Plans ,
VECHANICAL EQUIPMENT SCHEDULE
REVISIONS
EQUIPMENT DESCRIPTION NEW UNIT OLD UNIT
TAG
RTU- 1 ROOFTOP UNIT LENNOX RUDD
2000 CFM 0.5 ESP, 3/4 BHP MOTOR, BELT DRIVE GCS 16- 060 -120 1 1 E /12E60CK
58.5 MBH TOTAL COOLING @ 80/67F (db /wb) RET, & 95'F, 10.0 SEER
120.0 MBH HEATING INPUT, 80.0% A. F. U. E 208/230V 3PH 208/230V 3PH u �
29.0 MCA 36.0 MCA =
PROVIDE WITH SMOKE DETECTOR AND ECONOMIZER. ..= A,
526 lbs. 594 lbs. Si
o g3
VD
WORK SUMMARY: a
F --4
REPLACE EXISTING OLD ROOFTOP UNIT WITH NEW "LIKE" UNIT. RECONNECT TO EXISTING GAS
LINE, ELECTRICAL, AND DUCTWORK. NEW PROPOSED UNIT IS 68 lbs. LIGHTER THAN OLD UNIT.
Z
U
• ��O
(GAFFERS) C a
rn Q
CA
� W
0
0 Q � 0-1
H
HVAC LAYOUT
87th AVE.
,c DATE 08/19/05
3 —6O \ p� SRM
DRAWN BY
cJ
SCALE
WORK SITE PLAN , A, 2 NONE
SCALE: NONE //y % 5 5 /4C /�V /
M -1
PROJECT 9 84999
ch
REVISIONS
I i
ee
RTLr -1 s'"111
o E3
i
4
cn
a
V .
REPLACE OLD UNIT WITH NEW "LIKE" UNIT
Z ---- RECONNECT TO EXISTING DUCTWORK Z
AND GAS LINE
ii ri �Mi
2x 10 TRUSSES ON 16" CENTER r .1.4 RTU -1 C/)
Sao
ROOF FRAMING LAYOUT w � T �
SCALE: 1/4 a 1 0' h� l/')
EXISTING A/C UNIT V ,-.4 H
TO REMAIN ,-�
NVAC LAYOUT
DATE 08/19/03
DRAWN BY
SRM
SCALE
1/8 =1' -0
HVAC ROOF LAYOUT M -2
SCALE: 1/13%=1
PROJECT ® 64999
I