: Barbara Butler; Dianna Howse; Jeanne Temple
Date: 7/15/03 4:49PM V
•
Subject: SDR2003- 00005, Quick Lube V
Jennifer with VLMK will be in on Wednesday to submit site work, site utilities and the building permits for •
the above project. The land use case was approved on 7/8/03 per Matt S.
I quoted the following submittal fees to Jennifer:
Site work ($25,000) BUPLN $184.15
Building ($425,000) BUPLN $1,301.98
FLS $801.22 C C
pebble Adamski
But• . - - - - -
• City of Tigard
(503)639 -4171
Debbie @ci.tigard.or.us
CC: brian blalock; Gary Lampella; Matt Scheidegger
•
RECEIVED .
- JUL i 8 2003
CITY OF TIGARD
BUILDING DIVISION
•
•
V L M P !E!orn K CONSULTING
3933 SW Kelly Avenue • Portland • Oregon 97239 -4393 W www.vlmk.com
(� i/ LETTER OF TRANSMITTAL �
TO L DATE: (o / / 1 (� 6 3
5�► S w M9 criteerr PROJECT: Q V L C (G V VII
6F4frl;LI, S (/ 6 (t . c1 7330
ATTN: 5F-1C- Strfq tvM JOB NO: ZAP 3 oc 7
WE ARE SENDING YOU Fir Attached ❑ Under separate cover via VII $ L- the following items:
❑ Shop Drawings ❑ Prints ❑ Plans ❑ Samples ❑ Specifications
❑ Copy of Letter ❑ Change Order ❑
COPIES DATE NO.
5e-T of reer E) $ f.
C ov - , C, -I, A -1 f4 - 0•
THESE ARE TRANSMITTED as checked below:
For Approval ❑ Approved as submitted ❑ Resubmit copies for approval
❑ For your use ❑ Approved as noted ❑ Submit copies for distribution
_ ❑ As requested ❑ Returned for corrections ❑ Return corrected prints
❑ For review and comment ❑
❑ FOR BIDS DUE 20 ❑ PRINTS RETURNED AFTER LOAN TO US
REMARKS
COPY TO
y �Q
SIGNED ( t �� 1 E7-
If enclosures are not as noted, kindly notify us at once
r
1
V CONSULTING F 503.248.9263
E N G I N E E R S P 503.222.4453
E vlmk @vlmk.com
3933 SW Kelly Avenue • Portland • Oregon 97239 -4393 W www.vlmk.com
LETTER OF TRANSMITTAL
/ _ 1 �' 6 ' DATE: l 1 f I '
I TO l" _ G 5
f 1 V✓ V 4 1 - 1 - v i L t ,3 I V of • PROJECT: C.1rA 1 `' K- 1 ✓l ✓ ✓
-T( ( 1ce. .9 7vi. --S1 j '
ATTN: a/la/1/7 F3 L- 1 I O Gk- F l wq - 171 B NO: ! 2 7
WE ARE SENDING YOU ❑ Attached ❑ Under separate cover via €::;71 ----- t I I. /l/ the following items:
LI Shop Drawings ❑ Prints LI Plans ❑ Samp1eS ❑ Specifications
❑ Copy of Letter El Change Order El
r p, 9 DATE NO. (WC C1Q--. � P‘tsce4S )
G tvs
0 00
THESE ARE TRANSMITTED as checked below:
❑ For Approval ❑ Approved as submitted ❑ Resubmit copies for approval
❑ For your use ❑ Approved as noted ❑ Submit copies for distribution
_ ❑ As requested ❑ Returned for corrections ❑ Return corrected prints
❑ For review and comment ❑
❑ FOR BIDS DUE 20 ❑ PRINTS RETURNED AFTER LOAN TO US
REMARKS
COPY TO
/
SIGNED w 1/14(A4A v
If enclosures are not as noted, kindly notify us at once
OFFICE COPT
November 5, 2003 CITY OF TIGARD
Jennifer Kimura OREGON
3933 SW Kelly
Portland, OR 97239
RE: NEW AUTO QUICKLUBE
Project Information
Building Permit: BUP2003 -00435 Construction Type: VN
Tenant Name: Quicklube Occupancy Type: B/S3
Address: / 35Ls 1-3365'SW Pacific Highway Occupant Load: 17
Area: 3799 Sq Ft Stories: 1
The plan review was performed under the State of Oregon Structural Specialty Code (OSSC)
1998 edition; and the Tualatin Valley Fire & Rescue Ordinance 99 -01 (TVFR99 -6) 1999
edition. The submitted plans are approved subject to the following conditions.
