Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Correspondence
Brian Blalock - (fwd) Tigard Triangle Commons, Building 4 Page 1 FILE COPY From: Dan Vasquez <dan @mdgpc.com> To: < brianb @tigard - or.gov> Date: 4/28/2006 2:11:17 PM Subject: (fwd) Tigard Triangle Commons, Building 4 Brian, per your request. See you on Monday (Have a great weekend). -Dan Dan Vasquez Mildren Design Group P.C. 7650 S.W. Beveland, Suite 120 Tigard, Oregon 97223 -8692 503 -244 -0552, voice 503 - 244 -0417, fax dan @mdgpc.com ----Original Message- - Date: Thu, 20 Apr 2006 09:33:18 -0700 From: "Brian Blalock" < brianb @tigard - or.gov> Subject: Tigard Triangle Commons, Building 4 Stu, Thank you for the phone call the other day. I understand your intent. I have a past experience of not requiring property line protection of a TVWD supply line when I worked for another city. TVWD required an additional vault, with DCVA, to be placed at the property line before they would turn on the water to the project. The additional cost to the owner was around $10,000.00. Therefore, the City of Tigard is requiring, for the property file, clear documentation that TVWD will permit an unprotected water supply, to cross a property line, continue underground on private property and enter a building. There will be a DCVA on the Fire Sprinkler Riser above the floor slab inside the building. The 2 sentence, e-mail to Dan Vasquez as a response to Gene Mildren's request appears to require an easement and doesn't address the City of Tigard's concerns. Please provide the City of Tigard, Building Division, a signed letter that clearly describes and approves the conditions described above and a copy of the utility plan, sheet C3.0 ?, with an approval stamp from TVWD. These documents will be placed in the property's permanent file. Sorry for any inconvenience. Brian Blalock Plans Examination Supervisor City of Tigard ' 503 - 718 -2759 brianb@tigard-or.gov City of Tigard, Oregon • 13125 SW Hall Blvd. • Tigard, OR 97223 • .. March 23, 2007 T I G A R D Tigard Triangle Commons 11740 SW 68th Pkwy Tigard OR 97223 Pacific NW Properties PO Box 2206 Beaverton OR 97075 • Re: BUP2005- 00654, New 33,574 sq.ft. Office Building To whom it may concern: This letter is to certify that all requirements of building permit BUP2005- 00654, issued for a building shell, have been completed. The final inspection was performed and approved on March 23, 2007, by inspectors from the City of Tigard. No tenant spaces are included in this • permit, nor shall any tenant improvement be occupied until such time as each space is approved by final inspection of its specific permits, approved for the use intended and provided with a Certificate of Occupancy. The City neither guarantees nor warrants to the owner, occupant or any other person that this letter evidences strict and complete compliance with each and every ordinance or regulation of the City or the State of Oregon affecting the construction or use of said structure or the land upon which it is situated. Such compliance is the responsibility of the owner and /or occupant of the premises. This letter certifies only that the work covered under the permit number listed above has been completed. It is not permission to occupy tenant spaces. S erely, etko • Darrel Watkins Inspection Supervisor is Bldg /complltr • • • Phone: 503.639.4171 • Fax: 503.684.7297 • www.tigard- or.gov • TTY Relay: 503.684.2772 04/10/2006 MON 09:29 FAX 503 244 0417 MILDREN DESIGN 0001/002 . 1 i Karl Koroch From: Stu Davis [Stu @tvwd.org] Sent: Monday, April 10, 2006 8:14 AM To: Karl Koroch Subject: FW: Triangle Commons - Building Four Original Message From: Stu Davis Sent Monday, April 10, 2006 7:42 AM To: 'Dan Vasquez' Subject RE: Triangle Commons - Building Four All: This is to verify that TVWD does not require a specific easement for the water meter in a PUE. The DCVA or DCDA, if present for the project, is owned by the property owner and would be on private property in any event would not need an easement either. Stu Original Message From: Dan Vasquez [mailto :dan @mdgpc.com] Sent: Friday, April 07, 2006 5:09 PM To: Stu Davis Cc: brianb @ci.tigard.or.us; kkoroch @tmrippey.com; Gene Mildren Subject: Triangle Commons - Building Four Attention: Stu Davis, Tualatin Valley Water District Project Building Permit BUP2005- 00654, Triangle Commons - Building Four, 11740 SW 68th Parkway RE: Existing 6 - inch Public Fire Service Mr. Davis, The City of Tigard is requiring written documentation that Tualatin Valley Water District does not require an easement for die existing 6 -inch public fire service line coming off of 68th Parkway for Building Four. Per our phone conversation this afternoon please reply to i email with confirmation that no easement is required and forward to all parties included above. We are planning to obtain the permits for Building Four on Monday and will need this information In order to do so • - your prompt response will be greatly appreciated. Do not hesitate to contact myself or Gene Mildren with any questions. Thank you. • • 1 CITY Ir G kahroi April 10, 2006 Approved m..a• I IX ConditionallY .. ; CITY OF TIGARD See Letter to: F ( .. r OREGON Mildren Design Group, PC Permit • • - - y Dan Vasquez 1650 SW 105 Ave, Suite 175 B Y' Tigard, OR 97223 C4 S YAI NcNte( y /0 /04 RE: TRIANGLE COMMONS BUILDING FOUR - NEW BUILDING - REVIEW _ Project Information Building Permit BUP2005 -00654 Construction Type: % III -B Tenant Name: Pacific Northwest Property Occupancy Type `\ B Address: 11740 SW 68 Ave. Occupant Load: , 336 Area: 33,574 sq ft Stories: / 2 The plan review was performed under the State of Oregon Structural Specialty Code (OSSC) 2004 edition and 2004 Oregon Fire Code as amended by TVF&R The submitted plans are approved subject to the following conditions. , 1. The structural review was reviewed and approved by Miller Consulting Engineers March 22, 2006. (review doc. attached). 