Permit ` CITY OF TIGARD MECHANICAL PERMIT
"I' DEVELOPMENT SERVICES u pj / PERMIT #: MEC1999
� I 13125 SW Hall Blvd., Tigard, OR 97223 (503) 639 -4111 DATE ISSUED: 09/27/1999
i f A t PARCEL: 1S136CD -00100
SITE ADDRESS: 11705 SW PACIFIC HWY
SUBDIVISION: ZONING: C -
BLOCK: LOT: JURISDICTION: TIG
CLASS OF WORK: ALT FLOOR FURN: EVAP COOLERS:
TYPE OF USE: COM UNIT HEATERS: VENT FANS: 1
OCCUPANCY GRP: M VENTS W/O APPL: VENT SYSTEMS:
STORIES: BOILERS /COMPRESSORS HOODS:
FUEL TYPES 0 - 3 HP: DOMES. INCIN:
LPG 3 - 15 HP: COMML. INCIN:
MAX INPUT: BTU 15 - 30 HP: REPAIR UNITS:
FIRE DAMPERS ?: 30 - 50 HP: WOODSTOVES:
GAS PRESSURE: 50 + HP: CLO DRYERS:
FURN < 100K BTU: AIR HANDLING UNITS
OTHER UNITS: 1
FURN > =100K BTU: <= 10000 cfm: GAS OUTLETS:
> 10000 cfm:
Remarks: Mechanical TI
Owner: FEES
WYSE INVESTMENT SERVICES Type By Date Amount Receipt
200 SW MARKET ST STE 345 PRMT KJP 09/23/19. $50.00 99- 318562
PORTLAND, OR 97201 PLCK KJP 09/23/19 $12.50 99- 318562
5PCT KJP 09/23/19 $3.50 99- 318562
Phone: 294-0400
Total $66.00 '
Contractor:
PYRAMID DEVELOPMENT & CONSTRUC
13217 NE 54TH PL
BELLEVUE, WA 98005 REQUIRED INSPECTIONS
Mechanical lnsp
Phone: 425-861-6990 Duct Inspection
Reg #: LIC 124929 Final Inspection
This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of Ore.
Specialty Codes and all other applicable laws. All work will be done in accordance with approved
plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended
for more than 180 days. ATTENTION: Oregon law requires you to follow rules adopted in the Oregon
Utility N .. +o Center. Those rules are set forth in OAR 95 :: -0010 through OAR 952 - 001 -0080. t►
You obtain copies of -se rules or direct questions to *UNC • cab (503)246 -9189.
Issu B y 1 , t' il f J AA i,' Permittee Sig attire: .."_„4„.. ,��� ,�`
Call (503) 639 -4175 by 7:00 P.M. for inspections,, eded th next business day
06/14/99 MON 14:15 FAX 503 598 1960 CITY OF TICAIW ._ 00 � _
Plan lec.: •
CITY OF TIGARD Mechanical Permit Application Recd . • .4,
-,.` 13125 S'N HALL BLVD. Commercial and Residential Date Recd b - g - - 99
TIGARD,' OR 97223 Date to P.E. (-P -9.. - '1 ''
(503) 631 -4171, x304 Date to DST t 1 -7 - 4- 1 61 - 9 #
Print or Type Permit ige,/ 999 7 y
Incomplete or illegible applications will not be accepted Call
Name of Development/Projed Description
T v- r7 i c, D.14,4.G)< Table 1A Mechanical Code Qty Price Amt
Street Address A) Permit.Fee
Job ,r s��e# ) 194 ' " M 16.00 •
Address 1 t 7b 6.v./, �G ifiG 1) Furnace to 100,000 BTU
including ducts & vents see footnote 1,2 9.65
Bldg# City/State Zip 2) Furnace 100,000 BTU+
- 1 - 1 6, g-0 1 72 23 including duds & vents see footnote 1,2 12.00
Name (or name of business) 3) Floor Furnace
Owner \A ��(J I>7c -psi GKJic S including vent see footnote 1,2 9.65
Mailing Address 4) Suspended heater, wall heater
� 7 co � • • AU s7 or floor mounted heater see footnote 1,2 9.65
L- 7 5) Vent not included in appliance permit 4.75
City /state Zip Phone _
Check all that apply: Boiler Heat Air
FORT Q O For items 6 -10, see or Pump Cond Qty Price Amt
Name or name of b .603)fes-
slness) foo tnotes 1.,2 Comp
Com
FA.,Dr D , _ _ 4 6) <3HP ;absorb unit to
Occupant Mailing Address M�� 100K BTU
Occu 9.65
P 7) 3 -15 HP;absorb unit
1 170 4•\1- PaGI F I e- `'I i _ 100k to 500k BTU 17.65
City/State Zip Phone 8) 15 - HP; absorb
T l Cy r. / / Q IZ 97 22 3 (020 , r 30 unit .5 -1 mil BTU 24.15
9) 30 -50 HP; absorb
Contractor Name
I PH Q.fl-M t `D E J °l 0..00051 . unit 1 -1.75 mil BTU 36.00
i4air�r.�t r 6 ../T4 10) >50HP; absorb unit
Prior to permit Mailing e ( , Address � >1.75 mil BTU _ 60.15
issuance, a copy l li) / l) L 5 r P�-' 11 Air handling unit to 10,000 CFM
of all licenses City/State )) Zip, Phone 7.00
are required if 132ZU..`L.tJU..t_ r 9 g tVJ 0S' $er)/ 12) Air handling unit 10,000 CFM+