1. See attached Clair spreadsheet for conditions of approval
2. Special Inspection: Special inspection is required for items listed on "Cover"sheet.
The special inspection agency of record shall furnish inspection reports to the
Engineer of Record, VLMK Consulting Engineers, the General Contractor and the
City of Tigard, Building Division, attention Hap Watkins. All discrepancies shall be
brought to the immediate attention of the general contractor for correction. The
special inspector shall submit a final signed report stating whether the work requiring
special inspection was, to the best of the inspector's knowledge, in conformance with
the approved plans and specifications and the applicable workmanship provisions of
the code. 1701.3 OSSC
3. Deferred submittals such as Fire Alarm, Fire Sprinkler, Truss Joist Shop Drawings,
etc, will be charged a deferred submittal fee based on the valuation of the portion of
the work being deferred. The minimum fee shall be $200.00. When submitting
deferred submittal, indicate valuation
American with Disabilities Act (ADA): It shall be the responsibility of the Architect,
Engineer, Designer, Contractor, Owner and Lessee to research the applicability of the ADA
requirements for the structure. The City of Tigard reviews the plans and inspects the structure
only for compliance with Chapter 11 of the OSSC which may not include all of the
requirements of the ADA.
13125 SW Hall Blvd., Tigard, OR 97223 (503) 639 -4171 TDD (503) 684 -2772
Approved Plans: 1 set of approved plans, bearing the City of Tigard approval stamp, shall
be maintained on the jobsite. The plans shall be available to the Building Division inspectors
throughout all phases of construction. 106.4.2 ,OSSC
Certificate of Occupancy: No building or structure shall be used or occupied until the
Building Official has issued a certificate of occupancy 109.1 OSSC
Premises Identification: Approved numbers or addresses shall be provided for all new
buildings in such a position as to be plainly visible and legible from the street or road
fronting the property.
When submitting revised drawings or additional information, please attach a copy of the
enclosed City of Tigard, Letter of TransmittaL The letter of transmittal assists the City of
Tigard in tracking and proces the doc 1- s s.
Respect ,
Blab.
Senior P E :.s ' , er
P
a
`t
' t.
f- F IL E COPY
July 30, 2003 6 ' � i\
I Gi �ll'
CITY OF TIGARD
Clair Company, Inc. OREGON
525 NW 2 Street
Corvalis, OR 97330
RE: PLAN REVIEW SERVICES FOR JIFFY LUBE @ CITY OF TIGARD
•
Project Information
Permit Number: BUP2003 -00435
Project Name: Jiffy Lube
Address: -565 SW Pacific Highway
/ 35 1- 5
The City of Tigard requests plan review for the above project. The scope of work will be to
perform plan review for the structure to 5 feet outside of the structure for structural, fire- and
life-safety,Mit design for compliance with the current editions
of the following State of Oregon Specialty Codes:
• State of Oregon, 1998 edition, Structural Specialty Code
• State of Oregon, 1999 editio
• State of Oregon, 2000 editieli
• State of Oregon, 2000 ed
• Tualatin Valley Fire & Rescue, 1999 edition, Ordinance 99 -01, based on Uniform Fire
Code
Enclosed please find the following:
Geotechnical Report 2 copies
Structural Calculations 2 copies
Full Size Plans 1 copy
Please submit a plan review letter to the Building Division recommending approval or listing
corrections to be provided.
Please address your plan review comments to Jennifer Kimura @ VLMK as referenced on the
enclosed Building permit applic- • . If you have any questions, please call at 503- 718 -2436.
Sincerely,
rian Blalo
Senior Pl. Examiner
13125 SW Hall Blvd., Tigard, OR 97223 (503) 639 -4171 TDD (503) 684 -2772
P !E!!m
vLAcK C O N S U L T I N G E N G I N E E R S F
E
3933 SW Kelly Avenue • Portland • Oregon 97239 -4393 W www.vlmk.com
A X.E
FI LE COPY
Hap Ha Watkins
City of Tigard
Office of Development and Plan Review
13125 SW Hall Blvd.,
Tigard, Oregon 97223 -8199
Re: Quick Lube
/ 3S�fS —1-a565 Pacific Hwy - Tigard, OR
Structural Engineer of Record Summary Letter
Permit No. BUP2003 -00435
Dear Mr. Watkins:
In accordance with Section 1702 of the 1998 Oregon Structural Specialty Code, this
letter will serve, as the Final Summary Letter of Structural Observations required of the
Structural Engineer of Record for the referenced project.
VLMK Consulting Engineers has completed observations of the Quick Lube building
throughout its construction. These observations generally follow the outlined special
inspection program indicated on the cover sheet of the permitted documents. VLMK
Consulting Engineers has also reviewed the special inspection testing reports as
completed by Carlson Testing, Inc and Carlson Geotechnical.
Based upon our site observations and review of the special inspection testing reports,
the construction of the Quick Lube building appears to have been completed in
substantial compliance with the permit- approved plans, specifications and Engineer of
Record directives.
Sincerely,
VLMK Consulting Engineers
Dan Morell, P.E.