2. Special inspection is required for concrete, welding reinforcing steel, bolting, welded studs, • embed plates, bolts in concrete, masonry, soils, structural steel fabrication and erection, adhesive and expansion anchor installation, (as items listed on sheet A0.1 and Miller Consulting Engineers approved review letter). The special inspection agency of record shall furnish inspection reports to the Engineer of Record, Afghan Associates, the General Contractor, and the City of Tigard, Building Division, attention Hap Watkins. All discrepancies shall be brought to the immediate attention of the general contractor for correction. The special inspector shall submit a final signed report stating whether the work requiring special inspection was, to the best of the inspector's knowledge, in conformance with the approved plans and specifications and the applicable workmanship provisions of the code. 1701.3 OSSC 3. Structural Observations is required per section 1709 Oregon Structural Specialty Code (OSSC). The owner shall employ a registered design professional to perform structural observations as defined in Section 1702, OSSC. Structural observations is required for concrete foundation, reinforcing steel in tilt -up panels before concrete placement at second floor, placement of floor joist and girders (as items listed on Miller Consulting Engineers approved review letter). Deficiencies shall be reported in writing to the owner and to the City of Tigard, Building Division, attention Hap Watkins. FYI The structural observations do not waive the framing inspection required by code. 4. Live Loads Posted: The live loads for which each floor has been designed to exceed 50 psf shall 13125 SW Hall Blvd., Tigard, OR 97223 (503) 639 -4171 TDD (503) 684 -2772 • be conspicuously posted by the owner in that part of each story in which they apply, using durable metal signs, and it shall be unlawful to remove or deface such notices. The occupant of the building shall be responsible for keeping the actual load below the allowable limits. 1603.3 OSSC FIRE LIFE AND SAFETY / GENERAL 1. The main exterior door or doors are permitted to be equipped with key - operated locking \� devices from the egress side provided: / 5 1. The locking device is readily distinguishable as locked, 2. A readily visible durable sign is posted on the egress side on or adjacent to the door stating. THIS DOOR TO REMAIN UNLOCKED WHEN BUILDING IS OCCUPIED. The sign shall be in letters 1 inch (25 mm) high on a contrasting background. Sec. 1008.1.8.3 2. All exit doors shall be openable from the inside without the use of a key or any special knowledge or effort Sec. 1008.1.8 3. Exits and exit access doors shall be marked by an approved exit sign readily visible from any direction of egress travel. Access to exits shall be marked by readily visible exit signs in cases where the exit or the path of egress travel is not immediately visible to the occupants. Sec. 1011.1 4. Exit signs shall be illuminated at all times and shall be provided with a second source of power that will provide 1 1/2 hours of illumination in case of primary power loss. Sec. 1006.3 FYI Additional exit signs may be required by the'city field inspector to dearly indicate the path of egress. 5. The means of egress shall be provided with illumination of not less than 1 foot candle at the floor level anytime the building is. occupied. The means of egress illumination shall be provided with a second source of power in case of primary power loss. Sec. 1006.2 9. All elevators, required or provided, shall be located on an accessible route and shall be designed and constructed to comply with Chapter 30 and the Oregon Elevator Specialty Code. 1108.3.2 OSSC 10. Floor drains shall not be located within the dear floor space at a lavatory, water closet, urinal, or bathtub or shower. Floors shall not slope in excess of 1 unit vertical in 50 units horizontal (2- percent slope). Floor drains shall comply with Section 1109.4.5 and be without abrupt changes of level. Exception: Floor dndns may be located within a clearfoor.►pacace at a fixture provided the openings in the drain cover shall not exceed %2 inch (12.7 mm) in any direction and the drain cover shall be no more than 1 / 8 inch below the level of the surrvundinglinished floor surface. 1109.10.1 OSSC 11. Safety glazing including but not limited to: the following locations: Each unit of glazing shall be permanently identified by the manufacturer. Sec. 2406. Some of these locations are as follows: a. Glazing in ingress and means of egress doors. lit b. Glazing in an individual fixed or operable panel adjacent to a door where the nearest vertical edge is within a 24" arc of the door in a closed position and whose bottom edge is less than 60" above the floor or walking surface except when there is an intervening wall or other permanent barrier between the door and the glazing. 12. Deferred submittals such as Fire Alarm, Fire Sprinkler, Truss Joist Shop Drawings, etc, will be charged a deferred submittal fee based on the valuation of the portion of the work being deferred. The minimum fee shall be $200.00. Deferred Items: As noted on sheet A0.1 Steel joist & joist girders Steel stairs Component anchorage Block retaining wall � � HVAC Pluming Fire sprinkler Electrical ✓: Fire alarm Low voltage NOT PART OF THIS REVIEW: * Electrical * Fire Sprinklers .- - * Mechanical System * Plumbing American with Disabilities Act (ADA): It shall be the responsibility of the Architect, Engineer, Designer, Contractor, Owner and Lessee to research the 'applicability of the ADA requirements for the structure. The City of Tigard reviews the plans and inspects the structure only for compliance with Chapter 11 of the OSSC, which may not indude all of the • requirements of the ADA. . Approved Plans: 1 set of approved, plans, bearing the City of Tigard approval stamp, shall be maintained on the jobsite. The plans shall be available to the Building Division inspectors throughout all phases of construction. 106.3.1 OSSC Certificate of Occupancy. No building or structure shall be used or occupied until the Building Official has issued a certificate of occupancy 109.1 OSSC Premises Identification: Approved numbers or addresses shall be provided for all new buildings in III such a position as to be plainly visible and legible from the street or road fronting the property. When submitting revised drawings or additional information, please attach a copy of the enclosed City of Tigard, Letter of Transmittal The letter of transmittal assists the City of Tigard in tracking and processing the documents. Respectfully, • Val Henze Senior Plans Examiner /17 y Washington County, Oregon 2006- 114356 • 09!25!2006 03:47:30 PM D -E . Cnto1 Stn =29 RECORDe1 $20.00 SOAO $11.00 • TOtai . $31.00 EASEMENT 1111111111111 I 1 1E1 • • 01014869200601143560040044 I, Richard Hobemlcht, Director or A mint and „w,a Taxation and Ex-Officio County Clerk for Washington , • County, Oregon, do hereby certify that the within f Instrument of writing was received and recorded in the book of records olealdtriy. ^ ,. ‘ Richard W. Hobemicht, Director ofAmeeeament and •,t,r;.,10 • 1 3 NO Taxation, Ex -Officio County Clerk After Recording Return To: `7,14 O % Tualatin Valley Water District 4Q Attn: General Manager J 1` 1850 SW 170th