Loading...
Correspondence • 4 iii 4I August 4, 2005 CITY OF TIGARD OREGON Miller Consulting Engineers Thomas E. Fowler 9570 SW Barbur Blvd #100 Portland, OR 97211 RE: RACK STORAGE @ SHERWIN- WILLIAMS Project Information • • Building Permit: BUP2005 -00347 Construction Type: 5N Tenant Name: Sherwin - Williams Occupancy Type: M Address: 13500 SW Pacific Hwy Occupant Load: NA The elan review was performed under the State of Oregon Structural Specialty Code (OSSC) 2004 edition; and 2003 Oregon Fire Code (OFC) as amended by TVF &R. The submitted plans are approved subject to the following conditions. 1. Special Inspection: Special inspection is required for anchorage of storage racks 8 feet or greater in height (per 1707.1 OSSC). The special inspection agency of record shall furnish inspection reports to Miller Consulting, the Engineer of Record, Joe Hughes Construction, the General Contractor, and the City of Tigard, Building Division, attention Hap Watkins. All discrepancies shall be brought to the immediate attention of the general contractor for correction. The special inspector shall submit a final signed report stating whether the work requiring special inspection was, to the best of the inspector's knowledge, in conformance with the approved plans and specifications and the applicable workmanship provisions of the code. 1704 OSSC 1. Provide one 2 -A rated fire extinguisher in the new area. The extinguisher shall be located so that no usable space has a distance greater than 75 feet to the extinguisher. OFC 906.3 2. The racks shall display in one or more conspicuous locations a permanent plaque not less than 50 square inches in area, showing the maximum permissible unit load in clear legible print. OSSC 1603 13125 SW Hall Blvd., Tigard, OR 97223 (503) 639 -4171 TDD (503) 684 -2772 Approved Plans: 1 set of approved plans, bearing the City of Tigard approval stamp, shall be f maintained on the jobsite. The plans shall be available to the Building Division inspectors throughout all phases of construction. 106.4.2 OSSC When submitting revised drawings or additional information, please attach a copy of the enclosed City of Tigard, Letter of Transmittal. The letter of transmittal assists the City of Tigard in tracking and processing the documents. • Respectfully, Val Henzel, Senior Plans Examiner •