Loading...
Report 06/02/04 WED 13:15 FAX 503 670 9147 CARLSON TESTING tj 001 C ar lson •Geotechnical P.O Box 23814 60 Hudson Ave., NE P.O. Box A Division of Carlson Testing, Inc. Tigard, Oregon 97281 Salem, OR 97301 Bend, OR 97708 Geotechnical Consulting Phone (503) 684 -3460 Phone (503) 589 -1252 Phone (541) 330 -9155 Construction Inspection and Related Tests FAX (503) 670-9147 FAX (503) 589 -1309 FAX (541) 330 -9163 June 2, 2004 Mr. Tim Horst DDHK Ventures 9790 SW Nimbus Avenue Beaverton, Oregon 97008 Geotechnical Letter of Compliance Tigard Quick Lube 13565 SW Pacific Highway Tigard, Oregon Building Permit Number: BUP2003 -00435 Site Permit Number: SIT2003 -00022 CGT Project: G0302069.a Carlson Geotechnical (CGT) has performed geotechnical observations for the following items at the above - referenced site. Our observations were completed on an on -call, part -time basis during the months of January, February, and March of 2004. Copies of our field reports have been forwarded to you, and are also available in our office. • Grease Pit Floor Slab Bearing Surfaces: Based on our field observations, the subgrade soils for the grease pit were prepared in general accordance with our • recommendations. • Retaining Wall Subgrade: Based on our field observations, the subgrade soils for the retaining wall located on the northern property line were prepared in general accordance with our recommendations. • Parking Area Subgrade: Based on our field observations, the subgrade soils for the parking are located to the north of the building were prepared in general accordance with our recommendations. • Waiting Room Floor Slab Base Aggregate: Based on our density testing, the floor slab base aggregate for the wa room was compacted in general accordance with our recommendations. 08/02/04 WED 13:16 FAX 503 870 9147 CARLSON TESTING a 002 Tigard Quick Lube Tigard, Oregon G0302069.A June 2, 2004 • Based on our observations, as documented in our field reports, and to the best or our knowledge, within our scope of work, the above geotechnical observations were completed in general accordance with the recommendations contained in our Report of Geotechnical Services dated March 14, 2003. We were not requested to perform observations other than those noted. Sincerely, CARLSON GEOTECHNICAL r ,. 4 #15648 f l ) P„.■ •. EGNN N ce • �-- -7 °I:g$:12.SI -ot as l Brian C. Ranney, G.I.T_ Jeanne M. Niemer, P.E. Geotechnical Project Manager Principal Geotechnical Engineer • Carlson Geotechnical G0001520:041900