Avenue ,otY - ' P.O. Box 745 _ t y `i Beaverton, OR 97075 • No than • e in Tax Statements EASEMENT • This AGREEMENT made and entered into this 45 day of L e .4 r 2006, by and between PACIFIC NW PROPERTIES, hereinafter called the first party, and TUALA' IN VALLEY WATER DISTRICT, hereinafter called the second party, WITNESSETH: WHEREAS: The first party is the record owner of the real property in Washington County, State of Oregon, to- wit: See EXHIBITS "A" and "B ", attached. and has the unrestricted right to grant the easement hereinafter described relative to the real estate. NOW THEREFORE, in view of the premises and in consideration of $1.00 by the second party to the first party paid, the receipt of which is acknowledged by the first party, it Is agreed: The first party hereby grants, assigns and sets over the second party an easement, to -wit: The purpose of the easement is for installation and maintenance of a domestic water meter serving the "Tigard Triangle Commons — Building Four" at 11740 SW 68 Parkway, Tigard, OR. The second party shall have all rights of ingress and egress to and from the real estate (including the right from time to time, except as hereinafter provided, to cut, trim and remove trees, brush, overhanging branches and other obstructions) necessary for the second party's use, enjoyment, operation and maintenance of the easement hereby granted and all rights and privileges incident thereto. Except as to the rights herein granted, the first party shall have full use and control of the above - described real estate. The second party agrees to save and hold the first party harmless from any and all claims of third parties arising from the second party's use of the rights herein granted. The period of this easement shall be continuous, always subject, however, to the following specific conditions, . restrictions and considerations: PAGE 1 of 2 EASMENT TlgardTriangleCommonsE7000.doc The second party shall be responsible for restoration of the site following Installation of the meter vault and restoration of any landscaping materials damaged during construction or maintenance activities. During the existence of this easement, maintenance of the easement and cost of repair of the easement, if damaged by natural disasters or other events for which all holders of an interest in the easement are blameless, shall be the responsibility of the second party. During the existence of this easement, holders of an interest in the easement who are responsible for damage to the easement because of negligence or abnormal use shall repair the damage at their sole expense. The First Party shall be responsible for mowing of grass and maintenance of landscape materials (trees, shrubs and the like) during the existence of this easement. This agreement shall bind and inure to the benefit of, as the circumstances may require, not only the parties hereto but also their respective heirs, executors, administrators, assigns, and successors in interest. In construing this agreement, where the context so requires, the singular includes the plural and all grammatical changes shall be made so that this agreement shall apply equally to individuals and to corporations. If the undersigned is a corporation, it has caused its name to be signed and its seal, if any, affixed by an officer or other person duly authorized to do so by its board of directors. IN WITNESS WHEREO -,r e parties have agreed this gas day of 4_ , 2006. PACIFIC NW PROP TUALATIN VAL Y WATER DIST ICT (FIRST PAR / 1f/ (SECOND P ) By: � — By: Pe ted Nine &Signature reg egory DiLoreto P et( Title General Manager STATE OF OREGON) STATE OF OREGON) County of . N County of Washington Pers.k app = - -• - ire me on the 90 Personal) ; app-ared before me on the g5 da o , 006, the above named 'TWA • :y of L.! . , 200., the above named _ 4 , and acknowledges the foregoing '•• • n of the Tualatin Valley Water Easement to be his/her/its voluntary act and deed. Dis q , , d by the authority of Its Board of Commissioners acknowledges the foregoing Easement to be h' er/its voluntary act and deed. AP 4 NOTARY PUBLIC FOR OREGON c NOTARY P BLIC FO R QON My Commission Expires: d� � a My Commis ion Expires: j Act 108 • OFFICIAL SEAL ....L AT KRISTIN L SLOCUM O OFFICIAL SEAL NOTARY PUBLIC - OREGON ) PATTY RUPP )� f MV CO COMMISSION NO. 38 k-; " NOTARY PUBLIC OREGON ��ti ! ? ,X • I - E OCT. 1 0 `� COMMISSION NO. 383378 MY COMMISSION EXPIRES AUGUST 29, 2008 PAGE 2 of 2 EASMENT TigardTrlangleCommonsE7000.doc .... S.'''''-"''''- ti l'h5 J P 'Y,�'" � -S ' z S ,, ' ....-.4., Ito 1760 SW Skyline Blvd. - Suite 105 N ® ® LIE Portland, Oregon 97331 Phone : (503) 293 -8083 ® Fax : (503) 292 -0938 E : we Excellence Is our benchmark. REGISTERED PROFESSIONAL LAND SURVEYOR . e ms: September 13, 2006 LY 13, 2004 Job No. 3721H2OE ANTHONY t3. RYAN 58833 WATERLINE EASEMENT RENEWAL DATE: DEC. 31. 't, LEGAL DESCRIPTION: Exhibit "A" A tract of land for waterline easement purposes, being a portion of that certain tract of land described in Statutory Bargain and Sale Deed to PNWP LLC, an Oregon limited liability company, recorded April 13, 2006, as Document No. 2006043635, Washington County Deed Records, in the Southeast 174 of Section 36, Township 1 South, Range 1 West of the Willamette Meridian, City of Tigard, County of Washington and State of Oregon, more particularly described as follows: Commencing at the Northwest corner of Lot .9, Block 8, West Portland Heights, a duly recorded subdivision in Washington County, said point being on the Easterly right of way line of SW 68th Parkway, 30.00 feet from the centerline thereof; thence along the North line of said Lot 9 North 89 °59'37" East, 5.00 feet to the Northeast corner of that certain tract of land described in Dedication Deed recorded November 3, 2005, as Document No. 2005138311, said Deed Records; thence along the East line thereof South 00°04'15" East, 165.44 feet to the True Point of Beginning of the herein described tract of land; thence leaving said East line North 90 °00'00" East, 4.14 feet to the Northerly extension of the West face of a proposed commercial building; thence South 00 °00'00" East, 15.00 feet; thence North 90 °00'00" West, 4.12 feet to the East line of that tract of land . described in said Document No. 2005138311; thence along said East line North 00 °04' 15" West, 15.00 feet to the True Point of Beginning. J Containing therein 62 square feet. The bearings for this description are based on Record of Survey No. 28789, Washington County Survey Records. . i R 4. Exh i b it ' II =,�jI 11i. � '_ WATERLINE EASEMENT , � I. SW eanox sr. a SE 1 1/4 SEC. 36, T.1 S., R.1 W., W.M. • • I -i SCALE: 1 " = 60' City of Tigard, Washington County, Oregon SCA 09 -13 -06 IIPP DATE: sw a�xm+y ST. - , - - M 1 ^= N.T.S. CI REGISTERED '`' S 00°00'44"W _ - PROFESSIONAL ?1�� .