Loading...
Plans . 1 • RECEIVEb ,= JUL ®7 2OL . OEV OF TIGARL) :• 4" . _-. 1 HMG ®IVISIOW RECOMMENDED STANDARD NOTES FOR ERO90N CONTROL PLANS 4 5) / A APPROVAL OF TINS EROSION/SEDIMENTATION CONTROL (ESC) PLAN DOES NOT CONSTINTE AN APPROVAL JA G • 0111. OF PERMANENT ROAD OR DRAINAGE DESIGN (LG. S E AND LOCATION OF ROADS PIPES. RESTRCTOIS, p al , OXANNEIS. RETENTION FACTURES UTILITIES. ETC) � � 1' ' ) /(Ifs �� , 401 , �Ng:f1., B. THE IMPLEMENTATION OF THESE ESC PLANS AND THE CONSTRUCTION. YAMTEXANCE, REPLACEME 9g NT, y `( .J t , . AND uPGRAORIG O THESE ESC FACTURES IS THE RESPON586n M NI Y OF THE APPUCANT/CONACTOR Lona /( IL - � y" ALL CONSTRUCTION IS COMPLETED AND APPROVED AND TE ETATICN/LANDSGIP IG IS ESTABLISE0. /L N/ ` `- ' : :A4— :4 - PRIOa�TTO 0945 Ri CTIO . � TH Efi CON NS S � C DO N THIS NO NSTUNN DULY YO FLAGGED R� Lo PA CI �/ \ ..0, . m. - .JB'.. =Ann Loan SHALL BE PCR1NTTED. DC FLACONO so BE YANTARED BY THE r // a .Er J : {({ APPUCANT/CG11RACTOi FOR ME OuRADON OF CONSIRUCTgM 5. DUN AT NNN 0. THE ESC rAfdITES 910iM ON DNS PLAN NOSY BE c S1RUCRD IN CON.UNCTIW a1M ALL O. ARNC , 2 - -NNIR m.o. AND GRADING AMIDES. AND IN N A MANNER AS TO INSURE M IE AT SEDONT AND SFDDIENT LADEN Cf 6 FE 9ECYOC IDI6(R(QDNT J / RATER DO NOT ENTER THE DRAINAGE SYSTEM. ROADWAYS MC LATE MA1E APRMA&E WATER STANDARDS _ ¢Or[NRF. to IEIUNED f E. THE ESC FACILITIES S HOAIN ON TIu PLAN ARE RTE MOO UY REDIINEYENTS FOR AX SITE "'' • I• ' � COIIODONS DuRNG ME CONSTRUCTION PERM THESE ESC FACTURES SHALL BE WOODED AS ". - - - �.. - " I A _ (POI Wm NEEDED FOR OQIPECTED STORM EVENTS AND TO ENSURE THAT SEDIMENT AHD MOMENT -LADEN WATER ---. ".... .y 43..0.9. 00 107 HEAVE M 9R. ,• "((� • FIGURE 3 -1A r. E ESC FAHSmES SHALL BE INSPECTED DAILY BY RE APPUCAN T /CONTRACTOR AND MANTANED AS I / M GRAVFI CONSTRUCTION FNTRANCE NECESSARY TO ENSURE DEN UNC CONTIN ED FTIDOIG f/ • • EROSION CONTROL PLANS G IRE ESC FACTURES ON INACTIVE 91E5 SIULL BE INSPECTED AND YANTAINED A MINIMUM O ONCE A .' / . / TECHNICAL DJIDANCE HANDBOOK MONTH OR HIM 2A HDJRS rOLLONING A STORY EVENT. I TOP H. AT NO E SNAIL YO ONE E THAT O FOOT OF SEOoI N NV ENT BE ALLOYED TO ACwAATE WITHIN A TRAPPED /' CATCH BASH ALL CATOI BASINS AND CONVEYANCE LINES SHALL BE CLEANED PRIOR TO PAVING THE % I • DLANING OPFAATIOI SHALL NOT FLUSH • OEN7 