Attachment: Final Letter from Carlson Testing
cc: Tim Horst, DDHK Ventures
Mike Magee, GHC
I Structural Engineering • Civil Engineering • Industrial Engineering • Planning • Studies / Evaluations • Entitlement
F: \Powin Center 5- 28- 04.doc
Main Office Salem Office Bend Office
• P.O. Box 23814 4060 Hudson Ave., NE P.O. Box 7918
Tigard, Oregon 97281 Salem, OR 97301 Bend, OR 97708
Carlson Testing Inc. Phone (503) 684 -3460 Phone (503) 589 -1252 Phone (541) 330 -9155
FAX (503) 684 -0954 FAX (503) 589 -1309 FAX (541) 330 -9163
Special Inspection
FINAL SUMMARY LETTER
May 28, 2004
T0404867
City of Tigard FILE COPY
13125 SW Hall Blvd.,
Tigard, OR 97223 -8199
Attn: Building Department -
Re: Quick Lube
13565 SW Pacific Hwy- Tigard, OR
Permit No.: BUP2003 -00435
Dear Sir or Madam:
This is to certify that in accordance with Section 1701 of the Uniform Building Code, Title 24, we have
performed special inspection of the following item(s) per our inspection reports only:
Reinforced Concrete •
Structural Masonry
Structural Steel- Fabrication & Erection, includes verification of weld procedures & certifications
Adhesive Anchors
Expansion Anchors
All inspections and tests were performed and reported according to the requirements of Project Documents
and, to the best of our knowledge, the work was in conformance with the approved plans and
specifications, approved change orders and applicable workmanship provisions of the State Building Code
and Standards, as well as the structural engineer's design changes, approvals and verbal instructions.
Our reports pertain to the material tested /inspected only. Information contained herein is not to be
reproduced, except in full, without prior authorization from this office.
If there are any further questions regarding this matter, please do not hesitate to contact this office.
Respectfully submitted,
CARLSON TESTING, INC.
Andy M. Ewing
President
:DECEIVED
AME /ks
JUN 0 ?UOu
cc: DDHK Ventures- Tim Horst
VLMK- Havlin Kemp li,oan WOuwnii anGinct
GHC Builders Inc- Matt Magee
1J.11 t.A JUJ U/U LJ VV1
C arlson Geotechnical O. Office Salem Office Bend Office
P.O. B ox 23814 4060 Hudson Ave., NE P.O. Box 7918
A Division of Carlson Testing, Inc. Tigard, Oregon 97281 Salem, OR 97301 Bend, OR 97708
Geotechnical Consulting Phone (503) 684-3460 Phone (503) 589 -1252 Phone (541) 330 -9155
Construction Inspection and Related Tests FAX (503) 670 -9147 FAX (503) 589 -1309 FAX (541) 330 -9163
June 2, 2004
Mr. Tim Horst
DDHK Ventures
9790 SW Nimbus Avenue
Beaverton, Oregon 97008
Geotechnical Letter of Compliance COPY
Tigard Quick Lube F 13565 SW Pacific Highway
Tigard, Oregon
Building Permit Number: BUP2003-00435
Site Permit Number. SIT2003 -00022
CGT Project: G0302069_a
Carlson Geotechnical (CGT) has performed geotechnical observations for the following items at
the above - referenced site. Our observations were completed on an on -call, part-time basis
during the months of January, February, and March of 2004. Copies of our field reports have
been forwarded to you, and are also available in our office.
• Grease Pit Floor Slab Bearing Surfaces: Based on our field observations, the
subgrade soils for the grease pit were prepared in general accordance with our
recommendations.
• Retaining Wall Subgrade: Based on our field observations, the subgrade soils for the
retaining wall located on the northern property line were prepared in general accordance
with our recommendations.
• Parking Area Subgrade: Based on our field observations, the subgrade soils for the
parking are located to the north of the building were prepared in general accordance with
our recommendations.
• Waiting Room Floor Slab Base Aggregate: Based on our density testing, the floor slab
base aggregate for the waiting room was compacted in general accordance with our
recommendations.
•
VV/ U 1 VY y y 1V 1. 1'r1� JVJ V1 V 05 t£ ./ - y \y ✓VL. 1LiJ110V W/. UV..
C
'l
Tigard Quick Lube
Tigard, Oregon
G0302069.A
June 2, 2004
Based on our observations, as documented in our field reports, and to the best or our
knowledge, within our scope of work, the above geotechnical observations were completed in
general accordance with the recommendations contained in our Report of Geotechnical
Services dated March 14, 2003. We were not requested to perform observations other than
those noted.
Sincerely,
CARLSON GEOTECHNICAL
tii i--
—..
�
c--. �, G ;9,j` G ,. y /`
t., .17. f /
1
sue 12.31.0
Brian C. Ranney, G.I.T. Jeanne M. Niemer, P.E.
Geotechnical Project Manager Principal Geotechnical Engineer
•
Carlson Geotechnical G0001520:041900