Permit BUILDING PERMIT
PERMIT *.......: BUPS6 0131
DATE ISSUEDt 03/28/96
COMMUNITY DEVELOPMENT DEPARTMENT
13125 SW Hall Blvd. Tigard, Oregon 97223.8199 (503) 639-4171
PARCEL: 10133CD-01700
SITE AD=CO...: :!1CZ:Z aw PACIFIC MV
SUBDIVIOION....: ZONINOLC-0 .
,
ELOCK....,......: LCT.............:
---------------- ------------ • — -------- __
FLOOR AREAC---------- EXTERIOR WSLL CONSTRUCTION-
CLADS OF WORK.aP ve-/ FIRST....a 1260 sf Nt S2 E: W2
TYPE OF USE ...CON SECOND...; 0 sf PROTECT CPENINGS?----------
TYPE OF CONST.:5N .. 0 1 PI sf Na St ,--
4L.2 Wa
OCCUPANCY ORP.:K.2 TOTAL--; 12f:2 sf ROOF CONST: FIRE RE7?,
OCCUPANCY LOAD: 12 BASEMENT.: 0 sf AREA SEP. RATED: .
STOR.: 0 :AT: 12 ft CARACE...t 0 sf OCCU SEP. RATED
DBMT?: METZ?: REQD SETBACKS-------- REQUIRED -----
FLOOR LOPD..,..: 0 psf LEFT: 0 ft RSHT: 0 ft FIR OPV,LtN SMOX DET..:N
DWELLING UNITS: 0 FRNT. 0 ft REAR: 0 ft FIR ALRM:N HNDICP ACCaY
BEDRMS: 0 E.PT:-:s o IMP SURFACE: 0 PRO CORR.N PARKING: .-.,
4_
VPLUE.$: 650:71
Remarks: Installing 21 x 60 temporary green house.
IMLLAND INC type amount by date rcpt
109 W 175T PLC!', l' 40.63 DON 03/2S/06 96 -277/7
PRMT t, 62.50 „TSD 03/23/96 96-277551
VAN2OUVER wn msco FIRE t, 25.00 JOD 03/20/96 S6-277551
Phone *: szne—r. 0.
Jt-t...1 -.) 3.13 ,TSD 03/28/96 S6-277551
__ ____
APPLICANT
WIT X WRITTEN OWNER APPROVAL..
,
Ph:re *t $ 131.26 TOTAL
Reg #..2
. ------- REDU I RED I NSPECT I ONE -----
This pernit is issued subject to the reg!Alations ccntained ir. the Fratroinka Insp ___
_ . .
Tird ga Municipal Cede, Ctate of Cre. Specialty Codes and all other Misc. Intpoc _____
tion
__
applicable lats. All mrtc will be done in accordance with Final Inspect ion .
approvezi plans. This pereit will expire if ;mr1( is not starl;ed
withir, WI days cf issLarce, cr if tetrl; is susps.r.ded for Ecru _ ___ _
than IN' days. _
_
ttee
Issued By
•
Call for inspeczion — 639-4175
'
, .
. .
02/29/2000 Activities for Case #: BUP96 -00131
9:48:56 AM
Assigned Hold Updated
Activity Description - Date 1 Date 2 Date 3 To Done By Disp. Level By Updated Notes
BUPC007 Application received 03/26/1996 B RECD BON 03/27/1996 •
BUPC008 Permit created 03/26/1996 B PEND BON 03/26/1996
BUPC010 Check for prcl. restrict. BON 03/26/1996
BUPC015 Plans routed to Plans Examiner 03/26/1996 B PEND BON 03/26/1996 Plans reviewed at the counter
by Jim Funk.
BUPCO24 Plans Approved /Routed to DSTs 03/27/1996 JHF APPR JHF 03/27/1996
BUPC460 Devel review cond. met BON 03/26/1996 .
BUPC740 Framing lnsp 04/16/1996 TLP PASS TLP 04/17/1996
BUPC799 Final Inspection 06/21/1999 JMT DONE JMT 06/21/1999 inspection request (research)
sent to Hap
BUPC798 Misc. Inspection 03/27/1996 JHF 03/27/1996
BUPC090 (F) Ready to issue 03/27/1996 B PEND • BON 03/27/1996 Waiting for written approval
from property owner stating
Glenn Bishop can act as
general contractor for this
•
project.
BUPC100 (F) Issue permit 03/28/1996 JSD PASS JD 03/28/1996
BUPC120 Void Permit 09/22/1999 GS DONE No Hold AKJ 09/22/1999 temp greenhouse not on site
•
Page 1 of 1 •