Report (4) 02/18/2004 17:24 FAX 503 248 9263 VLMK ENGINEERS IJ001 /001 CONSULTING IT 503.222.4453 T 4 ' , , l A.- E N �..P I N E E R J w Y/a Q7 � • ....., . , « tE vimk( vimk.corn 3933 SW Kelly Avenue • Portland • Oregon 97239 -4393 rh1 ; w www.vlmk.com FIELD REPORT Date: February 18, 2004 Job No: 203007 Project: Quick Lube Permit No: SIT 2003 -00022 Address: 13565 SW Pacific Hwy. contractor: Grady Harper Carlson Location: Tigard, OR Owner: DDHK Ventures Weather: Cloudy Temp/Time: 50° at 10:00 a.m. Present at Site: Mike Green, Grady Harper Carlson; Dan Morell, VLMK Consulting Engineers THE FOLLOWING WAS NOTED: I was on site to observe reinforcing bar for the service pit walls grids 1 -6 and D -F. All reinforcing appeared to be per approved plans and specifications. GENERAL NOTES: 1. Water stop at bottom rebar at east wall (south side) and south wall (east side) did not appear to be properly attached. 2. Contractor notified me that dowels into CMU walls (detail 7/S -2) will be wet set. 3. Embeds per 8/S -2 and 1/S -2 should be in place prior to pour. 4. Remove water and debris from form work prior to pour. 5. #5 dowels 2 —l 2-6• per detail 7/S -2 were placed at 18" on center instead of 16" on center. I told the contractor that it was acceptable. Submitted By: Dan Morell, P.E. VLMK Consulting Engineers cc: Michael Denton, DDHK Ventures Tim Horst, DDHK Ventures City of Tigard Mike Magee, Grady Harper Carlson DM:jjs Structural Engineering • Civil Engineering • Industrial Engineering • Planning • Studies / Evaluations • Entitlement