LADEN man INTO TIE OORKSTREAY STMIEN RI2 L STABED WP CNTRANCE5 SHALL BE animus AT INC BEONOINO or CONTIRNCTCN ANT fb1NSTRUCT limp. DIAYEL IA61TNIE KR R D6: DURATION OF THE PRG N ECT. ADDITIONAL MEASURES NAY BE REWIRED TO SJRE WRAF= CONSTRUCTIOWRAF= THAT ALL PAVED AREAS ARE IEPT DEAN FOR THE OURATON CF THE PROJECT. Z. tk:» ' / (SEE no. 3-IA) • • z, Kra NARK S FILTER TER FARM FENCES SHALL BE REMOVED MEN M SUMO T HAVE SED DEN USEM RP PUOSE. BUT NOT - NE ./ BEFORE ME NON -SLOPE AREA HAS BEEN PERMANENTLY PROTECTED AND MEWED. FIGURE 3 -7C 6. FLIER FABRIC C FENCES SHALL BE SwECTED BY APPUANI C/COTRACTOR OWEOU EACH RELV AFTER _ , r GRAVEL EC WIRE MESH INLET BARRIER RAONEALL AND AT LEAST DAILY DURING PROLONGED RAINFALL. ANY REWIRED REPARS SHALL BE MADE NNEDIATnY. I, /. EROSION CONTROL PLANS DAN¢ T • ECO6GAL Gu XANHANDBOOK ' 411Ip - , /, Pr I l� , . 1 . • T \ ` SCALE: I u si . Nn Nr 3 66. N :n.o.5 , / !.• = YO' I TO BE INSTALLED AT ALL CATCH BASKS I I *OR* I MAX MAX °Q � C � y A F • < ''� FFICE 1 • COpy FEEV lbw NN "fr, I 11191 1 .L� ,.I : `' `. OF TIGARD AREA DRAIN y Tr Tox. , L::�' � �V ` 2 • f EOW FOSK swoon lo - 1 1 � I • N wwNN w NNMwNMM� t ' PLAN a � m _ NNY e 6 rmN Q �im&rtxameosn artaxArt: �� ` N C, .N rust Num. w° \ Cond • nE� , � rr -_' – �MwEIMY0E ( j ` 1L,I.�. =z.nj iV N r 2 T mom 1 - may. • Y . ` YIN Ca. TM J - et L • T Fo11ow.,..,.... .... [ 3 NL Tiii 7 - 'III - A / F LC� - l ! / I H 545 lac. c t Y .'Vy co �' b By: Date: CATCH BASIN j 6• FIGURE 3 -7D 3 BIOFII TER BAGS INIFT BARRIFR (TFMPORARY) FIGURF 3 -2 SEDIMENT FENCE • EROSION coma PLANS v -0 TECHNICAL GUIDANCE HANDBOOK – r. e .. J m E O PRO .NAM MOO , • ® NIAnREaH @NGTNEEAlI1G FJ®HPr MOM s. ‘ S � 4P DINE NO CHANGES, MODIFICATIONS OR ® ® MULTI LU6 UT IF NOT STAN ED AIFROV® REPRODUCTIONS TO BE MADE TO Design: M.D.G. La ' r M ■ [Drawing ; Number ` v N. A SE TH DESIEN Checked: _ M.D.G. DUTCH BROTHERS 4897 ® TECH NOT FOR .. � , / AUTHORRATI eheE . D . G E ROSION CONTROL ®® C7t�IS'RU -_ i ION ENGINEER- Date: IAN. co EN 2009 COFFEE TIGARD P LAN OINEERINO BERVICE9 INC , . \ Scale: Sheet Number % �.)i11; R'J�� STASTAMPED \ . � DIMENSIONS QNOTES TAKE l AS SHOWN C pp �r TL S. n PRECED OVER GRAPHRCAL A5- guilt: / C - 6 / ., • •... .,no–om,.x,..<n ... ` f-4 fT� .n, /F'i) i.. {{�, / REPRESENTA I -- ma. aR: AM N17009 iI