FIELD REPORT
Date: February 18, 2004 Job No: 203007
Project: Quick Lube Permit No: SIT 2003 -00022
Address: 13565 SW Pacific Hwy. contractor: Grady Harper Carlson
Location: Tigard, OR Owner: DDHK Ventures
Weather: Cloudy Temp/Time: 50° at 10:00 a.m.
Present at Site: Mike Green, Grady Harper Carlson; Dan Morell, VLMK Consulting
Engineers
THE FOLLOWING WAS NOTED:
I was on site to observe reinforcing bar for the service pit walls grids 1 -6 and D -F. All
reinforcing appeared to be per approved plans and specifications.
GENERAL NOTES:
1. Water stop at bottom rebar at east wall (south side) and south wall (east side) did
not appear to be properly attached.
2. Contractor notified me that dowels into CMU walls (detail 7/S -2) will be wet set.
3. Embeds per 8/S -2 and 1/S -2 should be in place prior to pour.
4. Remove water and debris from form work prior to pour.
5. #5 dowels 2 —l 2-6• per detail 7/S -2 were placed at 18" on center instead of 16" on
center. I told the contractor that it was acceptable.
Submitted By:
Dan Morell, P.E.
VLMK Consulting Engineers
cc: Michael Denton, DDHK Ventures
Tim Horst, DDHK Ventures
City of Tigard
Mike Magee, Grady Harper Carlson
DM:jjs