expired in COT Oregon Const_Cont. Board Lic,# p. Date � 11.75
database 1 ( / ry 6P1 -;_-c,0 13) Non - portable evaporate cooler 1
Architect - Name 1 7.00
oct-, 7 hg,-11-- / 71F__. 14) Vent fan connected to a single duct 1 4.75 ��
or Mailing Address
7e0 1! � . 15) Ventilation system not included in
� i ' f7 g i 1 T appliance permit 7.00
City/State Engineer ty/Sttae Zip Phon
$ `r81 7) 16) Hood served by mechanical exhaust
NT 'j2 T ,7 'I b2 , 4)5- . 7.00
Describe work to tr: done: 17) Domestic incinerators
12.00 _
New 0 Reps it 0 Replace with like kind: Yes 0 No 0 18) Commercial or Industrial type incinerator
Residential 0 Commercial 0 48 •
. 19) Repair units
Additional informati m or description of work: 8.40
Q � -� _
20) Wood stove /gas FP /other units /clothe dryer /etc. (b
bgrAl ie. Exi - 11 0 �V I 7.00
NOTE: For Comm;rcial projects only; Units over 400 lbs. require 21) Gas piping one to four outlets
structural g is calcs. See footnote 1 _ 3.75
Type of fuel: oil C.> natural gas 0 LPG 0 electric O 22) More than 4 -per outlet (eac .75
Minimum Permit Fee $50.00 / SUBTOTAL r' `-` ' 60 l D ,
I hereby acknowled )e that I have read this application, that the information 1 °/ 4 SURCHARGE 3 _ o - so
given is correct, the: I am the owner or authorized agent of PLAN REVIEW 25% OF SUBTOTAL °' i'v :1 r
ig.jf the own= , that plans submitted are in compliance with Oregon State laws. Required for ALL commercial permits only x- , ( r
�► A TOTAL ; X ._. , r H
Sig atu Pwne 'Agent Date /
6/(4// Other Inspections and Fees: .
1. Inspections outside of normal business hours (mininum charge -two
Contact Perso Nz me Phone hours) $50.00 per hour
l'411.,) r L - '444 6.--30) - 2. Inspections for which no fee is specifically indicated (minimum
J 88,7-)2 .r charge- half'hour) $50.00 per hour
Foonotes for comriercial projects only: 3. Additional plan review required by changes, additions c r revisions to
1. Provide full schei natic of existing and proposed gas line and pressure. plans (minimum charge -one -half hour) $50.00 per hour
2. Provide drawing; to scale showing existing and proposed mechanical
units. *State Contractor Boiler Certification required
"Residential NC requires site plan showing placement of unit
•
1 :lmechperm.doi; rev 02/4/99 .
11/09/1999 Activities for Case #: MEC1999 -00274 .
10:52:39 AM
Assigned Hold Updated
Activity Description Date 1 Date 2 Date 3 To Done By Disp. Level By Updated Notes
MECC007 Application received 06/18/1999 DEB DONE No Hold DEB 06/25/1999
MECC008 Permit created 06/25/1999 DEB DONE No Hold DEB 06/25/1999
MECC011 Routed to Plans Examiner 06/25/1999 DEB DONE No Hold DEB 06/25/1999
MECC014 Plan checked /Approved by P.E. 08/24/1999 08/24/1999 08/24/1999 RDP DONE No Hold RDP 08/24/1999
MECC015 Reviewed Plans Routed to DSTS 08/24/1999 RDP DONE No Hold RDP 08/24/1999
MECC706 Mechanical Insp 08/24/1999 08/24/1999 10/25/1999 RB PASS No Hold RB 10/26/1999
MECC735 Duct Inspection 08/24/1999 08/24/1999 10/25/1999 RB PASS No Hold RB 10/26/1999
MECC799 Final Inspection 08/24/1999 08/24/1999 10/25/1999 RB FAIL No Hold RB 10/26/1999 Support duct registers to T -grid.
MECC016 DST Post - Review Completed 08/26/1999 BON DONE No Hold BON 08/26/1999
MECCO50 (F) Ready to issue 08/26/1999 BON DONE No Hold BON 08/26/1999 Needs contractor identified.
• MECC090 (F) Issue permit 09/27/1999 DEB DONE No Hold DST 09/27/1999
MECC799 Final Inspection 10/26/1999 10/26/1999 10/26/1999 RB PASS No Hold RB 10/26/1999
MECA799 Final Inspection 10/26/1999 10/26/1999 10/26/1999 RB PASS No Hold JS 10/26/1999 Electrical cover- required be
fails cover. Install support
wires at all ends w/n 8"
Support lighting as per code
requirements.
MECA800 Case Finaled 10/29/1999 JMT DONE No Hold JMT 10/29/1999
•
Page 1 of 1