�«� — I LAND SURVEYOR b SW 67TH AVENUE f,., r Fll co al 1:4 C JULY 13. 2004 co I I I I — - I I I DOC. NO. 2006043635 I I L_ — __ 4=89°57'56" ANTHONY B. RYAN 58833 j EXPIRES DECEMBER 31, 2006 I = 43.00' I i I I ai 1 c I 1 a ! — N $ 44:5s'42"E C-a - -�,, I I I I ov ao I t SR: s0 79• I Z m I I I I I I I I 1 .—+ • I I I I I I { 1 1 0 Surveyor: — — I I I I I I Weddle Surveying � _ L_ _ _ — r L __I _ e 17 SW Skyline Blvd. F. nit - Suite 105 t I I 1 1 t4 t I I °o 30' I 30' Portland, OR 97221-25 _ �Q 1 I I I 44 � Ph. (503) 292 -8083 0° '" � I - I c I I " i M I I 1 Fax: (503) 292 -0938 ' — I i I 1 I I I � ' to a, I '1.1 - I I I o gn I N I N 90°00'00' W 03 CO ° a, a 14 - I I I I S 00°00'00"E 4.12' I v' co CD Z112 i I - 15.00' .1.$9 I S 02°21'42"E .r I 1 •• • • - 5 .000 0. ' ,. - - --' 83.62' A = 87°39'40° - -- 5 T.P_O.B. R = 25.00' WATERUNE EASE EASEMENT , lc! L = 38.25' a S 00°04'15 "E 242.33' IIn CB= S 4691'32 "E �y _ - S 00°04 15"E - C = 34.63' - - EAST UNE STREET DEDICATION SW 68TH r�sH PARKWAY ` — DOC. NO. 2005138311 NORTHWEST CORNEA. OF LOT 9, BLOCK 8, WEST PORTLAND HEIGHTS • JOB NO. 3721 H2OE Tigard Triangle Commons - Bldg. 4 Page 1 of 1 Val Henzel - FW: Tigard Triangle Commons - Bldg. 4 From: "Justin Cole" <JCole @tmrippey.com> SEP . To: <val @tigard- or.gov >, <brianb @ tigard- or.gov> Date: 9/26/2006 7:28 AM Subject: FW: Tigard Triangle Commons -Bldg. 4 . • CC: <stu @tvwd.org >, "Karl Koroch" <KKoroch @tmrippey.com >, <gene @mdgpc.com> • Val This email came through yesterday from Stu Davis at TVWD. As you can see, the intent is to verify TVWDs acceptance of the location of the DCDA inside the building. Additionally, the easement was recorded at Washington County yesterday. We also received a revised plan from Delta Fire yesterday which now shows the FDC line I would like to meet this morning with hard copies of all of this information as well as the most • current version of our utility plan for Building One in order to get an approved plan for the contractor to begin work. Please let me know what your schedule is so we can get this resolved as soon as possible. Thanks for all your help on this. Justin Cole T.M. Rippey Consulting Engineers 7650 S.W. Beveland, Suite 100 Tigard, OR 97223 Phone: 503.443.3900 FAX: 503.443.3700 http: / /tmrippey.com Email: jcole @tmrippey.com From: SW Davis [mailto:Stu @tvwd.org] Sent: Monday, September 25, 2006 12:08 PM To: Justin Cole Subject: Tigard Triangle Commons - Bldg. 4 Justin: The purpose of this email is to confirm that TVWD has agreed that it is acceptable to install the DCDA for the fire service line in the mechanical room of Bldg. 4 in the Tigard Triangle Commons. Stewart Davis, P.E. Senior Engineer —TVWD 503/848 -3025 file: / /C:\Documents and Settings \val.000\Local Settings \Temp \GW }00002.HTM 9/26/2006 Justin Cole From: Stu Davis [Stu ©tvwd.org] Sent: Monday, September 25, 2006 12:08 PM To: Justin Cole SEP r . ,' IK Subject: Tigard Triangle Commons - Bldg. 4 Follow Up Flag: Follow up Flag Status: Red Justin: The purpose of this email is to confirm that TVWD has agreed that it is acceptable to install the DCDA for the fire service line in the mechanical room of Bldg. 4 in the Tigard Triangle Commons. Stewart Davis, P.E. Senior Engineer —TVWD 503/848 -3025 9/26/2006 . r G EO DESIGN ' ll7No March 15, 2007 -YO Pacific Northwest Properties P.O. Box 2206 Beaverton, OR 97075 Attention: Mr. Paul Gram Letter of Compliance Geotechnical Engineering Construction Observation Services - Building 4 Tigard Triangle Commons Intersection of SW 67th Avenue and SW Clinton Street Tigard, Oregon GeoDesign Project: PNWP -30 -04 This letter provides GeoDesign, Inc.'s summary comments on the geotechnical construction observation services completed for Building 4 of the Tigard Triangle Commons project in Tigard, Oregon. The site is located at the intersection of SW 67"' Avenue and SW Clinton Street in Tigard, Oregon. • GeoDesign observed the mass grading operations, which included site cuts and fills and retaining wall construction. The retaining wall is located to the north and east of Building 4 and•is a combination lock and load wall and cast -in -place concrete wall. We observed all foundation and floor slab subgrades prior to concrete placement. Crushed rock material for floor slab support, utility trench and retaining wall backfill, and parking lot aggregate base were evaluated by completing in -place density testing. Members of our geotechnical staff observed geotechnical- related tasks identified above on a part- time and on -call basis. The results of our site visits were summarized in daily field reports, copies of which have been provided to the design /construction team members. Areas where test results indicated inadequate relative compaction were reworked and re- compacted until the specified compaction was achieved. Within the limits of work observed and reported during the requested site visits, the above - referenced tasks were completed in general accordance with the plans and specifications and the geotechnical recommendations. 15575 SW Sequoia Pkwy - Suite 100 I Portland OR 97224 I Off 503.968.8787 I Fax 503.968.3068 1 We appreciate the opportunity to work with you on this project. Please call if you have questions • concerning the information provided. Sincerely, `�CO'O p �FEc ppnn GeoDesign, Inc. r \D -- tt 4v4 F9Dy �? 8309 9 Scott P. McDevitt, P.E. O Proje EOeer s' ►- t � 20�'. �l TP titc� `�� '� I I21 EXPIRES: 31 Geor Saunders; P.E. Principal Geotechnical Engineer cc: Mr. Gene Mildren, Mildren Design Group (one copy submitted) Mr. Les Jacobson, P &C Construction (one copy submitted) SPM:GPS:ke Two copies submitted Document ID: PNWP- 30 -04- 031507- geoloc.doc © 2007 GeoDesign, Inc. All rights reserved. • • G EODESIGN? 2 PNWP -30- 04:031507 • JOB NAME: Tigard Triangle Commons — Building Four / CITY OF TIGARD JOB ADDRESS: Sixty- eighth and Dartmouth BUILDING DEPARTMENT DATE: January 16, 2006 13125 HALL BOULEVARD MCE Project No.: 060047 TIGARD, OR 97223 SHEET 1 OF 1 Tigard Building Permit BUP- 2005 -00654 • STRUCTURAL PLAN REVIEW #1 (Plans dated 12/14105) Item Code Page No. Comments No. Reference 1 Section 106.1.1 Plans, details and calculations are not completed enough to perform a structural plan review. S2.1, S2.2 and Grids at openings are not compatible. S2.3 with S3.1 S2.2 Seismic around openings not calculated or detailed. S2.2 and S2.3 Beam sizes in calculations larger than beam sizes noted on plans. S3.1 Dimensions of panels conflict on architectural drawings. (Note: Items listed above are an EXAMPLE of incomplete information. Provide complete plans, details and calculations.) 