Loading...
Report 1• • .liar„ Office Salem of /,e Bend Office • rl s o n Testing Inc • Phone• OR V2 4060 Hudson R 953 . M[ 6303, OR 97702 Rd Rl1 T end, OR V223 Salem OR 97301 Bend. OR 9770' Phone (.503) 69e.3a60 Phone 0031529-1252 Pham: 611) 330.9155 F,u.. (5031 684 0954 Fns: (503, 589.1309 8,5134 /, 330.9163 Construction Materials Testing & Inspection Special Inspection FINAL SUMMARY LETTER i c,lair7 -0° g5 July 26, 2007 T0704406 • CEIV City of Tigard 13125 SW Hall Blvd AUG 2007 Tigard, OR 97223 -8199 CITY OF TIGARD Attn: Building Department BUILDING DIVISION Re: • Tigard Auto Center — Remodel 11900 SW Pacific Hwy — Tigard. OR Permit No.: BUP2007 -00085 • Dear Sir or Madam: This is to certify that in accordance with Section 1704.1.2 of the International Building Code, we have performed special . inspection of the following item(s) per our inspection reports only: Installation of Adhesive Anchors All inspections and tests were performed and reported according to the requirements of Project Documents and, to the best of our knowledge, the work was in conformance with the approved plans and specifications, approved change orders and applicable workmanship provisions of the State Building Code and Standards, as well as the structural engineer's design changes, approvals and verbal instructions. Our reports pertain to the material tested /inspected only. Information contained herein is not to be reproduced, except in full, without prior authorization from this office. If there are any further questions regarding this matter, please do not hesitate to contact this office. • Respectfully submitted, CARLSON TESTING, INC. Steven W. Leach Project Manager A 6_ SWL/tm cc: Pro -Touch Construction — Richard Han Walker Diloreto Younie Inc — Doug Paola — ®8s 1( cip Main Office Salem offlre Rend Office Carlson Testing, Inc. Phone: 00 4060 !Wm St. NE 6301508 Riley Rd 911 T/yarvl, OR 9P_ 13 Salem OR 97101 Rend. OR 97701 Phone: (503/ 6,P4 3460 Phone /503)589-1:52 Phone: (540330.9155 Par: /5031609-0954 Par: /5031589 -1309 Fir 04/)330 -9/63 Construction Materials Testing & Inspection Special Inspection FINAL SUMMARY LETTER July 26, 2007 T0704406 City of Tigard 13125 SW Hall Blvd Tigard, OR 97223 -8199 - Attn: Building Department Re: Tigard Auto Center – Remodei 11900 SW Pacific Hwy – Tigard, OR Permit No.: BUP2007 -00085 Dear Sir or Madam: This is to certify that in accordance with Section 1704.1.2 of the International Building Code, we have performed special inspection of the following item(s) per our inspection reports only: Installation of Adhesive Anchors All inspections and tests were performed and reported according to the requirements of Project Documents and, to the best of our knowledge, the work was in conformance with the approved plans and specifications, approved change orders and applicable workmanship provisions of the State Building Code and Standards, as well as the structural engineer's design changes, approvals and verbal instructions. Our reports pertain to the material tested /inspected only. Information contained herein is not to be reproduced, except in full, without prior authorization from this office. If there are any further questions regarding this matter, please do not hesitate to contact this office. Respectfully submitted, CARLSON TESTING, INC. 57—...S /C Steven W. Leach Project Manager SW L /tm cc: Pro -Touch Construction – Richard Han Walker Diloreto Younie Inc – Doug Paola