Permit •
.CITY. OF TIGARD BUILDING INSPECTION DIVISION '- • , • 24 -Hour Inspection Line: 639 -4175 Business Line: 639 -4171
• BUP . •
Date Requested 3.--/ AM PM BLD
Location / t 2y 54-- 46/4's+ 4 — Suite MEC
Contact Person Ph 51 PLM
Contractor Ph 0 ' Od3' D
Tenant/Owner
ELC - 0/o C
Retaining Wall ELR
Footing Access:
Foundation FPS
Ftg Drain SGN
ah./Crawl Drain Inspection Notes:
Slab SIT
'os : fllt �
zt Sheath /Shear
Int Sheath /Shear f �/ �
Framing I N. �( Q 1 ( . `e
4 ") • 5 4 I., f
Insulation
Drywall Nailing kAN.y
Firewall
Fire Sprinkler
Fire Alarm AV.a■c■-•>\ �� �
Susp'd Ceiling .A
Roof r v ' / (i •\ Misc: V ` 1
Final
PASS PART FAIL
-
Post & Beam C_d\,-J
Top Out \_.„\Q
G./A/ Vater Service VQ �✓\ S � �•� 42e_t_
Cg /Sanitary Sewer
Gil„ Rain Drains S
Fi
r. PART FAIL
MECHANICAL 6 ` S V_ C ,
Post & Beam +
Rough In
Gas Line
Smoke Dampers
Final
PASS PART FAIL
ELECTRICAL
Service
Rough In
UG /Slab
Low Voltage
Fire Alarm
Final
PASS PART FAIL
SITE
Backfill /Grading
Sanitary Sewer
Storm Drain [ ] Reinspection fee of $ required before next inspection. Pay at City Hall, 13125 SW Hall Blvd
Catch Basin
Fire Supply Line [ ] Please call for reinspection RE: [ ] Unable to inspect - no access
ADA �p
Approach /Sidewalk
37 \ EXt
Other Dat O l I nspector 3
Final
PASS PART FAIL DO NOT REMOVE this inspection record from the job site. •