0 • *1 Val Henze! - Tigard Triangle Commons Page 1 From: Heidi McGreal <Heidi @millerengrs.com> To: "'brianb @ci.tigard.or.us "' <brianb@ci.tigard.or.us> Date: 1/16/2006 7:40:08 AM Subject: Tigard Triangle Commons «Plan Review 1__1- 16- 06.pdf» At Eric Watson and Ray Miller's request, attached for your files is the Structural Plan Review #1 for the subject project. Please feel free to call Eric Watson should you have any questions. Sincerely, Heidi McGreal Ol Administrative Assistant Miller Consulting Engineers, Inc. O 9570 SW Barbur Blvd., Suite 100 Portland, Oregon 97219 Phone: (503) 246 -1250 Fax: (503) 246 -1395 EMAIL: heidi@millerengrs.com Web: www.millerengrs.com CC: "'hamid @afghaninc.com'" <hamid @afghaninc.com> hi i O January 18, 2006 CITY OF TIGARD OREGON Mildren Design Group, PC Dan Vasquez 1650 SW 105 Ave, Suite 175 Tigard, OR 97223 RE: TRIANGLE COMMONS - NEW BUILDING - REVIEW Project Information Building Permit: BUP2005 -00654 Construction Type: BI -B Tenant Name: Triangle Commons Occupancy Type: B Address: 11850 SW 67 Ave. Occupant Load: 240 Area: 33,574 sq ft Stories: 2 The plan review was performed under the State of Oregon Structural Specialty Code (OS SC) 2004 edition; and the State of Oregon Fire Code (OFC) 2004 edition. The following information is required in order to complete the review. SITE 1. Our files show that only a permit was issued for tree- removal, site grading and erosion control. Please submit site permit application with valuation of site work. Complete form to show all impervious area, excavation, grading and fill volumes. Please complete both sides of the form. 2. Provide location, design and construction of all retaining walls on site. OSSC 1806 • 3. Provide a copy of attached TVF &R form for review. STRCTURAL 4. The structural review was completed by Miller Consulting. The plan review dated January 16, 2006; was E- Mailed to Afghan Associates for response (review doc. attached). • 5. There is no design or construction information on the Canopy. OSSC 3105 Is this a deferred submittal? OSSC 106 6. The permit applicant shall submit a statement of special inspections prepared by the registered design professional in responsible charge in accordance with Section 106.1 as a condition for permit issuance. This statement shall include a complete list of materials and work requiring special inspections by this section, the inspections to be performed 13125 SW Hall Blvd., Tigard, OR 97223 (503) 639 -4171 TDD (503) 684 -2772 and a list of the individuals, approved agencies or firms intended to be retained for conducting such inspections. The statement on sheet S1.0 does not give a complete list please provide the above prior to permit issuance. OSSC 1704.1.1 FIRE LIFE - SAFETY 7. Provide information on wall assembly types not found on sheet A2.4.1, for spaces 105, 110, 205,210, stair #1 & 2, etc. OSSC 106 8. The wall assembly for P2C on sheet A2.4.1 referenced to assembly locations sheet A5.1 is not listed. OSSC 106 9. Provide construction information for interior wall design, connections and gage of metal studs used. OSSC 106 GENERAL 10. Provide solution for vapor barrier requirement. Plan sheet S2.1 shows no vapor barrier note #1 refers back to Geo report. Vapor barrier required per Geo report sec 4.7.and OSSC 1911.1. OSSC 106 11. FYI: Many contractors use a alternate pneumatic connection design substitution for steel decking other than that stated on sheet S1.0. If design noted on submitted plans is not to be used for construction and an alternant is requested after approval of plan than a complete structural design shall be submitted for review to this office to forward to Miller Consulting to complete the review. This review could hold up the construction of the project until review is completed. If you wish you can provide an alternate design at this time for review wile the project is still under review. OSSC 106 12. The footings on the SW corner grid E appears to encroach into the public way if this is so this will need to be resolved thru the City engineering department. 13. FYI: Deferred submittals such as Fire Alarm, Fire Sprinkler, Truss Joist Shop Drawings, etc, will be charged a deferred submittal fee based on the valuation of the portion of the work being deferred. The minimum fee shall be $200.00. Deferred Items: 1. Steel Joist & Joist Girders 5. Fire Sprinklers 2. Elevator Design (State of Oregon Regulated) 6. Fire Alarms 3. Architectural Veneer Attachment 7. Steel Stairs 4. Electrical & Mechanical Component Anchorage NOT PART OF THIS REVIEW: • Electrical, Fire Sprinklers, Fire Alarms, Mechanical System, & Plumbing Please provide an item by item response. • • When submitting revised drawings or additional information, please attach a copy of the enclosed City of Tigard, Letter of Transmittal. The letter of transmittal assists the City of Tigard in tracking and processing the documents. Respect , Val Henzel, Senior Plans Examiner Diagni''�lq�uiN4111•' OI � January 10, 2006 CITY OF TIGARD OREGON Miller Consulting Engineers 9570 Barbur Boulevard Portland, OR RE: PERSONAL SERVICES CONTRACT Project Information Building Permit: BUP2005 -00654 Occupancy Type: B Tenant Name: Triangle Commons Construction Type: IIIB Address: 11850 SW 67 Parkway Occupant Load: NA Area: 33,574 Sq Ft Stories: 2 To whom it may concern, Please review the accompanying documents for vertical and lateral structural design. The project is to be reviewed under the International Building Code, 2003 edition, with 2004 State of Oregon Amendments. Enclosed are a 1 Geotechnical Report, 1 binder of Structural Calculations, 1 Set of full size drawings and a copy of the permit application indicating the Structural Fees collected. Please assess your fees per the Personal Service Contract and bill accordingly. . If you need additional information please call me at 503- 718 -2759. Respectfu , an Bla�a, Plans �ination Supervisor 13125 SW Hall Blvd., Tigard, OR 97223 (503) 639 -4171 TDD (503) 684 -2772 • February 24, 2006'°" �°^-• . MILDREN DESIGN GROUP, P.C. Val Henzel, Senior Plans Examiner Architecture • Space Planning City of Tigard 13125 SW Hall Blvd. Tigard, OR 97223 ?,FC Re: Checklist Response Letter 2 2006 Triangle Commons - New Building (Building Four) • SE' Permit #: BUP2005 -00654 or �� i • GOVI Dear Ms. Henzel, ,�� 111 This letter is in response to your Permit Review Comments Letter (dated January 18, 2006) for the above - referenced project. The following items have been addressed in the revised drawing submittals (dated February 13, 2006) and have been itemized in this letter below - responses are in italics. SITE 1. Our files show that only a permit was issued for tree - removal, site grading and erosion control. Please submit site permit application with valuation of site work. Complete form to show all impervious area, excavation, grading and fill volumes. Please complete both sides of the form. Site permit application was submitted on February 3, 2006. 