Loading...
Correspondence I . • „ , . . , , , NICOLI 1 and Construction Services, Inc. ni &98-- �� L #ma f c 9025 Southwest Center Street hD ` , P.O. Box 23784•Tigard, Oregon 97223 //&'3 ""�IT J (503) 620 - 2086 • FAX (503) 684 -3636 - July 06, 1998 Climate Control 3315 NW 26 Avenue Portland, OR 97210 -1839 Attention: Mark Powell Dear Mark: I have reviewed the installation of the (4) HVAC units on top of the exterior roof structure. I found that the support structure is adequate and attached are the calculations to verify this. I have also checked the capacity of the U 46 joist hanger and found it to be adequate also. The only item I wish you to verify is the hanger supporting the 5 1/8 Glulams are a saddle hanger. The top flange should be entirely over the 10 -3/4" Glulam beam. If you have any questions please feel free to contact me. Sincerely, . PRO/4/i . w� 111 p ,, •RE ON �, , _(V 17,,.'. \ • I EXPIRES: 12 - I James R. Nicoli, P.E. JRN:jh