Loading...
Correspondence hodion August 29, 1997 CITY OF TIGARD Sconzo/Hallstrom OREGON 919 - 124th Avenue NE #101 Bellevue, WA 98005 RE: Car -Toys Building Plan Review 11700 SW Pacific Hwy. PC #: 08-70c BUP #: 97 -0416 Occupancy: M/S3 Construction Type: VN Area: 5864 sq. ft. Occupant Load: (M) 3643/30 = 122 (S) 2221/100 = 23 Submittal documents for the above referenced project have been reviewed for conformance with the applicable 1996 Oregon Specialty Codes and other applicable codes and standards. The following comments are noted: ACCESSIBILITY I 1. Drawing A1.01 - Handicap signs shall have a clear height from grade to the bottom of the sign on 7' 0 I STRUCTURAL ` - I 1. Every page of each set of plans containing drawings and specifications required to be prepared by a State of Oregon licensed engineer /architect must be stamped and signed with the expiration date of that engineer's/architect's license written below his or her signature [OAR 820 -10 -620 and ORS 672 -020 (2)1 A. One set of revised plans, specifications and engineering shall have a fresh stamp and signature. i. Provide plans and specifications stamped appropriately. • 2. In speaking with your engineer, there appears to be an error in their computer program with regards to calculations. Please provide new calculations as well as plans. Beam locations shown on the calculations must be shown on your plans. Please submit three copies of revised submittal documents and a letter indicating your response to the above comments for review. Please call me at (503) 639 -4171 if you have any questions. Sincerely, Gw o e os in, CBO PLA S EXAMINER 13125 SW Hall Blvd., Tigard, OR 97223 (503) 639 -4171 TDD (503) 684 -2772 August 28, 1997 CITY OF TIGARD OREGON . Marcel Desranleau Sconzo /Hallstrom 919 124th Ave. NE Ste. 101 Bellevue, WA 98005 RE: Plans Check Number: 8 -70C This letter is to confirm receipt of your building plans which have been routed to the plans examiner. As a reminder, the associated land use case(s) is /are: SIT97- 0032/SDR97 -0006 • Please be aware you are responsible for satisfying the conditions of the land use case(s) and must submit plans directly to the appropriate staff person(s) indicated on your final order. Your building plans are not routed to the planning or engineering departments; you must satisfy the land use permit conditions independent of the building permit plans review process. After the building plans review process has been completed, your building permit will not be issued without approval from the engineering and planning departments, If you have any questions regarding this notice, please feel free to telephone me and I will be happy to explain further. 1 4ffitt44; _ c Bonnie Mulheam • Development Services Technician • cc: Building file cc: Planning Department cc: Engineering Department 1:1DSTSIBUPLUC.DOT 13125 SW Hall Blvd., Tigard, OR 97223 (503) 639 -4171 TDD (503) 684 -2772 dui° 9 7-- ot9 / (174 October 13, 1997 CITY OF TIGARD OREGON Marcel Desranleau Sconzo /Hallstrom • 919 124th Ave NE #101 Bellevue WA 98005 TRAFFIC IMPACT FEE FOR CAR TOYS Enclosed with this letter you will find a calculation sheet showing the computation that has been performed to determine the amount of the Traffic Impact Fee (TIF) to be paid for the project noted above. The amount of the TIF is $2,833.00. You have two payment options available to you. The first is to pay the TIF at the time you are issued a building permit. The second is to arrange for payment over time by signing a promissory note (if you wish to exercise this second option please contact me for additional details). Traffic impact fees are subject to an annual increase of up to 6% if not paid or financed prior to July 1st of each year. Please note that you may appeal the discretionary decisions made in determining the appropriate category and the amount of the fee based on that category. A notice of appeal must be received by the City Recorder no later than 5:00 p.m. on October 27, 1997 and must be accompanied by the $625.00 appeal fee required by Washington County. Although filed with the City Recorder, an appeal would be heard by the Washington County Hearings Officer. If you have any questions, or if I can be of further service, please contact me at 639-4171. fitzew Bonnie Mulheam Development Services Technician c: TIF file Building file . I.roSTSZTIF.00T 13125 SW Hall Blvd., Tigard, OR 97223 (503) 639 -4171 TDD (503) 684 -2772 i • DATE: /0-13-11 1 PLANS CHEC� K NO 0 PROJECT TITLE: I ` COUNTYWIDE , "CO yS - TRAFFIC IMPACT FEE WORKSHEET £Li t T DeS1 t•/ &-.231 7 (FOR NON- SINGLE FAMILY USES) MAIUNG ADDRESS: /q r lot CITY/ZIP/PHONE: -Bel , % oo TAX MAP NO.: SI314CY SITES 1 D O ; 3 OJ 1- . I1w LAND USE CATEGORY RATE PER TRIP . RESIDENTIAL $ 179.00 ✓BUSINESS AND COMMERCIAL $ 45.00 OFFICE • $ 164.00 • i3•14( to INDUSTRIAL $ 172.00 INSTITUTIONAL $ 74.00 PAYMENT METHOD: CASH/CHECK CREDIT BANCROFT (PROMISSORY NOTE) INSTITUTIONAL ONLY: DEFER TO OCCUPANCY LAND USE CATEGORY I DESCRIPTION OF USE I TTR P RATA5 7S I WEEKEND AVG. TRIP RATE BASIS: I V1 u_ 1l S 61_ s, cg log rtz re_ tJIQ .t , es) CGIUr SA r {d • CALCULATIONS: 1 CAX C (�X d V� UJ k 6 V - p b CUANZA .1 (4 ` CA K"T'W{S s e ro v (6 6 vo-eiLVivit 6uer ‘ fed& , 1 'F =7xlsl s -6y 4-tor otekxlvtiotaibui x tee.dat akte>Irecac ', r ram x vsa_ or r Cr. to_S.x'1 .is x3 .0o) �.$(o1J x 5 I. ?5_ '3.1 ( 2- G Tr - % -�' Cy- dowcs ° (�P CQ 2,9GLTI � �� PROJECT TR GENERATION: (02 .1102- A I ( 4S - .° = Zi c 5 33.2! - 2-, FEE ,D A :, °a ,, , //�� ���� IY/�5 F_OR PCC UN NG RPOSES ONLY ADDITIONAL NOTES: �I �I S z IgILi �iv\ � 5 —r 1-rAczut i t ee e 4.i. ›. `' ,tie oe&c,(,1k:Gi.,-Y\ -Fvr -{�r,: CjyA co I ows TI F (i , $ Cw W' P )4 w40.1 awe eVr: f v (L&h1 t' J &. atom d4O, V' I s Aitsk•11 RASiziLttemiCt aj 100 Tr ) • Z , c ROAD AMT / ' dD u�J , x /000 = y�0 Try Gre 5 1 _ 1 F - TRANSIT I `1 TIF - MT ` bI9 oa PREPARED BYO. itidi :TIFVVKST.DOC (DST) COUNTYWIDE _- L 1k TRAFFIC IMPACT FEE CITY OF TIGARD PAYMENT OPTION FORM OREGON GkiYatArkc t-tui Date Site Address eGkii S Project Name) Plan Check # I realize that I must make a decision on payment of the Traffic Impact Fee (TIF) at this time. Therefore, I request the following (choose whichever option or options are applicable): ❑ Cash or Check ❑ Credit Voucher • El Bancroft or Installment Payments • • or jEr The Ordinance allows for deferral of payment of the TIF until issuance of the occupancy permit if the TIF is greater than $5,000. If the TIF meets this requirement, I also request this option. I understand the TIF must be paid prior to issuance of an occupancy permit. I also understand that the TIF will be recalculated based on the prevailing rates at the time of payment. Please be advised that TIF rates may increase up to six percent each July 1st. This rate increase is not subject to appeal. ,Gtlti OWNE' APPLICAN , • OWNER/APPLICANT c: Building Permit File . Payment Option Notebook i:ldstsUifsub 9196 13125 SW Hall Blvd., Tigard, OR 97223 (503) 639 -4171 TDD (503) 684 -2772 • • • COUNTYWIDE TRAFFIC IMPACT FEE APPEAL INFORMATION' Attached is a copy of the Director's decision on this Traffic Impact Fee assessment or Traffic Impact Fee ' Credit /Offset request. This decision may be appealed and a public hearing held by filing a signed petition for review (appeal) within fourteen (14) calendar days of the date written notice is provided (date mail 7 ' APPEAL PERIOD: Date mailed: /0 — ( to 5:00PM on le - t.7 - Appeal Due Date A motion for reconsideration also may be filed within seven calendar days of the date written notice of the decision is provided (see Section 208 of the Washington County Community Development Code). A motion for reconsideration does not stop the appeal period(s) from running and is available only as an extraordinary remedy for when a mistake of law or fact has occurred. A motion for reconsideration requires a filing fee of $ (e 2-S ,M This decision will be final if an appeal is not filed by the due date(s), and a motion for reconsideration is not granted by the Director. The complete file is available at G ec Z , b ilk ► ( Q gl • (I cr. 17'2L3 for review. J J A petition for review (appeal) must contain the following: 1. The name of the applicant and the relevant casefile /building permit /other development permit number 2. The name and signature of the petitioner filing the petition for review (appeal). If a group consisting of more than one person is filing a single petition for review, one individual shall be designated as the group's representative for all contacts with the Department. All Department communications regarding the petition, including correspondence, shall be with this representative; 3. A statement of the interest of the petitioner 4. The date the notice of decision was sent as specified in the notice; 5. The petition for review (appeal) shall state the relevant facts, applicable ordinance provisions, and relief sought; and 6. The fee of $625.00 for Director's decisions being appealed to the Washington County Hearings Officer. For further anneal information contact: 1/. Le M/Ul l VIo, formt3