2. Provide location, design and construction of all retaining walls on site. OSSC 1806 Retaining walls will be a separate (deferred) submittal, see Sheet A0.1. 3. Provide copy of attached TVF &R form for review. TVF&R form has been provided with this submittal. STRUCTURAL 4. The structural review was completed by Miller Consulting. The plan review dated January 16, 2006, was E- Mailed to Afghan Associates for response (review doc. attached). An example structural review form was provided by Miller Consulting. A complete set of structural drawings has been included in this submittal (see attachment list below for sheet information). 5. There is no design or construction information on the Canopy. OSSC 3105 Is this a deferred st.Jmittal? OSSC 106 7650 SW Beveland Street, Suite 120 Tigard, Oregon 97223 • 503 244 0552 Fax 503 244 0417 Triangle Commons - New Building (Building Four) Review Comments Letter Response February 23, 2005 P:\ 101100. 04\ wp \LTR_COTchecksheetresponse.wpd Page 2 Canopy information has been provided on detail 14/S4.1 and details 7, 8 and 9 on Sheet S5.3. 6. The permit applicant shall submit a statement of special inspections prepared by the registered design professional in responsible charge in accordance with Section 106.1 as a condition for permit issuance. This statement shall include a complete list of materials and work requiring special inspections by this section, the inspections to be performed and a list of the individuals, approved agencies or firms intended to be retained for conducting such inspections. The statement on sheet S1.0 does not give a complete list please provide the above prior to permit issuance. OSSC 1704.1.1 A complete special inspections list will be provided prior to permit issuance. FIRE LIFE- SAFETY 7. Provide information on wall assembly types not found on sheet A2.4.1, for spaces 105, 110, 205, 210, stair #1 & 2, etc. OSSC 106 Wall assembly information has been provided on sheet A2.4.1. 8. The wall assembly for P2C on sheet A2.4.1 referenced to assembly location sheet A5.1 is not listed. OSSC 106 Wall assembly information has been provided on sheet A2.4.1. 9. Provide construction information for interior wall design, connections and gage of metal studs used. OSSC 106 Interior wall information has been provided on sheets A2.1.1, A2.1.2 and A2.4.1. GENERAL 10. Provide solution for vapor barrier requirement. Plan sheet S2.1 shows no vapor barrier note #1 refer back to Geo report. Vapor barrier required per Geo report sec 4.7 and OSSC 1911.1. OSSC 106. Note on sheet S2.1 has been revised. 11. FYI: Many contractors use an alternate pneumatic connection design substitution for steel decking other than that stated on sheet S 1.0. If design noted on submitted plans is not to be used for construction an alternant is requested after approval of plan than a complete structural design shall be submitted for review to this office to forward to Miller Consulting • Triangle Commons - New Building (Building Four) Review Comments Letter Response February 23, 2005 P:\ 101100.04 \ wp \LTR COTchecksheetresponse.wpd Page 3 to complete the review. This review could hold up the construction of the project until review is completed. If you wish you can provide an alternate design at this time for review while the project is still under review. OSSC 106. Alternate construction method will be determined after complete review by Miller Consulting. . 12. The footings on the SW corner grid E appears to encroach into the public way if this is so this will need to be resolved thru the City engineering department. Footings have been revised to remain within property lines - see Foundation Plan, sheet S2.1. 13. FYI: Deferred submittals such as Fire Alarm, Fire Sprinkler, Truss Joist Shop Drawing, etc, will be charged a deferred submittal fee based on the valuation of the portion of the work being deferred. The minimum fee shall by $200.00. Deferred Items: 1. Steel Joist & Joist Girders 2. Elevator Design (State of Oregon Regulated) 3. Arcl,ik.,tvhal Vencci Attach,m1t 4. Electrical & Mechanical Component Anchorage 5. Fire Sprinklers 6. Fire Alarms 7. Steel Stairs Note: Architectural veneer attachment has been included in the permit drawings and is not a deferred submittal. See revisions to deferred submittal list on sheet A0.1. End of Review Comments Please do not hesitate to contact me with any comments or questions. Cordially, .-■••q‘?CD4fOr Dan Vasquez Project Manager DAV /dav Attachments: • Revised architectural drawings A0.1, A2.1.1, A2.1.2 and A2.4.1 (4 sheets total). • Revised structural drawings S1.0, S2.1, S2.2, S2.3, S3.1, S3.2, S4.1, S5.1, S5.2, S5.3, S5.4 and S5.5 (12 sheets total). • • Revised structural calculations (Notebook). Job Name: Triangle Commons — Building Four CITY OF TIGARD Job Address: Sixty- eighth and Dartmouth 13125 SW HALL BLVD. March 7, 2006 TIGARD, OR 97223 SHEET 1 OF 2 MCE Project No.: 060047 STRUCTURAL PLAN REVIEW #2 Plans Dated 02113/06 Correction Item Page No. . Comments Code Reference Made No. 1 Sheet S2.2 Submit calculations and details for 106.1.1 Grid 7 & E connection of W24x84 to concrete panel. 2 Sheet S2.3 Submit calculations and details for lateral 106.1.1 Grid 4 & D load transfer of roof diaphragm to concrete shear wall. 3 Sheet S2.3 Submit calculations and details for • 106.1.1 Grid 7 & E connection of W24x55 to concrete panel. 4 Sheet S2.3 Submit size and details for roof members 106.1.1 Grids 6 to 7 indicated but not noted. andAtoC 5 Sheet S4.1 Clarify weld at base plate. 15 inches ACI 318 Detail 10/S4.1 noted to concrete panel, 10 inches noted 21.13 to base plate. 6 Sheet S4.1 Clarify tie spacing. ACI 530 Detail 14/S4.1 1.13.6.5 . 7 Sheet S5.2 Submit and show weld at knife plate to 106.1.1 Detail 3/S5.2 embedded plate. 8 Sheet S5.2 Clarify shown reinforcing steel in concrete 106.1.1 Detail 14/S5.2 slab. 9 Sheet S5.3 Submit spacing and detail for HSS 6x4 106.1.1 Detail 10/S5.3 top piece and supporting HSS 6x4 columns. 