Report 1•
• .liar„ Office Salem of /,e Bend Office • rl s o n Testing Inc • Phone• OR V2 4060 Hudson R 953 . M[ 6303, OR 97702
Rd Rl1
T end, OR V223 Salem OR 97301
Bend. OR 9770'
Phone (.503) 69e.3a60 Phone 0031529-1252 Pham: 611) 330.9155
F,u.. (5031 684 0954 Fns: (503, 589.1309 8,5134 /, 330.9163
Construction Materials Testing & Inspection
Special Inspection
FINAL SUMMARY LETTER
i c,lair7 -0° g5
July 26, 2007
T0704406
•
CEIV
City of Tigard
13125 SW Hall Blvd AUG 2007
Tigard, OR 97223 -8199
CITY OF TIGARD
Attn: Building Department BUILDING DIVISION
Re: • Tigard Auto Center — Remodel
11900 SW Pacific Hwy — Tigard. OR
Permit No.: BUP2007 -00085
•
Dear Sir or Madam:
This is to certify that in accordance with Section 1704.1.2 of the International Building Code, we have performed special .
inspection of the following item(s) per our inspection reports only:
Installation of Adhesive Anchors
All inspections and tests were performed and reported according to the requirements of Project Documents and, to the
best of our knowledge, the work was in conformance with the approved plans and specifications, approved change orders
and applicable workmanship provisions of the State Building Code and Standards, as well as the structural engineer's
design changes, approvals and verbal instructions.
Our reports pertain to the material tested /inspected only. Information contained herein is not to be reproduced, except in
full, without prior authorization from this office.
If there are any further questions regarding this matter, please do not hesitate to contact this office. •
Respectfully submitted,
CARLSON TESTING, INC.
Steven W. Leach
Project Manager A 6_
SWL/tm
cc: Pro -Touch Construction — Richard Han
Walker Diloreto Younie Inc — Doug Paola
— ®8s 1( cip
Main Office Salem offlre Rend Office
Carlson Testing, Inc. Phone: 00 4060 !Wm St. NE 6301508 Riley Rd 911
T/yarvl, OR 9P_ 13 Salem OR 97101 Rend. OR 97701
Phone: (503/ 6,P4 3460 Phone /503)589-1:52 Phone: (540330.9155
Par: /5031609-0954 Par: /5031589 -1309 Fir 04/)330 -9/63
Construction Materials Testing & Inspection
Special Inspection
FINAL SUMMARY LETTER
July 26, 2007
T0704406
City of Tigard
13125 SW Hall Blvd
Tigard, OR 97223 -8199 -
Attn: Building Department
Re: Tigard Auto Center – Remodei
11900 SW Pacific Hwy – Tigard, OR
Permit No.: BUP2007 -00085
Dear Sir or Madam:
This is to certify that in accordance with Section 1704.1.2 of the International Building Code, we have performed special
inspection of the following item(s) per our inspection reports only:
Installation of Adhesive Anchors
All inspections and tests were performed and reported according to the requirements of Project Documents and, to the
best of our knowledge, the work was in conformance with the approved plans and specifications, approved change orders
and applicable workmanship provisions of the State Building Code and Standards, as well as the structural engineer's
design changes, approvals and verbal instructions.
Our reports pertain to the material tested /inspected only. Information contained herein is not to be reproduced, except in
full, without prior authorization from this office.
If there are any further questions regarding this matter, please do not hesitate to contact this office.
Respectfully submitted,
CARLSON TESTING, INC.
57—...S /C
Steven W. Leach
Project Manager
SW L /tm
cc: Pro -Touch Construction – Richard Han
Walker Diloreto Younie Inc – Doug Paola