Loading...
Correspondence (22) u du, 97- 3 7 FLEMING W. SMITH, JR., FAIA ARCHITECT 1400 Nashville City Center 511 Union Street Nashville, Tennessee 37219 -1733 615/770 -8191 November 24, 1998 Mr. Bob Hoskins City of Tigard 13125 SW Hall Blvd. Tigard, Oregon 97223 Dear Sir: Subject: Mullikin Medical Center Tenant Improvements 13200 SW Pacific Highway Tigard, Oregon 97223 Enclosed is a print of sheet A1.1 with sixth revision dated 11/11/98, and a print of sheet A2.1 with fifth revision dated 11/13/98 for your review, comment, or approval. Sheet A1.1 shows the revised elevated/entrance lobby as revised on 8/19/98, as marked A. Sheet A2.1 revision marked AS shows corridor 245 reducing width from 6' to 4' and shifting 1 -8" south, due to the discovery of existing columns. 4' is greater than the 44" minimum width of U.B.C. section 1005.2 toilet 218a and janitor 219 have been relocated to the opposite side of corridor 223 and exam room 225 put in its place. We believe the design of the restroom complies with A.D.A. requirements. All of the revision 5 changes are the result of discovered columns and chases that have been uncovered during the construction process. If there are any questions or concerns, please let me know. Sincerely, tl Fleming W. Smith, Jr., FAIA Architect FLEMING W. SMITH, JR., FAIA • ARCHITECT 1400 Nashville City Center 511 Union Street Nashville, Tennessee 37219 -1733 November 19, 1998 Bob Hoskins City of Tigard 13125 SW Hall Blvd. Tigard, Oregon 97223 Dear Sir. SUBJECT: Mullikin Medical Center Tenant Improvements 13200 SW Pacific Highway Tigard, Oregon 97223 Enclosed is a print of sheet A1.1 with sixth revision dated 11/11/98 and a print of sheet A2.1 with fifth revision dated 11/13/98 for your review, comment of approval. Sheet A1.1 shows the revised elevated /entrance lobby as revised on 8/19/98, as marked e6. Sheet A2.1 revision marked 45 shows corridor 245 reducing width from 6' to 4' and shifting 1 -8" south, due to the discovery of existing columns. 4' is greater than the 44" minimum width of U.B.C. section 1005.2 toilet 218a and janitor 219 have been relocated to the opposite side of corridor 223 and exam room 225 put in its place. We believe the design of the restroom complies with A.D.A. requirements. All of the revision 5 changes are the result of discovered columns and chases that have been uncovered during the construction process. If there are any questions or concerns, please let me know. Sinc- ely, 4 Fleming . Smit , Jr. FAIA Architect