10 Sheet S5.4 Submit calculations for span and deck 106.1.1 Detail 12/S5.4 siding. • 11 Sheet S5.5 Submit calculations for HSS 6x6x3/8 for 106.1.1 Detail 1/S5.5 W21 knife plate into column wall. 12 Special Special inspection is required for 1704 Inspection concrete, welding, reinforcing steel, 1705 bolting, welded studs, embed plates, bolts 1707 in concrete, masonry, soils, structural 1708 steel fabrication and erection, adhesive and expansion anchor installation. 13 Structural Structural observation is required for 1709 Observation concrete foundation, reinforcing steel in tilt -up panels before concrete placement at second floor, "placement of floor joist and girders. Job Name: Triangle Commons — Building Four CITY OF TIGARD Job Address: Sixty - eighth and Dartmouth 13125 SW HALL BLVD. March 7, 2006 TIGARD, OR 97223 SHEET 2 OF 2 MCE Project No.: 060047 STRUCTURAL PLAN REVIEW #2 Plans Dated 02/13/06 Correction Item Page No. Comments Code Reference Made No. • 14 General Submit one set of reinforcing steel shop drawings, which have been reviewed and initialed by the project engineer, to be filed with the City of Tigard before • placement. 15 General Submit one set of steel open -web joist and girders shop drawings, which have been reviewed and initialed by the project engineer, to be filed with the City of Tigard before placement. • 16 General Submit one set of light gage metal framing shop drawings, which have been reviewed . and initialed by the project engineer, to be filed with the City of Tigard before placement. 17 .General Submit one set of steel decking shop drawings, which have been reviewed and initialed by the .project engineer, to be filed with the City of Tigard before placement. 18 General Submit one set of stair framing shop drawings, which have been reviewed and initialed by the project engineer, to be filed with the City of Tigard before placement. 19 General Submit one set of miscellaneous steel shop drawings, which have been reviewed and initialed by the project engineer, to be filed with the City of Tigard before placement. 20 General Approved resolution of the above shall be incorporated into submittal plans before a permit will be issued. Submit four (4) sets of revised plans to the city of Tigard. Job Name: Triangle Commons — Building Four CITY OF TIGARD 0 Job. Address: Sixty- eighth and Dartmouth 13125 SW HALL BLVD. March 22, 2006 TIGARD, OR 97223 SHEET 1 OF 2 FILE COPY MCE Project No.: 060047 STRUCTURAL PLAN REVIEW #2 Plans Dated 02/13/06 Correction Item Page No. Comments Code Reference Made No. 3121/06 1 Sheet S2.2 Submit calculations and details for 106.1.1 Grid 7 & E connection of W24x84 to concrete panel. 3/21106 2 Sheet S2.3 Submit calculations and details for lateral 106.1.1 Grid 4 & D load transfer of roof diaphragm to concrete shear wall. 3/21/06 3 Sheet S2.3 Submit calculations and details for 106.1.1 Grid 7 & E connection of W24x55 to concrete panel. 3/21/06 4 Sheet S2.3 Submit size and details for roof members 106.1.1 Grids 6 to 7 indicated but not noted. andAtoC 3/21/06 5 Sheet S4.1 Clarify weld at base plate. 15 inches ACI 318 Detail 10/S4.1 noted to concrete panel, 10 inches noted 21.13 to base plate. • 3/21/06 6 Sheet S4.1 Clarify tie spacing. ACI 530 • Detail 14/S4.1 1.13.6.5 321/06 7 Sheet S5.2 Submit and show weld at knife plate to 106.1.1 Detail 3/S5.2 embedded plate. 3/21/06 8 Sheet S5.2 Clarify shown reinforcing steel in concrete 106.1.1 Detail 14/S5.2 slab. 3/21/06 9 Sheet S5.3 Submit spacing and detail for HSS 6x4 106.1.1 Detail 10/S5.3 top piece and supporting HSS 6x4 columns. 3/21/06. 10 Sheet S5.4 Submit calculations for span and deck 106.1.1 Detail 12/S5.4 siding. • 321/06 11 Sheet S5.5 Submit calculations for HSS 6x6x3/8 for 106.1.1 Detail 1/S5.5 W21 knife plate into column wall. 12 Special Special inspection is required for 1704 Inspection concrete, welding, reinforcing steel, 1705 bolting, welded studs, embed plates, bolts 1707 in concrete, masonry, soils, structural 1708 steel fabrication and erection, adhesive and expansion anchor installation. 13 Structural Structural observation is required for 1709 Observation concrete foundation, reinforcing steel in tilt -up panels before concrete placement at second floor, placement of floor joist and girders. _ Job Name: Triangle Commons — Building Four CITY OF TIGARD Job Address: Sixty - eighth and Dartmouth 13125 SW HALL BLVD. March 22, 2006 TIGARD, OR 97223 SHEET 2 OF 2 MCE Project No.: 060047 STRUCTURAL PLAN REVIEW #2 Plans Dated 02/13/06 Correction Item Page No. Comments Code Reference Made No. 14 General Submit one set of reinforcing steel shop drawings, which have been reviewed and initialed by the project engineer, to be filed with the City of Tigard before placement. 15 General Submit one set of steel open -web joist and girders shop drawings, which have been reviewed and initialed by the project engineer, to be filed with the City of Tigard before placement. 16 General Submit one set of light gage metal framing shop drawings, which have been reviewed and initialed by the project engineer, to be filed with the City of Tigard before placement. 17 General. Submit one set of steel decking shop drawings, which have been reviewed and • initialed by the project engineer, to be filed with the City of Tigard before placement. 18 General Submit one set of stair framing shop drawings, which have been reviewed and initialed by the project engineer, to be filed with the City of Tigard before placement. 19 General Submit one set of miscellaneous steel shop drawings, which have been reviewed and initialed by the project engineer, to be filed with the City of Tigard before placement. 20 General Approved resolution of the above items shall be incorporated into submittal plans before a permit will be issued. Submit four (4) sets of revised plans to the city of _ Tigard. FILE COPY CITY F GIRD April 10, 2006 Approved C (I CITY OF TIGARD See Letter t Follow ................. [ I OREGON Mildren Design Group, PC Per - , ! • . • • - • y P� ' • • `� �:��� . Dan Vasquez 1650 SW 105 Ave, Suite 175 • . V ' T d, OR 97223 S 4.1 Waste( y /0,06 RE: TRIANGLE COMMONS BUILDING FOUR - NEW BUILDING - REVIEW Project Information Building Permit BUP2005 -00654 Construction Type: Tenant Name: Pacific Northwest Property Occupancy Type: , B Address: 11740 SW 68 Ave. Occupant Load: " 336 Area: 33,574 sq ft Stories: 2 The plan review was performed under the State of Oregon Structural Specialty Code (OSSC) 2004 edition and 2004 Oregon Fire Code as amended by TVP&R. The submitted plans are approved subject to the following conditions. 1. The structural review was reviewed and approved by Miller Consulting Engineers March 22, 2006. (review doc. attached). 2. Special inspection is required for concrete, welding reinforcing stee4 bolting, welded studs, • embed plates, bolts in concrete, masonry, soils, structural steel fabrication and erection, adhesive and expansion anchor installation, (as items listed on sheet A0.1 and Miller Consulting Engineers approved review letter). The special inspection agency of record shall furnish inspection reports to the Engineer of Record, Afghan Associates, the General Contractor, and the City of Tigard, Building Division, attention Hap Watkins. All discrepancies shall be brought to the immediate attention of the general contractor for correction. The special inspector shall submit a final signed report stating whether the work requiring special inspection was, to the best of the inspector's knowledge, in conformance with the approved plans and specifications and the applicable workmanship provisions of the code. 1701.3 OSSC 3. Structural Observations is required per section 1709 Oregon Structural Specialty Code (OSSC). The owner shall employ a registered design professional to perform structural observations as defined in Section 1702, OSSC. Structural observations is required for concrete foundation, reinforcing steel in tilt -up panels before concrete placement at second floor, placement of floor joist and girders (as items listed on Miller Consulting Engineers approved review letter). Deficiencies shall be reported in writing to the owner and to the City of Tigard, Building Division, attention Hap Watkins. FYI The structural observations do not waive the framing inspection required by code. 4. Live Loads Posted: The live loads for which each floor has been designed to exceed 50 psf shall 13125 SW Hall Blvd., Tigard, OR 97223 (503) 639 -4171 TDD (503) 684 -2772 • • be conspicuously posted by the owner in that part of each story in which they apply, using durable metal signs, and it shall be unlawful to remove or deface such notices. The occupant of the building shall be responsible for keeping the actual load below the allowable limits. 1603.3 OSSC FIRE LIFE AND SAFETY / GENERAL 1. The main exterior door or doors are permitted to be equipped with key - operated locking \� devices from the egress side provided: d ' ' 1. The locking device is readily distinguishable as locked, 2. A readily visible durable sign is posted on the egress side on or adjacent to door stating. THIS DOOR TO REMAIN UNLOCKED WHEN BUILDING IS OCCUPIED. The sign shall be in letters 1 inch (25 mm) high on a contrasting background. =-Sec. 1008.1.8.3 . 2. All exit doors shall be openable from the inside without the use of a key or any special knowledge or effort Sec. 1008.1.8 3. Exits and exit access doors shall be marked by an approved exit sign readily visible from any direction of egress travel. Access to exits shall be marked by readily visible exit signs in cases where the exit or the path of egress travel is not irnmediatelyvisible to the occupants. Sec. 1011.1 4. Exit signs shall be illuminated at all times and,shall be provided with a second source of power that will provide 1 '/z hours of illumination in case of primary power loss. Sec. 1006.3 FYI Additional exit signs may be required by die city field inspector to dearly indicate the path of egress. 5. The means of egress shall be provided with illumination of not less than 1 foot candle at the floor level anytime the building is occupied. The means of egress illumination shall be provided with a second source of power in case of primary power loss. Sec. 1006.2 9. All elevators, required or provided, shall be located on an accessible route and shall be designed and constructed to comply with Chapter 30 and the Oregon Elevator Specialty Code. 1108.3.2 OSSC 10. Floor drains shall not be located within the dear floor space at a lavatory, water closet, urinal, or bathtub or shower: Floors shall not slope in excess of 1 unit vertical in 50 units horizontal (2- perce slope). Floor drains shall comply with Section 1109.4.5 and be without abrupt changes of leveL Exception: Floor drains may be located within a clearfloor space at a fixture provided the openings in the drain over shall not exceed '/2 inch (12.7 mm) in any diroction and the drain cover shall be no more than 1 18 inch below the level of the sunnundingfinished floor surface. 1109.10.1 OSSC 11. Safety glazing including but not limited to: the following locations: Each unit of glazing shall be permanently identified by the manufacturer. Sec. 2406. Some of these locations are as follows: a. Glazing in ingress and means of egress doors. • • b. Glazing in an individual fixed or operable panel adjacent to a door where the nearest vertical edge is within a 24" arc of the door in a closed position and whose bottom edge is less than 60" above the floor or walking surface except when there is an intervening wall or other permanent barrier between the door and the glazing. 12. Deferred submittals such as Fire Alarm, Fire Sprinkler, Truss Joist Shop Drawings, etc, will be charged a deferred submittal fee based on the valuation of the portion of the work being deferred. The minimum fee shall be $200.00. Deferred Items: As noted on sheet A0.1 Steel joist & joist girders Steel stairs Component anchorage Block retaining wall HVAC Pluming Fire sprinkler Electrical Fire alarm Low voltage NOT PART OF THIS REVIEW: * Electrical * Fire Sprinklers * Mechanical System * Plumbing American with Disabilities Act (ADA): It shall be the responsibility of the Architect, Engineer, Designer, Contractor, Owner and Lessee to research the applicability of the ADA requirements for the structure. The City of Tigard reviews the plans and inspects the structure only for compliance with Chapter 11 of the OSSC, which may not include all of the requirements of the ADA. Approved Plans: 1 set of approved plans, bearing the City of Tigard approval stamp, shall be maintained on the jobsite. The plans shall be available to the Building Division inspectors throughout all phases of construction. 106.3.1 OSSC Certificate of Occupancy: No building or structure shall be used or occupied until the Building Official has issued a certificate of occupancy 109.1 OSSC Premises Identification: Approved numbers or addresses shall be provided for all new buildings in such a position as to be plainly visible and legible from the street or road fronting the property. When submitting revised drawings or additional information, please attach a copy of the enclosed City of Tigard, Letter of Transmittal The letter of transmittal assists the City of Tigard in tracking and processing the documents. Respectfully, / Val Henze — Senior Plans Examiner